GI Active Requests
Last Updated: 1/22/2026 Download data as CSV
| Generation Interconnection Number | IFS Queue Number | Current Cluster | Cluster Group | Nearest Town or County | State | TO at POI | In-Service Date (proposed) | Commercial Operation Date | Cessation Date | Original Generator Commercial Op. Date | Capacity (MW) | MAX Summer MW | MAX Winter MW | Service Type | Requested Maximum Injection Capability (MW) | Requested Network Resource Deliverability (MW) | Nameplate Capacity | Generation Type | Fuel Type | Substation or Line | Request Received | Date Withdrawn | Status | JTIQ Participant | JTIQ Commitment | Cause of Delay | Associated Studies | Facility Report | Executed GIA |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| TI-18-0827 | RTOE Transitional Cluster | Weld County | CO | TSGT | 6/24/2022 | 145 | 145 | 145 | ER/NR | 0 | 0 | 0 | Wind | Wind | Redtail 115 Substation | 8/27/2018 | IA FULLY EXECUTED/ON SCHEDULE | ||||||||||||
| TI-17-0224 | RTOE Transitional Cluster | Kit Carson/Cheyenne Counties | CO | TSGT | 9/2/2020 | 104 | 104 | 104 | ER/NR | 0 | 0 | 0 | Wind | Wind | Windtalker 230 Switching Station | 2/24/2017 | IA FULLY EXECUTED/ON SCHEDULE | ||||||||||||
| TI-08-0502 | RTOE Transitional Cluster | Kit Carson County | CO | TSGT | 10/15/2010 | 51 | 51 | 51 | ER/NR | 0 | 0 | 0 | Wind | Wind | Landsman Creek 230 Switching Station | 5/2/2008 | IA FULLY EXECUTED/ON SCHEDULE | ||||||||||||
| TI-08-0204 | RTOE Transitional Cluster | Kit Carson County | CO | TSGT | 11/30/2015 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Wind | Wind | Burlington 230 Bus | 2/4/2008 | IA FULLY EXECUTED/ON SCHEDULE | ||||||||||||
| GI-TC-2024-31 | RTOE Transitional Cluster | Elbert County | CO | TSGT | 10/1/2027 | 12/31/2028 | 398 | 398 | 398 | ER | 0 | 0 | 0 | Hybrid | Solar/Storage | Lincoln - Midway 230 Line | 5/29/2024 | FACILITY STUDY STAGE | GIA delayed due to Affected Systems Study | ||||||||||
| GI-TC-2024-30 | RTOE Transitional Cluster | Morgan County | CO | TSGT | 3/1/2028 | 199.9 | 199.9 | 199.9 | ER/NR | 0 | 0 | 0 | Hybrid | Solar/Storage | Story 230 Substation | 5/29/2024 | IA FULLY EXECUTED/ON SUSPENSION | GIA delayed due to Affected Systems Study | |||||||||||
| GI-TC-2024-29 | RTOE Transitional Cluster | Kit Carson County | NT | TSGT | 9/15/2027 | 10/1/2028 | 170 | 170 | 170 | ER/NR | 0 | 0 | 0 | Wind | Wind | Landsman Creek-Windtalker 230 Line | 5/29/2024 | FACILITY STUDY STAGE | GIA delayed due to Affected Systems Study | ||||||||||
| GI-TC-2024-28 | RTOE Transitional Cluster | Weld County | CO | TSGT | 6/2/2031 | 12/31/2027 | 222.3 | 222.3 | 222.3 | ER/NR | 0 | 0 | 0 | Solar | Photovoltaic | Lloyd Sisson 115 Substation | 5/31/2023 | FACILITY STUDY STAGE | GIA delayed due to Affected Systems Study | ||||||||||
| GI-TC-2024-26 | RTOE Transitional Cluster | Elbert County | CO | TSGT | 1/1/2028 | 8/17/2027 | 199 | 199 | 199 | ER/NR | 0 | 0 | 0 | Hybrid | Solar/Storage | Lincoln – Midway 230 Line | 5/31/2023 | FACILITY STUDY STAGE | GIA delayed due to Affected Systems Study | ||||||||||
| GI-TC-2024-25 | RTOE Transitional Cluster | Weld County | CO | TSGT | 6/2/2031 | 12/1/2028 | 350 | 350 | 350 | ER | 0 | 0 | 0 | Wind | Wind | Ault - Laramie River Station 345 Line | 5/28/2024 | FACILITY STUDY STAGE | GIA delayed due to Affected Systems Study | ||||||||||
| GI-TC-2024-22 | RTOE Transitional Cluster | Weld County | CO | TSGT | 6/2/2031 | 3/1/2028 | 140 | 140 | 140 | ER/NR | 0 | 0 | 0 | Solar | Photovoltaic | Lloyd Sisson 115 Substation | 5/23/2024 | FACILITY STUDY STAGE | GIA delayed due to Affected Systems Study | ||||||||||
| GI-TC-2024-21 | RTOE Transitional Cluster | Montezuma County | CO | TSGT | 7/2/2030 | 12/31/2028 | 125 | 125 | 125 | ER | 0 | 0 | 0 | Hybrid | Solar/Storage | East Cortez 115 Substation | 5/24/2024 | FACILITY STUDY STAGE | GIA delayed due to Affected Systems Study | ||||||||||
| GI-TC-2024-20 | RTOE Transitional Cluster | Lincoln County | CO | TSGT | 9/2/2030 | 7/1/2027 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Solar | Photovoltaic | Big Sandy 230 Substation | 5/29/2024 | FACILITY STUDY STAGE | GIA delayed due to Affected Systems Study | ||||||||||
| GI-TC-2024-19 | RTOE Transitional Cluster | Montrose County | CO | TSGT | 5/3/2027 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Battery/Storage | Montrose 115 Substation | 5/7/2024 | IA FULLY EXECUTED/ON SUSPENSION | GIA delayed due to Affected Systems Study | ||||||||||||
