2011 Feasibility Studies |
The following Generator Interconnection Studies have been requested.
|
Study Number |
Date Requested |
Purpose of Study |
Remarks |
Report |
FCS-2011-001 |
December 31, 2010 |
Feasibility Cluster Study |
Posted 2/28/2011 |
Download |
FCS-2011-002 |
March 31, 2011 |
Feasibility Cluster Study |
Re-Posted 8/19/2011 |
Download |
FCS-2011-003 |
June 30, 2011 |
Feasibility Cluster Study |
Posted 8/31/2011 |
Download |
FCS-2011-004 |
September 09, 2011 |
Feasibility Cluster Study |
Posted 12/19/11 |
Download |