Study Number |
Date Requested |
Purpose of Study |
Remarks |
Report |
DISIS-2011-001 |
April 01, 2011 |
Definitive Interconnection System Impact Study DISIS-2011-001 |
Posted 7/29/2011 |
Download |
DISIS-2011-001-1 |
January 01, 1900 |
Definitive Interconnection System Impact Restudy DISIS-2011-001-1 |
Posted 12/16/2011 |
Download |
DISIS-2011-001-2 |
April 01, 2011 |
Definitive Interconnection System Impact Restudy DISIS-2011-001-2 |
Posted 5/4/2012 |
Download |
DISIS-2011-001-3 |
April 01, 2011 |
Definitive Interconnection System Impact Restudy DISIS-2011-001-3 |
Posted 2/5/2013 |
Download |
DISIS-2011-001-4 |
April 01, 2011 |
Definitive Interconnection System Impact Restudy DISIS-2011-001-4 |
Posted 12/19/2013 |
Download |
DISIS-2011-001-5 |
April 01, 2011 |
Definitive Interconnection System Impact Restudy DISIS-2011-001-5 |
Posted 5/19/2014 |
Download |
DISIS-2011-001-6 |
April 01, 2011 |
Definitive Interconnection System Impact Restudy DISIS-2011-001-6 |
Posted 7/25/2014 |
Download |
DISIS-2011-002 |
October 01, 2011 |
Definitive Interconnection System Impact Study DISIS-2011-002 |
Posted 1/31/2012 |
Download |
DISIS-2011-002-1 |
October 01, 2011 |
Definitive Interconnection System Impact Restudy DISIS-2011-002-1 |
Posted 6/14/2012 |
Download |
DISIS-2011-002-2 |
October 01, 2011 |
Definitive Interconnection System Impact Restudy DISIS-2011-002-2 |
Posted 2/1/2013 |
Download |
DISIS-2011-002-3 |
October 01, 2011 |
Definitive Interconnection System Impact Restudy DISIS-2011-002-3 |
Posted 12/31/2013 - Revised 1/8/2014 |
Download |
DISIS-2011-002-4 |
October 01, 2011 |
Definitive Interconnection System Impact Restudy DISIS-2011-002-4 |
Posted 5/23/14 - Revised 6/9/14 |
Download |
DISIS-2011-002-5 |
October 01, 2011 |
Definitive Interconnection System Impact Restudy DISIS-2011-002-5 |
Posted 3/20/15 |
Download |
GEN-2011-007 |
February 20, 2012 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 4/1/2013 |
Download |
GEN-2011-007 |
February 20, 2012 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 3/23/2012 |
Download |
GEN-2011-012 |
March 01, 2013 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 5/9/2013 |
Download |
GEN-2011-012 |
March 01, 2013 |
Modification Request to interconnect 104.5 MW on the SWPS transmission system |
Posted 5/9/2013 |
Download |
GEN-2011-016 and GEN-2011-017 |
September 07, 2011 |
Modification Request Impact study (Drop NRIS) |
Posted 4/25/2014 |
Download |
GEN-2011-016 and GEN-2011-017 |
June 11, 2014 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 6/19/2014 |
Download |
GEN-2011-018 |
January 24, 2013 |
Impact Restudy for Generator Modification (Turbine Change) |
Posted 4/12/2013 |
Download |
GEN-2011-019 |
March 01, 2013 |
Modification Request to interconnect 299 MW into OKGE transmission system |
Posted 5/9/2013 |
Download |
GEN-2011-020 |
March 01, 2013 |
Modification Request to interconnect 299 MW on the OKGE transmission system |
Posted 5/9/2013 |
Download |
GEN-2011-021 |
April 20, 2011 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 9/10/2013 |
Download |
GEN-2011-021 |
March 01, 2013 |
Modification Request to interconnect 299 MW on the OKGE transmission system |
Posted 5/9/2013 |
Download |
GEN-2011-022 |
March 01, 2013 |
Modification Request to interconnect 299 MW on the SWPS transmission system |
Posted 4/17/2015 |
Download |