| GI-TC-2024-18 | RTOE Transitional Cluster | Montezuma County | CO | TSGT | 8/2/2029 | 5/31/2027 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Battery/Storage | Lost Canyon 115 Substation | 5/29/2024 | FACILITY STUDY STAGE | GIA delayed due to Affected Systems Study | |||||||||||
| GI-TC-2024-17 | RTOE Transitional Cluster | Kit Carson County | NT | TSGT | 7/2/2030 | 1/1/2030 | 225 | 225 | 225 | ER | 0 | 0 | 0 | Solar | Photovoltaic | Burlington-Wray 230 Line | 5/29/2024 | FACILITY STUDY STAGE | GIA delayed due to Affected Systems Study | ||||||||||
| GI-TC-2024-16 | RTOE Transitional Cluster | Laramie County | WY | TSGT | 6/30/2029 | 400 | 400 | 400 | ER | 0 | 0 | 0 | Wind | Wind | Ault-Laramie River Station 345 Line | 5/16/2023 | IA FULLY EXECUTED/ON SUSPENSION | GIA delayed due to Affected Systems Study | |||||||||||
| GI-TC-2024-15 | RTOE Transitional Cluster | Laramie County | WY | TSGT | 9/30/2029 | 250 | 250 | 250 | ER | 0 | 0 | 0 | Wind | Wind | Big Bear 345 Switching Station | 5/23/2024 | IA FULLY EXECUTED/ON SUSPENSION | GIA delayed due to Affected Systems Study | |||||||||||
| GI-TC-2024-14 | RTOE Transitional Cluster | Weld County | CO | TSGT | 4/2/2031 | 12/31/2028 | 206.01 | 206.01 | 206.01 | ER/NR | 0 | 0 | 0 | Solar | Photovoltaic | Greenhouse 230 Substation | 5/31/2023 | FACILITY STUDY STAGE | GIA delayed due to Affected Systems Study | ||||||||||
| GI-TC-2024-12 | RTOE Transitional Cluster | Yuma County | CO | TSGT | 3/1/2027 | 10/31/2027 | 170 | 170 | 170 | ER | 0 | 0 | 0 | Wind | Wind | Burlington-Wray 230 Line | 5/21/2024 | FACILITY STUDY STAGE | GIA delayed due to Affected Systems Study | ||||||||||
| GI-TC-2024-11 | RTOE Transitional Cluster | Kit Carson County | NT | TSGT | 12/31/2027 | 166.6 | 166.6 | 166.6 | ER | 0 | 0 | 0 | Wind | Wind | Looff 230 Substation (Burlington Expansion) | 5/29/2024 | IA FULLY EXECUTED/ON SUSPENSION | GIA delayed due to Affected Systems Study | |||||||||||
| GI-TC-2024-10 | RTOE Transitional Cluster | Kit Carson County | NT | TSGT | 3/5/2026 | 12/29/2028 | 199 | 199 | 199 | ER | 0 | 0 | 0 | Solar | Photovoltaic | Burlington 230 Substation | 5/23/2024 | FACILITY STUDY STAGE | GIA delayed due to Affected Systems Study | ||||||||||
| GI-TC-2024-09 | RTOE Transitional Cluster | Yuma County | CO | TSGT | 12/5/2028 | 12/31/2026 | 199 | 199 | 199 | ER | 0 | 0 | 0 | Solar | Photovoltaic | North Yuma 230 Substation | 5/26/2023 | FACILITY STUDY STAGE | GIA delayed due to Affected Systems Study | ||||||||||
| GI-TC-2024-08 | RTOE Transitional Cluster | Kit Carson County | NT | TSGT | 12/31/2027 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | Wind | Looff 230 Substation (Burlington Expansion) | 5/26/2023 | IA FULLY EXECUTED/ON SUSPENSION | GIA delayed due to Affected Systems Study | |||||||||||
| GI-TC-2024-07 | RTOE Transitional Cluster | Cheyenne County | CO | TSGT | 11/1/2026 | 12/31/2028 | 199 | 199 | 199 | ER | 0 | 0 | 0 | Solar | Photovoltaic | Burlington - Lamar 230 Line | 5/22/2023 | FACILITY STUDY STAGE | GIA delayed due to Affected Systems Study | ||||||||||
| GI-TC-2024-06 | RTOE Transitional Cluster | Platte County | WY | TSGT | 12/1/2027 | 10/1/2026 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | Wind | LRS-Wayne Child 345 Line | 5/22/2023 | FACILITY STUDY STAGE | GIA delayed due to Affected Systems Study | ||||||||||
| GI-TC-2024-05 | RTOE Transitional Cluster | Platte County | WY | TSGT | 12/1/2027 | 10/1/2026 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | Wind | LRS-Wayne Child 345 Line | 5/22/2023 | FACILITY STUDY STAGE | GIA delayed due to Affected Systems Study | ||||||||||
| GI-TC-2024-04 | RTOE Transitional Cluster | Platte County | WY | TSGT | 12/1/2027 | 10/1/2026 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | Wind | LRS-Wayne Child 345 Line | 5/22/2023 | FACILITY STUDY STAGE | GIA delayed due to Affected Systems Study | ||||||||||
| GI-TC-2024-03 | RTOE Transitional Cluster | Platte/Goshen Counties | WY | TSGT | 10/2/2029 | 12/28/2028 | 160 | 160 | 160 | ER | 0 | 0 | 0 | Solar | Photovoltaic | Monolith 115 Substation | 5/8/2023 | FACILITY STUDY STAGE | GIA delayed due to Affected Systems Study | ||||||||||
| GI-TC-2024-02 | RTOE Transitional Cluster | Lincoln County | CO | TSGT | 8/2/2030 | 6/30/2028 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Hybrid | Solar/Storage | Lincoln 230 Substation | 4/25/2024 | FACILITY STUDY STAGE | GIA delayed due to Affected Systems Study | ||||||||||
