Study Number |
Date Requested |
Purpose of Study |
Remarks |
Report |
DISIS-2010-001 NPPD FS |
August 10, 2010 |
Facility Study for NPPD Interconnection Requests |
Posted 3/8/2011 |
Download |
DISIS-2010-001-2 NPPD FS |
April 15, 2011 |
Facility Study for NPPD Interconnection Requests |
Posted 7/12/2011 |
Download |
DISIS-2010-001-4 NPPD FS |
March 31, 2011 |
Definitive Interconnection System Impact Restudy DISIS-2010-001-4 |
Restudy Posted 3/2/2012 |
Download |
DISIS-2010-002 NPPD FS |
March 07, 2011 |
Facility Study for NPPD Interconnection Requests |
Posted 7/29/2011 |
Download |
FCS-2010-001 |
June 15, 2011 |
Facility Study for Shared Facilities in OKGE |
Revised Posting 10/13/2011 |
Download |
FCS-2010-001 |
June 15, 2011 |
Facility Study for Shared Facilities in SPS |
Revised Posting 10/13/2011 |
Download |
FCS-2010-001 |
August 10, 2010 |
Facility Study for Shared Facilities in OG&E |
Posted 2/16/2011 |
Download |
FCS-2010-001 |
August 10, 2010 |
Facility Study for Shared Facilities in WFEC |
Posted 2/16/2011 |
Download |
FCS-2010-001 |
September 10, 2010 |
Facility Study for Shared Facilities in ITC/MIDW |
Posted 3/25/2011 |
Download |
FCS-2010-001 |
September 10, 2010 |
Facility Study for Shared Facilities in SPS |
Posted 4/8/2011 |
Download |
FCS-2010-001 |
September 10, 2010 |
Facility Study for Shared Facilities in OKGE |
Posted 4/12/2011 |
Download |
FCS-2010-001 |
February 14, 2011 |
Facility Study for Shared Facilities in MIDW |
Posted 4/14/2011 |
Download |
FCS-2010-001 |
September 10, 2010 |
Facility Study for Shared Facilities in SPS |
Revised posting 4/25/2011 |
Download |
FCS-2010-002 |
March 07, 2011 |
Facility Study for Facilities in AEP |
Posted 7/29/2011 |
Download |
FCS-2010-002 |
March 07, 2011 |
Facility Study for Shared Facilities in SUNC |
Posted 7/29/2011 |
Download |
FCS-2010-002 |
March 07, 2011 |
Facility Study for Shared Facilities in OKGE |
Posted 7/29/2011 |
Download |
FCS-2010-002 |
March 10, 2011 |
Interconnect 50MW to Westar Energy transmission system |
Posted 2/8/2012 |
Download |
FCS-2010-002 SUNC |
March 07, 2011 |
Facility Study for Shared Facilities in SUNC Spearville-Mullergren 230kV |
Posted 7/18/2012 |
Download |
GEN-2010-001 |
March 07, 2011 |
Interconnect 300MW to the OKGE transmission system |
Re-Posted 3/26/2013 |
Download |
GEN-2010-001 |
March 07, 2011 |
Interconnect 300MW to the OKGE transmission system |
Posted 7/29/2011 |
Download |
GEN-2010-003 |
August 19, 2010 |
Interconnect 100.8 MW to the MIDW transmission system |
Posted 4/7/2011 |
Download |
GEN-2010-005 |
September 10, 2010 |
Interconnection 300MW to Westar Energy transmission system |
Posted 2/8/2011 |
Download |
GEN-2010-006 |
September 10, 2010 |
Interconnect 205MW to the SPS transmission system |
Posted 2/4/2011 |
Download |
GEN-2010-007 |
September 10, 2010 |
Interconnect 73.8MW to the SPS transmission system |
Posted 4/8/2011 |
Download |
GEN-2010-007 |
June 15, 2011 |
Interconnect 73.8MW to the SPS transmission system |
Resived Posting 10/13/2011 |
Download |
GEN-2010-008 |
August 26, 2011 |
Interconnect 65MW to the WFEC transmission system under alternate POI |
Revised Study Posted 9/30/2011 |
Download |
GEN-2010-008 |
September 23, 2010 |
Interconnect 65MW to the WFEC transmission system |
Posted 2/16/2011 |
Download |
GEN-2010-009 |
September 07, 2010 |
Interconnection 165.6MW to the SUNC transmission system |
Posted 3/25/2011 |
Download |
GEN-2010-011 |