GEN-2011-022 |
March 01, 2013 |
Modification Request to interconnect 299 MW on the SWPS transmission system |
Posted 5/9/2013 |
Download |
GEN-2011-023 |
March 01, 2013 |
Modification Request to interconnect 299 MW into the SUNC transmission system |
Posted 5/9/2013 |
Download |
GEN-2011-024 |
March 11, 2013 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 5/29/2013 |
Download |
GEN-2011-024 |
March 01, 2013 |
Modification Request to interconnect 299 MW on the OKGE transmission system |
Posted 5/9/2013 |
Download |
GEN-2011-025 |
February 24, 2014 |
Impact Restudy for Generator Modification (Turbine Change) |
Posted 4/8/2015 |
Download |
GEN-2011-025 |
February 24, 2014 |
Impact Restudy for Generator Modification (Turbine Change) |
Posted 4/29/2014 |
Download |
GEN-2011-027 |
September 16, 2013 |
Modification Request to interconnect 119.5 MW on the NPPD transmission system |
Posted 11/6/2013 |
Download |
GEN-2011-037 |
September 28, 2011 |
Interim Operational Impact Study per Appendix 5 of GIP |
Posted 11/28/2011 |
Download |
GEN-2011-040 |
October 16, 2011 |
Interim Operational Impact Study per Appendix 5 of GIP |
Posted 1/4/2012 |
Download |
GEN-2011-040 |
June 21, 2013 |
Impact Restudy for Generator Modification (Turbine Change) |
Posted 8/23/2013 |
Download |
GEN-2011-045 |
March 13, 2012 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 5/29/2012 |
Download |
GEN-2011-045 and GEN-2011-046 |
May 30, 2014 |
Modification Request Impact study (Drop NRIS) |
Posted 6/11/2014 |
Download |
GEN-2011-046 |
March 13, 2012 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 5/29/2012 |
Download |
GEN-2011-048 |
March 13, 2012 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 5/29/2012 |
Download |
GEN-2011-048 |
March 13, 2012 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 5/11/2012 |
Download |
GEN-2011-049 |
March 01, 2013 |
Modification Request to interconnect 250 MW on the OKGE transmission system |
Posted 5/9/2013 |
Download |
GEN-2011-049 |
March 01, 2013 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 5/10/2013 |
Download |
GEN-2011-049 |
May 30, 2014 |
Modification Request Impact study (Drop NRIS) |
Posted 6/11/2014 |
Download |
GEN-2011-051 |
March 15, 2012 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 5/13/2014 |
Download |
GEN-2011-054 |
January 09, 2014 |
Impact Restudy for Generator Modification (Turbine Change) |
Posted 1/14/2015 |
Download |
GEN-2011-054 |
January 09, 2014 |
Impact Restudy for Generator Modification (Turbine Change) |
Posted 3/26/2014 |
Download |
GEN-2011-054 |
March 13, 2012 |
Modification Request Impact Study |
Posted 4/1/2013 |
Download |
GEN-2011-054 |
March 13, 2012 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 4/1/2013 |
Download |
GEN-2011-054 |
March 13, 2012 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 5/8/2012 |
Download |
GEN-2011-057 |
January 09, 2015 |
Impact Restudy for Generator Modification (Turbine change) |
Posted 2/18/2015 |
Download |
PISIS-2011-001 |
June 30, 2011 |
Preliminary Interconnection System Impact Study |
Posted 8/31/2011 |
Download |
PISIS-2011-001 |
June 30, 2011 |
Preliminary Interconnection System Impact Study |
Original Posting 8/31/2011 -- Revised Posting 9/8/2011 |
Download |
Please send your requests to GIStudies@spp.org
If you have any questions, please submit a ticket on RMS.
|