| GI-TC-2024-01 | RTOE Transitional Cluster | Lincoln County | CO | TSGT | 8/2/2030 | 6/30/2027 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Hybrid | Solar/Storage | Lincoln 230 Substation | 4/25/2024 | FACILITY STUDY STAGE | GIA delayed due to Affected Systems Study | ||||||||||
| GI-TC-2021-07 | RTOE Transitional Cluster | Delta County | CO | TSGT | 5/1/2024 | 80 | 80 | 80 | ER/NR | 0 | 0 | 0 | Solar | Photovoltaic | Garnet Mesa 115 Substation | 3/15/2021 | IA FULLY EXECUTED/ON SCHEDULE | ||||||||||||
| GI-TC-2021-06 | RTOE Transitional Cluster | Logan County | CO | TSGT | 10/29/2021 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Wind | North Yuma 230 Substation | 3/15/2021 | IA FULLY EXECUTED/ON SCHEDULE | ||||||||||||
| GI-TC-2021-03 | RTOE Transitional Cluster | Dolores County | CO | TSGT | 6/14/2024 | 110 | 110 | 110 | ER/NR | 0 | 0 | 0 | Solar | Photovoltaic | Cahone 115 Substation | 3/15/2021 | IA FULLY EXECUTED/ON SCHEDULE | ||||||||||||
| GI-TC-2021-01 | RTOE Transitional Cluster | Moffat & Rio Blanco Counties | CO | TSGT | 6/30/2024 | 145 | 145 | 145 | ER/NR | 0 | 0 | 0 | Solar | Photovoltaic | Milk Creek 345Switching Station | 3/15/2021 | IA FULLY EXECUTED/ON SCHEDULE | ||||||||||||
| GI-SISS-2026-04 | RTOE Transitional Cluster | Kit Carson County, | CO | TSGT | 1/3/2028 | 6/1/2028 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Battery/Storage | Looff 230 Substation (Burlington Expansion) | 2/9/2026 | DISIS STAGE | ||||||||||||
| GI-SISS-2026-03 | RTOE Transitional Cluster | Kit Carson County, | CO | TSGT | 1/3/2028 | 6/1/2028 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Battery/Storage | Looff 230 Substation (Burlington Expansion) | 2/9/2026 | DISIS STAGE | ||||||||||||
| GI-SISS-2025-06 | RTOE Transitional Cluster | Logan County | CO | TSGT | 9/30/2027 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Battery/Storage | North Yuma 230 Substation | 10/2/2025 | None | |||||||||||||
| GI-SISS-2025-05 | RTOE Transitional Cluster | Kit Carson County | NT | TSGT | 9/30/2027 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Battery/Storage | Burlington 230 Substation | 8/8/2025 | None | |||||||||||||
| GI-SISS-2025-04 | RTOE Transitional Cluster | Kit Carson County | NT | TSGT | 9/30/2027 | 79 | 79 | 79 | ER | 0 | 0 | 0 | Battery/Storage | South Fork 115 Substation | 7/25/2025 | DISIS STAGE | |||||||||||||
| GI-RSC-2025-03 | RTOE Transitional Cluster | Montrose County | CO | TSGT | 11/30/2027 | 50 | 50 | 50 | ER | 0 | 0 | 0 | Battery/Storage | Montrose 115 Sub | 7/18/2025 | None | |||||||||||||
| GI-RSC-2025-02 | RTOE Transitional Cluster | Moffat County | CO | TSGT | 9/1/2029 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Battery/Storage | Craig 230 Sub | 7/18/2025 | None | GIA delayed due to Affected Systems Study | ||||||||||||
| GI-DISIS-2022-44 | RTOE Transitional Cluster | Moffat County | CO | TSGT | 6/25/2030 | 199 | 199 | 199 | ER/NR | 0 | 0 | 0 | Hybrid | Solar/Storage | Craig 345 Substation | 5/31/2022 | IA FULLY EXECUTED/ON SUSPENSION | ||||||||||||
| GI-DISIS-2022-41 | RTOE Transitional Cluster | Kit Carson County | NT | TSGT | 12/30/2028 | 49.6 | 49.6 | 49.6 | ER | 0 | 0 | 0 | Wind | Wind | Bonny Creek 115 Substation | 5/31/2022 | IA FULLY EXECUTED/ON SUSPENSION | ||||||||||||
| GI-DISIS-2022-29 | RTOE Transitional Cluster | Lincoln County | CO | TSGT | 3/16/2029 | 199.9 | 199.9 | 199.9 | ER/NR | 0 | 0 | 0 | Wind | Wind | Duck Creek 230 Switching Station | 5/31/2022 | IA FULLY EXECUTED/ON SCHEDULE | ||||||||||||
| GI-DISIS-2022-28 | RTOE Transitional Cluster | Kit Carson County | NT | TSGT | 12/31/2029 | 199 | 199 | 199 | ER | 0 | 0 | 0 | Hybrid | Solar/Storage | Many Trails 230 Switching Station | 5/31/2022 | IA FULLY EXECUTED/ON SUSPENSION | ||||||||||||
| GI-DISIS-2022-22 | RTOE Transitional Cluster | Kit Carson County | NT | TSGT | 10/1/2028 | 90 | 30 | 30 | ER | 0 | 0 | 0 | Hybrid | Solar/Storage | Devils Switch 115 Switching Station | 5/27/2022 | IA FULLY EXECUTED/ON SCHEDULE | ||||||||||||
| GI-DISIS-2022-17 | RTOE Transitional Cluster | Kiowa County/Prowers County | NT | TSGT | 5/1/2030 | 199 | 199 | 199 | ER | 0 | 0 | 0 | Wind | Wind | Towner 230 Switching Station | 5/27/2022 | IA FULLY EXECUTED/ON SUSPENSION | ||||||||||||
| GI-DISIS-2022-07 | RTOE Transitional Cluster | Weld County | CO | TSGT | 2/27/2029 | 199 | 199 | 199 | ER/NR | 0 | 0 | 0 | Hybrid | Solar/Storage | West Sand Creek 230 Switching Station | 5/24/2022 | IA FULLY EXECUTED/ON SCHEDULE | ||||||||||||
