2008 Impact Studies
The following Generator Interconnection Studies have been requested.

Study Number Date Requested Purpose of Study Remarks Report
Gen-2008-002 January 22, 2008 Request to interconnect 75MW on the KACP system Impact Study completed August 2008 Download
Gen-2008-003 January 25, 2008 Request to interconnect 120MW on the OKGE system Interim Impact Study completed May 2009 Download
Gen-2008-005 January 28, 2008 Request to interconnect 16MW on the GRDA system Impact study completed August 2008 Download
Gen-2008-006 January 31, 2008 Request to interconnect 30MW on the AEPW system Impact Study completed May 2008 Download
GEN-2008-008 September 10, 2010 Limited Operation Impact Study for Generation Interconnection Request Posted 4/20/2011 Download
GEN-2008-013 February 28, 2012 Restudy to Interconnect 299.04 MW to the OGE transmission system Restudy Posted 5/24/2012 Download
GEN-2008-014 September 10, 2010 Limited Operation Impact Study for Generation Interconnection Request Posted 4/20/2011 Download
GEN-2008-016 March 01, 2008 Interconnect 248 MW into SWPS (Restudy new turbine) Posted 9/14/2010 Download
Gen-2008-016 March 01, 2008 Interconnect 248 MW into SWPS (Restudy) Posted 10/19/2011 Download
GEN-2008-017 March 01, 2013 Limited Operation Impact Study for Generation Interconnection Request Posted 5/13/2013 Download
GEN-2008-018 March 19, 2013 Impact Restudy for Generator Modification (Turbine Change) Posted 6/11/2013 Download
GEN-2008-018 July 08, 2011 Limited Operation Impact Study for Generation Interconnection Request Posted 2/1/2013 Download
GEN-2008-018 July 08, 2011 Limited Operation Impact Study for Generation Interconnection Request Posted 8/23/2011 Download
GEN-2008-018 July 08, 2011 Revised Limited Operation Impact Study for Generation Interconnection Request Posted 9/7/2011 Download
GEN-2008-018 June 12, 2013 Limited Operation Impact Study for Generation Interconnection Request Posted 9/27/2013 Download
GEN-2008-022 April 25, 2014 Impact Restudy for Generator Modification (Turbine change) Posted 7/7/2014 Download
GEN-2008-022 April 25, 2014 Impact Restudy for Generator Modification (Turbine change) Re-Posted 9/2/2014 Download
GEN-2008-023 May 20, 2011 Interconnect 150MW to the AEP transmission system Posted 7/29/2011 Download
GEN-2008-037 September 01, 2010 Interim Impact Study for 100MW on WFEC transmission system Posted 10/19/2010 Download
GEN-2008-038 July 15, 2010 Restudy of Definitive Interconnection System Impact Posted 12/9/2010 Download
GEN-2008-044 July 15, 2010 Interim Operational Study for 227MW on OKGE transmission system Posted 12/30/2010 Download
GEN-2008-047 March 03, 2014 Impact Restudy for Generator Modification (Turbine change) Posted 5/30/2014 Download
GEN-2008-051 March 29, 2011 Limited Operation Impact Study for Generation Interconnection Request Posted 5/24/2011 Download
GEN-2008-051 March 01, 2010 Limited Operation Impact Study for Generation Interconnection Request Posted 1/2/2013 Download
GEN-2008-079 April 20, 2011 Limited Operation Impact Study for Generation Interconnection Request Posted 5/7/2012 Download
GEN-2008-079 October 20, 2010 Limited Operation Impact Study for Generation Interconnection Request Posted 4/20/2011 Download
GEN-2008-079 July 29, 2010 Interim Impact Study for 100MW on SUNC transmission system Posted 10/20/2010 Download
GEN-2008-079 April 20, 2011 Limited Operation Impact Study for Generation Interconnection Request Posted 5/5/2014 Download
GEN-2008-086N02 July 31, 2009 Limited Operation Impact Study for Generation Interconnection Request Posted 1/3/2013 Download
GEN-2008-086N02 July 31, 2009 Limited Operation Impact Study for Generation Interconnection Request Posted 2/7/2013 Download
GEN-2008-088 July 28, 2011 Limited Operation Impact ReStudy for Generation Interconnection Request Posted 9/7/2011 Download
GEN-2008-088 September 10, 2010 Limited Operation Impact Study for Generation Interconnection Request Posted 4/20/2011 Download
GEN-2008-092 February 13, 2015 Impact Restudy for Generator Modification (Turbine Change) Posted 2/27/2015 Download
GEN-2008-098 February 27, 2014 Impact Restudy for Generator Modification (Turbine change) Posted 4/1/2014 Download
GEN-2008-098 September 07, 2010 Restudy to Interconnect 100.8MW to the WR transmission system Restudy Posted 1/27/2012 Download
GEN-2008-098 September 27, 2010 Second restudy to Interconnect 100.8MW to the WR transmission system Posted 4/24/2012 Download
GEN-2008-123N July 25, 2013 Impact Restudy for Generator Modification (Turbine change) Posted 8/19/2013 Download
GEN-2008-123N July 25, 2013 Impact Restudy for Generator Modification (Turbine change) Posted 9/12/2014 Download
GEN-2008-124 November 10, 2010 Limited Operation Impact Study for Generation Interconnection Request Posted 1/7/2011 Download
ICS-2008-001 January 19, 2009 Cluster 1 Impact Study Posted 7/1/2009 Download
ICS-2008-001-1 August 13, 2009 Cluster 1 Impact Study (Restudy) Posted 1/13/2010 Download
ICS-2008-001-2 April 01, 2010 Cluster 1 Impact Study (2nd Restudy) Posted 5/12/2010 Download
ICS-2008-001-3 July 28, 2010 Cluster 1 Impact Study (3rd Restudy) Posted 8/23/2010 Download
ICS-2008-001-4 October 28, 2010 Cluster 1 Impact ReStudy Posted 12/21/2010 Download
ICS-2008-001-5 January 19, 2009 Cluster 1 Impact Re-Study Posted 1/22/13 Download
ICS-2008-001-6 January 19, 2009 Cluster 1 Impact Re-Study Posted 11/18/2013 Download