2012 Feasibility Studies |
The following Generator Interconnection Studies have been requested.
|
Study Number |
Date Requested |
Purpose of Study |
Remarks |
Report |
FCS-2012-001 |
November 29, 2011 |
Feasibility Cluster Study |
Posted 3/1/2012 |
Download |
FCS-2012-002 |
March 30, 2012 |
Feasibility Cluster Study |
Posted 6/22/2012 |
Download |
FCS-2012-003 |
July 23, 2012 |
Feasibility Cluster Study |
Posted 8/16/2012 |
Download |
FCS-2012-004 |
September 30, 2012 |
Feasibility Cluster Study |
Posted 12/20/2012 |
Download |