| GI-DISIS-2022-04 | RTOE Transitional Cluster | Kit Carson County | NT | TSGT | 6/29/2027 | 158 | 158 | 158 | ER | 0 | 0 | 0 | Hybrid | Solar/Storage | South Fork 115 Substation | 5/9/2022 | IA FULLY EXECUTED/ON SCHEDULE | ||||||||||||
| GI-DISIS-2022-02 | RTOE Transitional Cluster | Weld County | CO | TSGT | 4/1/2030 | 199 | 199 | 199 | ER | 0 | 0 | 0 | Hybrid | Solar/Storage | Keota 345 Substation | 5/5/2022 | IA FULLY EXECUTED/ON SCHEDULE | ||||||||||||
| GI-DISIS-2021-10 | RTOE Transitional Cluster | Converse County | WY | TSGT | 9/5/2027 | 1/5/2028 | 199 | 199 | 199 | ER/NR | 0 | 0 | 0 | Hybrid | Solar/Storage | Hunton Creek 230 Switching Station | 5/28/2021 | IA FULLY EXECUTED/ON SUSPENSION | |||||||||||
| GI-CS-2025-29 | RTOE Transitional Cluster | Yuma County, | CO | TSGT | 8/1/2031 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Hybrid | Solar/Wind/Storage | Burlington - Wray 230 Line | 10/6/2025 | DISIS STAGE | ||||||||||||
| GI-CS-2025-27 | RTOE Transitional Cluster | Delta County, | CO | TSGT | 4/1/2029 | 199 | 199 | 199 | ER/NR | 0 | 0 | 0 | Thermal | Gas | Starr Nelson 115 Substation | 10/3/2025 | DISIS STAGE | ||||||||||||
| GI-CS-2025-26 | RTOE Transitional Cluster | Kit Carson County, | CO | TSGT | 6/30/2029 | 199 | 199 | 199 | ER | 0 | 0 | 0 | Wind | Wind | Windtalker 230 Substation | 10/2/2025 | DISIS STAGE | ||||||||||||
| GI-CS-2025-25 | RTOE Transitional Cluster | Platte County, | WY | TSGT | 12/1/2030 | 800 | 800 | 800 | ER | 0 | 0 | 0 | Hybrid | Solar/Storage | Laramie River 345 Substation | 10/2/2025 | DISIS STAGE | ||||||||||||
| GI-CS-2025-24 | RTOE Transitional Cluster | Kit Carson County, | CO | TSGT | 12/1/2029 | 225 | 225 | 225 | ER/NR | 0 | 0 | 0 | Wind | Wind | Big Sandy - Windtalker 230 Line | 9/29/2025 | DISIS STAGE | ||||||||||||
| GI-CS-2025-20 | RTOE Transitional Cluster | Morgan County, | CO | TSGT | 12/1/2029 | 199.9 | 199.9 | 199.9 | ER/NR | 0 | 0 | 0 | Hybrid | Solar/Storage | Story 230 Substation | 9/29/2025 | DISIS STAGE | ||||||||||||
| GI-CS-2025-19 | RTOE Transitional Cluster | Morgan County, | CO | TSGT | 12/1/2029 | 199.9 | 199.9 | 199.9 | ER/NR | 0 | 0 | 0 | Hybrid | Solar/Storage | Story 230 Substation | 9/29/2025 | DISIS STAGE | ||||||||||||
| GI-CS-2025-17 | RTOE Transitional Cluster | Moffat County, | CO | TSGT | 6/1/2029 | 199.5 | 199.5 | 199.5 | ER/NR | 0 | 0 | 0 | Hybrid | Solar/Storage | Craig - Meeker 345 Line | 9/26/2025 | DISIS STAGE | ||||||||||||
| GI-CS-2025-16 | RTOE Transitional Cluster | Weld County, | CO | TSGT | 6/1/2029 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Hybrid | Solar/Storage | Henry Lake - Badger Creek 230 Line | 9/26/2025 | DISIS STAGE | ||||||||||||
| GI-CS-2025-11 | RTOE Transitional Cluster | Lincoln County, | CO | TSGT | 12/1/2028 | 199 | 199 | 199 | ER | 0 | 0 | 0 | Wind | Wind | Big Sandy 230 Substation | 9/19/2025 | DISIS STAGE | ||||||||||||
| GI-CS-2025-08 | RTOE Transitional Cluster | Kit Carson, | CO | TSGT | 12/1/2029 | 199 | 199 | 199 | ER | 0 | 0 | 0 | Wind | Wind | Looff 230 Substation (Burlington Expansion) | 9/18/2025 | DISIS STAGE | ||||||||||||
| GI-CS-2025-07 | RTOE Transitional Cluster | Kit Carson, | CO | TSGT | 12/1/2029 | 199 | 199 | 199 | ER | 0 | 0 | 0 | Wind | Wind | Looff 230 Substation (Burlington Expansion) | 9/18/2025 | DISIS STAGE | ||||||||||||
| GI-CS-2025-05 | RTOE Transitional Cluster | Weld County, | CO | TSGT | 12/1/2029 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Solar | Photovoltaic | Redtail 115 Substation | 9/18/2025 | DISIS STAGE | ||||||||||||
| GI-CS-2025-04 | RTOE Transitional Cluster | Laramie County, | WY | TSGT | 11/30/2029 | 330 | 330 | 330 | ER/NR | 0 | 0 | 0 | Hybrid | Wind/Storage | Ault LRS 345 Line | 9/17/2025 | DISIS STAGE | ||||||||||||
| GI-CS-2025-03 | RTOE Transitional Cluster | Kit Carson, | CO | TSGT | 4/1/2028 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Hybrid | Solar/Storage | 230 Windtalker Switching Station | 9/16/2025 | DISIS STAGE | ||||||||||||
| GI-CS-2025-02 | RTOE Transitional Cluster | Adams County, | CO | TSGT | 6/1/2031 | 199 | 199 | 199 | ER/NR | 0 | 0 | 0 | Hybrid | Solar/Storage | 230 West Sand Creek Switching Station | 9/11/2025 | DISIS STAGE | ||||||||||||
| GEN-2022-001 | DISIS-2022-001 | 04 SOUTHEAST | Rogers | OK | 9/23/2025 | 12/31/2025 | 100 | 100 | 100 | ER/NR | 0 | 0 | 555 | Battery/Storage | Elm Street - Shane Testing | 12/30/2021 | ERAS | N/A | Test Commit | ||||||||||