September 07, 2010 |
Interconnect 197MW to the OG&E transmission system |
Posted 3/10/2011 |
Download |
GEN-2010-012 |
March 07, 2011 |
Interconnect 65MW to the WFEC transmission system |
Posted 7/29/2011 |
Download |
GEN-2010-013 |
September 10, 2010 |
Interconnect 50.4MW to Westar Energy transmission system |
Posted 2/4/2011 |
Download |
GEN-2010-014 |
September 10, 2010 |
Interconnect 358.8MW to the SPS transmission system |
Posted 4/8/2011 |
Download |
GEN-2010-014 |
June 15, 2011 |
Interconnect 358.8MW to the SPS transmission system |
Revised Posting 10/13/2011 |
Download |
GEN-2010-015 |
September 10, 2010 |
Interconnect 200.1MW to the SUNC transmission system |
Posted 3/25/2011 |
Download |
GEN-2010-015 |
September 10, 2010 |
Interconnect 200.1MW to the SUNC transmission system |
Posted 6/25/2013 |
Download |
GEN-2010-016 |
February 14, 2011 |
Interconnection 199.8MW to ITC GP transmission system |
Posted 4/14/2011 |
Download |
GEN-2010-020 |
September 07, 2011 |
Interconnect 20MW to the SPS transmission syster |
Posted 1/9/2012 |
Download |
GEN-2010-029 |
September 07, 2011 |
Interconnect 450MW to the SUNC transmission system |
Posted 1/11/2012 |
Download |
GEN-2010-029 |
September 07, 2011 |
Interconnect 450MW to the SUNC transmission system |
Revised Restudy Posted 3/1/2013 |
Download |
GEN-2010-036 |
March 06, 2011 |
Interconnection 4.6MW to Westar Energy transmission system |
Posted 7/22/2011 |
Download |
GEN-2010-040 |
March 01, 2011 |
Interconnect 300MW to the OG&E transmission system |
Re-Posted 8/08/2011 |
Download |
GEN-2010-041 |
March 01, 2011 |
Interconnect 10.5MW to the OPPD transmission system |
Posted 6/11/2013 |
Download |
GEN-2010-043 |
March 10, 2011 |
Interconnect 320MW to the WFEC transmission system |
Posted 2/07/2012 |
Download |
GEN-2010-044 |
March 13, 2012 |
Interconnect 99MW to the NPPD transmission system |
Posted 7/10/2012 |
Download |
GEN-2010-045 |
March 07, 2011 |
Interconnect 197.8MW to the SUNC transmission system |
Re-Posted 3/26/2013 |
Download |
GEN-2010-045 |
March 07, 2011 |
Interconect 197.8 to the SUNC transmission system |
Posted 5/28/2014 |
Download |
GEN-2010-045 |
March 07, 2011 |
Interconnect 200MW to the SUNC transmission system |
Posted 7/29/2011 |
Download |
GEN-2010-046 |
March 07, 2011 |
Interconnect 56MW to the SPS transmission system |
Posted 7/29/2011 |
Download |
GEN-2010-048 |
March 07, 2011 |
Interconnect 70MW to the MIDW transmission system |
Posted 7/29/2011 |
Download |
GEN-2010-049 |
March 07, 2011 |
Interconnect 50MW to the MKEC transmission system |
Posted 7/29/2011 |
Download |
GEN-2010-052 |
March 07, 2011 |
Interconnect 300MW to the SPS transmission system |
Posted 7/29/2011 |
Download |
GEN-2010-053 |
March 10, 2011 |
Facility Study for ITC Interconnection Requests |
Posted 12/13/2011 |
Download |
GEN-2010-055 |
August 26, 2011 |
Interconnect 4.5MW to the AEP transmission system |
Posted 2/14/2012 |
Download |
GEN-2010-056 |
September 07, 2011 |
Facility Study for KCPL GMO Interconnection Requests |
Posted 12/6/2011 |
Download |
GEN-2010-057 |
August 29, 2011 |
Interconnect 201MW to the MIDW /WERE transmission system |
Posted 11/18/2011 |
Download |
GEN-2010-058 |
August 26, 2010 |
Interconnect 20MW to the SPS transmission system |
Posted 1/5/2012 |
Download |
GEN-2010-061 |
March 13, 2012 |
Interconnect 179.4 MW to the ITCGP Transmission System |
Posted 1/8/2014 |
Download |
Please send your requests to GIStudies@spp.org