| GEN-2021-SR9 | TEST DATA | Surplus TEST | 01 NORTH | Kansas City TEST DATA | MO | KCPL | 12/13/2022 | 12/1/2022 | 12/7/2022 | 12/7/2022 | 9999 | 99 | 99 | ER/NR test | 0 | 0 | 0 | Battery/Storage | TEST DATA | Hawthorn Power Plant -DT Testing | 8/24/2021 | 12/20/2022 | FEASIBILITY STUDY STAGE | N/A | TEST | View | View | View | |
| GEN-2021-SR8 | Surplus | 03 CENTRAL | Harper | KS | WERE | 11/1/2023 | 42 | 42 | 42 | ER | 0 | 0 | 0 | Solar | Viola 345kV | 5/13/2021 | None | N/A | |||||||||||
| GEN-2021-SR7 | Surplus | 04 SOUTHEAST | Woodward | OK | OKGE | 10/1/2022 | 20 | 20 | 20 | ER | 0 | 0 | 0 | Battery/Storage | Woodward EHV 345kV | 4/28/2021 | 10/28/2021 | WITHDRAWN | N/A | ||||||||||
| GEN-2021-SR6 | Surplus | 04 SOUTHEAST | Woodward | OK | OKGE | 10/1/2023 | 80 | 80 | 80 | ER | 0 | 0 | 0 | Battery/Storage | Woodward EHV 345kV | 4/28/2021 | 10/28/2021 | WITHDRAWN | N/A | ||||||||||
| GEN-2021-SR5 | Surplus | 05 SOUTHWEST | Hansford | TX | SWPS | 3/1/2023 | 126 | 126 | 126 | ER | 0 | 0 | 0 | Battery/Storage | Hitchland 345kV | 5/7/2021 | 8/17/2021 | WITHDRAWN | N/A | ||||||||||
| GEN-2021-SR4 | Surplus | Le Flore | OK | 10/31/2022 | 10/31/2022 | 22.2 | 22.2 | 22.2 | ER/NR | 0 | 0 | 0 | Solar | 2/12/2021 | 9/30/2021 | WITHDRAWN | N/A | ||||||||||||
| GEN-2021-SR3 | Surplus | Oklahoma City | OK | 10/31/2022 | 10/31/2022 | 23.4 | 23.4 | 23.4 | ER/NR | 0 | 0 | 0 | Solar | 2/12/2021 | 9/30/2021 | WITHDRAWN | N/A | ||||||||||||
| GEN-2021-SR2 | Surplus | Muskogee | OK | 10/31/2022 | 10/31/2022 | 21.4 | 21.4 | 21.4 | ER/NR | 0 | 0 | 0 | Solar | 2/12/2021 | 9/30/2021 | WITHDRAWN | N/A | ||||||||||||
| GEN-2021-SR1 | Surplus | Seminole | OK | 10/31/2022 | 10/31/2022 | 81.6 | 81.6 | 81.6 | ER/NR | 0 | 0 | 0 | Solar | 2/5/2021 | 9/30/2021 | WITHDRAWN | N/A | ||||||||||||
| GEN-2021-108 | DISIS-2021-001 | 02 NEBRASKA | Cass | NE | 7/31/2023 | 12/31/2023 | 182.25 | 182.25 | 182.25 | ER/NR | 0 | 0 | 0 | Solar | OPPD 345KV Cass County Substation | 5/20/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-107 | DISIS-2021-001 | 03 CENTRAL | Pottawatomie | KS | 7/31/2023 | 12/31/2023 | 201.6 | 201.6 | 201.6 | ER/NR | 0 | 0 | 0 | Battery/Storage | Evergy 345kV Jeffrey Energy Center | 5/20/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-106 | DISIS-2021-001 | 02 NEBRASKA | Thayer | NE | 7/31/2023 | 12/31/2023 | 102.06 | 102.06 | 102.06 | ER/NR | 0 | 0 | 0 | Solar | NPPD 161kV Hebron Substation | 5/20/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-105 | DISIS-2021-001 | 02 NEBRASKA | Lincoln | NE | 9/5/2026 | 12/1/2026 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Solar | Line side tap using three breaker ring bus on 230kV Feeder from Gerald Gentleman to North Platte | 5/26/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-104 | DISIS-2021-001 | 04 SOUTHEAST | Bossier | LA | 9/5/2026 | 12/1/2026 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Solar | Direct Injection at 138kV buss at Red Point Substation | 5/26/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-103 | DISIS-2021-001 | 03 CENTRAL | Johnson | KS | 8/1/2025 | 9/1/2025 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Battery/Storage | Evergy's Waverly Substation 115kV bus | 5/25/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-102 | DISIS-2021-001 | 03 CENTRAL | Douglas | KS | 8/1/2025 | 9/1/2025 | 80 | 80 | 80 | ER/NR | 0 | 0 | 0 | Battery/Storage | Evergy's Midland Substation 115kV bus | 5/25/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-101 | DISIS-2021-001 | 03 CENTRAL | Douglas | KS | 8/1/2025 | 9/1/2025 | 159 | 159 | 159 | ER/NR | 0 | 0 | 0 | Solar | POI is Evergy's Midland Station Northeast of Lawrence, KS | 5/25/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-100 | DISIS-2021-001 | 02 NEBRASKA | Mercer | ND | BEPC | 9/15/2026 | 12/1/2026 | 50 | 40 | 30 | ER/NR | 0 | 0 | 0 | Hybrid | Yourtown 345kV Substation | 5/24/2021 | DISIS STAGE | N/A | ||||||||||
| GEN-2021-099 | DISIS-2021-001 | 04 SOUTHEAST | Ellis | OK | 11/1/2024 | 1/1/2025 | 250 | 260.4 | 260.4 | ER/NR | 0 | 0 | 0 | Wind | Bobcat 345 kV | 4/30/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-098 | DISIS-2021-001 | 04 SOUTHEAST | Dewey | OK | 11/1/2025 | 12/31/2025 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Wind | Dewey District 138 kV Substation | 5/24/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-097 | DISIS-2021-001 | 05 SOUTHWEST | Elida | NM | 11/1/2025 | 12/21/2025 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Wind | Hisel 230 kV Substation | 5/24/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-096 | DISIS-2021-001 | 03 CENTRAL | Coffey | KS | 11/1/2023 | 5/1/2024 | 503.5 | 503.5 | 503.5 | ER/NR | 0 | 0 | 0 | Solar | Wolf Creek - Benton 345 kV | 4/29/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-095 | DISIS-2021-001 | 01 NORTH | Mercer | ND | BEPC | 8/1/2025 | 4/1/2026 | 446.5 | 446.5 | 446.5 | ER | 0 | 0 | 0 | Thermal | Combustion Turbine | AVS 345kV substation | 4/30/2021 | DISIS STAGE | N/A | |||||||||
| GEN-2021-094 | DISIS-2021-001 | 01 NORTH | Mercer | ND | BEPC | 8/1/2024 | 4/1/2025 | 446.5 | 446.5 | 446.5 | ER | 0 | 0 | 0 | Thermal | Combustion Turbine | AVS 345kV Substation | 4/30/2021 | DISIS STAGE | N/A | |||||||||
| GEN-2021-093 | DISIS-2021-001 | 04 SOUTHEAST | Oklahoma | OK | 6/1/2023 | 6/1/2025 | 109 | 109 | 132 | ER/NR | 0 | 0 | 0 | Thermal | Gas Turbine | Tinker | 4/30/2021 | DISIS STAGE | N/A | ||||||||||
| GEN-2021-092 | DISIS-2021-001 | 05 SOUTHWEST | Hansford | TX | 1/15/2026 | 3/15/2026 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Battery/Storage | Xcel Hansford 115kV substation | 4/30/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-091 | DISIS-2021-001 | 04 SOUTHEAST | Pontotoc | OK | 10/1/2025 | 12/31/2025 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Hybrid | Solar | OG&E's Blue River 138kV Substation | 4/29/2021 | DISIS STAGE | N/A | ||||||||||
| GEN-2021-090 | DISIS-2021-001 | 05 SOUTHWEST | Yoakum | TX | 6/15/2022 | 7/15/2022 | 400 | 400 | 400 | ER/NR | 0 | 0 | 0 | Solar | Yoakum 345kV Substation | 4/30/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-089 | DISIS-2021-001 | 05 SOUTHWEST | Hockley | TX | 12/31/2026 | 400 | 400 | 400 | ER/NR | 0 | 0 | 0 | Hybrid | Solar | Tuco-Yoakum-Hobbs 345kV | 4/29/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-088 | DISIS-2021-001 | 04 SOUTHEAST | Cleveland | OK | 9/23/2024 | 12/24/2024 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Battery/Storage | 138 kV Canadian SW Substation | 4/29/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-087 | DISIS-2021-001 | 03 CENTRAL | Seward | KS | 10/15/2027 | 12/31/2027 | 185 | 185 | 185 | ER/NR | 0 | 0 | 0 | Hybrid | Solar | Walkemeyer - North Cimarron 115kV | 4/29/2021 | DISIS STAGE | N/A | ||||||||||
| GEN-2021-086 | DISIS-2021-001 | 04 SOUTHEAST | Howard | AR | 10/15/2027 | 12/31/2027 | 165 | 165 | 165 | ER/NR | 0 | 0 | 0 | Hybrid | Solar | Okay - Turk 138kV | 4/29/2021 | DISIS STAGE | N/A | ||||||||||
| GEN-2021-085 | DISIS-2021-001 | 03 CENTRAL | Ford | KS | 12/15/2027 | 12/31/2027 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Hybrid | Solar | Crooked Creek - Fort Dodge 115kV | 4/29/2021 | DISIS STAGE | N/A | ||||||||||
| GEN-2021-084 | DISIS-2021-001 | 03 CENTRAL | Kearney | KS | 10/15/2027 | 12/31/2027 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Hybrid | Solar | Williamson - Fletcher 115kV | 4/29/2021 | DISIS STAGE | N/A | ||||||||||
| GEN-2021-083 | DISIS-2021-001 | 05 SOUTHWEST | Chaves | NM | 7/1/2024 | 9/1/2024 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Solar | SPP / Central Valley Electric Cooperative (CV) 69 kV transmission line | 4/26/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-082 | DISIS-2021-001 | 05 SOUTHWEST | Lea | NM | 7/1/2024 | 9/1/2024 | 80 | 80 | 80 | ER/NR | 0 | 0 | 0 | Solar | LE 69 kV Lewis substation | 4/23/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-081 | DISIS-2021-001 | 05 SOUTHWEST | Lea | NM | 4/1/2024 | 6/1/2024 | 55 | 55 | 55 | ER/NR | 0 | 0 | 0 | Solar | SPP / Lea County Electric Cooperative (LE) 69 kV transmission line | 4/26/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-080 | DISIS-2021-001 | 05 SOUTHWEST | Lea | NM | 7/1/2024 | 9/1/2024 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Solar | SPP / Lea County Electric Cooperative (LE) 69 kV | 4/26/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-079 | DISIS-2021-001 | 04 SOUTHEAST | Delaware (OK) / Benton (AR) | OK/AR | 7/31/2023 | 8/31/2023 | 140 | 140 | 140 | ER/NR | 0 | 0 | 0 | Solar | Flint Creek to Tonnece 345 kV | 4/30/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-078 | DISIS-2021-001 | 03 CENTRAL | Finney | KS | 10/15/2027 | 12/31/2027 | 160 | 160 | 160 | ER/NR | 0 | 0 | 0 | Hybrid | Solar | EPC - 115kV | 4/29/2021 | DISIS STAGE | N/A | ||||||||||
| GEN-2021-077 | DISIS-2021-001 | 03 CENTRAL | Pettis | MO | 7/1/2025 | 8/1/2025 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Solar | Windsor to AEC Sedalia 161 kV | 4/30/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-076 | DISIS-2021-001 | 03 CENTRAL | Ellis | KS | 7/31/2023 | 12/31/2023 | 113 | 113 | 113 | ER/NR | 0 | 0 | 0 | Solar | Midwest Energy 161kV Post Rock Substation | 5/13/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-075 | DISIS-2021-001 | 03 CENTRAL | Prowers | CO | 9/1/2025 | 12/31/2025 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Wind | Finney - Lamar 345 kV | 5/19/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-074 | DISIS-2021-001 | 03 CENTRAL | Prowers | CO | 9/1/2025 | 12/31/2025 | 500 | 500 | 500 | ER/NR | 0 | 0 | 0 | Solar | Finney - Lamar 345 kV | 5/19/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-073 | DISIS-2021-001 | 02 NEBRASKA | Lincoln | NE | 6/1/2024 | 12/1/2024 | 240 | 240 | 240 | ER/NR | 0 | 0 | 0 | Solar | 345 kV BUS at Gerald Gentleman Substation | 5/19/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-072 | DISIS-2021-001 | 01 NORTH | Mercer | ND | BEPC | 6/1/2024 | 12/1/2024 | 600 | 600 | 600 | ER/NR | 0 | 0 | 0 | Solar | 345kV Transmission Line from Antelope Valley to Leland Olds Substation | 5/19/2021 | DISIS STAGE | N/A | ||||||||||
| GEN-2021-071 | DISIS-2021-001 | 04 SOUTHEAST | Noble | OK | 9/1/2025 | 12/1/2025 | 403.2 | 403.2 | 403.2 | ER | 0 | 0 | 0 | Wind | OKGE Spring Creek – Sooner 345kV | 4/26/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-070 | DISIS-2021-001 | 03 CENTRAL | Hodgeman and Ford | KS | 8/1/2027 | 11/1/2027 | 504 | 504 | 504 | ER | 0 | 0 | 0 | Wind | SUNC Spearville - Holcomb 345kV | 4/26/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-069 | DISIS-2021-001 | 03 CENTRAL | Hodgeman and Ford | KS | 8/1/2027 | 11/1/2027 | 249.6 | 249.6 | 249.6 | ER | 0 | 0 | 0 | Wind | SUNC Spearville - Holcomb 345kV | 4/26/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-068 | DISIS-2021-001 | 03 CENTRAL | Hodgeman and Ford | KS | 9/1/2025 | 12/1/2025 | 249.6 | 249.6 | 249.6 | ER | 0 | 0 | 0 | Wind | SUNC Spearville - Holcomb 345kV | 4/26/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-067 | DISIS-2021-001 | 04 SOUTHEAST | Delaware | OK | 2/15/2025 | 6/1/2025 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Hybrid | Solar | Tap Grove - Jay 138kV | 4/28/2021 | DISIS STAGE | N/A | ||||||||||
| GEN-2021-066 | DISIS-2021-001 | 04 SOUTHEAST | Pittsburg | OK | 2/15/2025 | 6/1/2025 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Hybrid | Solar | McAlester WFEC 138 kV | 4/28/2021 | DISIS STAGE | N/A | ||||||||||
| GEN-2021-065 | DISIS-2021-001 | 04 SOUTHEAST | Pittsburg | OK | 2/15/2025 | 6/1/2025 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Hybrid | Solar | Talawanda to C-River 138kV | 4/28/2021 | DISIS STAGE | N/A | ||||||||||
| GEN-2021-064 | DISIS-2021-001 | 04 SOUTHEAST | Caddo | OK | 2/15/2025 | 6/1/2025 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Hybrid | Solar | Carnegie South 138kV | 4/28/2021 | DISIS STAGE | N/A | ||||||||||
| GEN-2021-063 | DISIS-2021-001 | 04 SOUTHEAST | McCurtain | OK | 2/15/2025 | 6/1/2025 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Hybrid | Solar | Craig JCT 138kV | 4/28/2021 | DISIS STAGE | N/A | ||||||||||
| GEN-2021-062 | DISIS-2021-001 | 02 NEBRASKA | Lincoln | NE | 12/31/2026 | 108 | 110 | 110 | ER | 0 | 0 | 0 | Solar | Canaday 230 kV Substation | 4/29/2021 | DISIS STAGE | N/A | ||||||||||||
| GEN-2021-061 | DISIS-2021-001 | 02 NEBRASKA | Johnson and Gage | KS | 12/31/2027 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | Beatrice 115 kV substation | 4/29/2021 | DISIS STAGE | N/A | ||||||||||||
| GEN-2021-060 | DISIS-2021-001 | 03 CENTRAL | Barber | KS | 12/31/2026 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Solar | Pony Meadows 138 kV substation | 4/29/2021 | DISIS STAGE | N/A | ||||||||||||
| GEN-2021-059 | DISIS-2021-001 | 03 CENTRAL | Nemaha | KS | 4/30/2021 | 400 | 400 | 400 | ER | 0 | 0 | 0 | Wind | Kelley 161 kV substation | 4/29/2021 | DISIS STAGE | N/A | ||||||||||||
| GEN-2021-058 | DISIS-2021-001 | 01 NORTH | Madison | NE | NPPD | 12/31/2027 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | Holt 345kV substation | 4/29/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-057 | DISIS-2021-001 | 02 NEBRASKA | Antelope | NE | 12/31/2027 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | Antelope 345kV substation | 4/29/2021 | DISIS STAGE | N/A | ||||||||||||
| GEN-2021-056 | DISIS-2021-001 | 04 SOUTHEAST | Texas County | TX | 12/31/2027 | 1000 | 1000 | 1000 | ER | 0 | 0 | 0 | Wind | Welsh 345kV Substation | 4/29/2021 | DISIS STAGE | N/A | ||||||||||||
| GEN-2021-055 | DISIS-2021-001 | 04 SOUTHEAST | Red River | TX | 12/31/2027 | 250 | 250 | 250 | ER | 0 | 0 | 0 | Solar | Welsh 345kV Substation | 4/29/2021 | DISIS STAGE | N/A | ||||||||||||
| GEN-2021-054 | DISIS-2021-001 | 04 SOUTHEAST | Red River | TX | 12/31/2027 | 250 | 250 | 250 | ER | 0 | 0 | 0 | Solar | Welsh 345kV Substation | 4/29/2021 | DISIS STAGE | N/A | ||||||||||||
| GEN-2021-053 | DISIS-2021-001 | 04 SOUTHEAST | Red River | TX | 12/31/2027 | 500 | 500 | 500 | ER | 0 | 0 | 0 | Solar | Welsh 345kV Substation | 4/29/2021 | DISIS STAGE | N/A | ||||||||||||
| GEN-2021-052 | DISIS-2021-001 | 04 SOUTHEAST | Muskogee | OK | 12/31/2025 | 75 | 75 | 75 | ER | 0 | 0 | 0 | Battery/Storage | Pecan Creek 345kV substation | 4/29/2021 | DISIS STAGE | N/A | ||||||||||||
| GEN-2021-051 | DISIS-2021-001 | 03 CENTRAL | Henry | MO | 7/31/2025 | 12/31/2025 | 75 | 75 | 75 | ER/NR | 0 | 0 | 0 | Battery/Storage | 161kV Stilwell-Clinton Line | 4/30/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-050 | DISIS-2021-001 | 03 CENTRAL | Henry | MO | 7/31/2025 | 12/31/2025 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Solar | 161kV Stilwell-Clinton Line | 4/30/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-049 | DISIS-2021-001 | 02 NEBRASKA | Lancaster | NE | 7/31/2025 | 12/31/2025 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Solar | Wagener 115kV Substation | 4/30/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-048 | DISIS-2021-001 | 02 NEBRASKA | Lancaster | NE | 7/31/2025 | 12/31/2025 | 75 | 75 | 75 | ER/NR | 0 | 0 | 0 | Battery/Storage | Wagener 115kV Substation | 4/30/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-047 | DISIS-2021-001 | 04 SOUTHEAST | Mayes | OK | 3/1/2026 | 10/1/2026 | 250 | 250 | 250 | ER | 0 | 0 | 0 | Solar | Tulsa North (Bus #509852) - Grand River Energy Center Tap (Bus #512865) #345 kV Line | 4/29/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-046 | DISIS-2021-001 | 03 CENTRAL | Prowers, Kiowa | CO | 7/1/2025 | 12/31/2025 | 400 | 406.02 | 406.02 | ER/NR | 0 | 0 | 0 | Wind | Tap 345 kV line between Lamar and Finney | 4/28/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-045 | DISIS-2021-001 | 03 CENTRAL | Sherman, Wallace | KS | 7/1/2025 | 12/31/2025 | 300 | 303 | 303 | ER/NR | 0 | 0 | 0 | Wind | Sunflower Electric Power Corp's 345 kV Mingo substation | 4/28/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-044 | DISIS-2021-001 | 02 NEBRASKA | Dundy | NE | 7/1/2025 | 12/31/2025 | 300 | 303 | 303 | ER/NR | 0 | 0 | 0 | Wind | Nebraska Public Power District's (NPPD) 345 kV Red Willow substation | 4/28/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-043 | DISIS-2021-001 | 02 NEBRASKA | Lancaster | NE | 3/31/2024 | 6/1/2024 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Battery/Storage | 8000 SW 12th (Rokeby) Station, 115kV Bus | 4/30/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-042 | DISIS-2021-001 | 03 CENTRAL | Jackson | MO | 3/31/2023 | 6/1/2023 | 50 | 100 | 100 | ER/NR | 0 | 0 | 0 | Battery/Storage | Independence Power & Light, Blue Valley Substation, 161kV Bus | 4/30/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-041 | DISIS-2021-001 | 04 SOUTHEAST | Canadian | OK | 3/31/2024 | 6/1/2024 | 100 | 100.657 | 100.657 | ER/NR | 0 | 0 | 0 | Battery/Storage | OKGE 138 kV Mustang (#514861) | 4/30/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-040 | DISIS-2021-001 | 02 NEBRASKA | Cass | NE | 3/31/2024 | 6/1/2024 | 200 | 400 | 400 | ER/NR | 0 | 0 | 0 | Battery/Storage | OPPD District, Cass County Power Plant Substation, 345kV Bus | 4/30/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-039 | DISIS-2021-001 | 02 NEBRASKA | Cass | NE | 3/31/2023 | 6/1/2023 | 100 | 200 | 200 | ER/NR | 0 | 0 | 0 | Battery/Storage | OPPD District, North Omaha Power Plant Substation, 161kV Bus (1211 Substation) | 4/30/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-038 | DISIS-2021-001 | 04 SOUTHEAST | Titus | TX | 3/31/2024 | 6/1/2024 | 200 | 201.32 | 201.32 | ER/NR | 0 | 0 | 0 | Battery/Storage | AEP 345 kV Welsh (#508359) Substation | 4/30/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-037 | DISIS-2021-001 | 02 NEBRASKA | Saline | NE | 7/31/2023 | 12/31/2023 | 244.22 | 244.22 | 244.22 | ER/NR | 0 | 0 | 0 | Solar | NPPD 161kV Sheldon Substation | 5/14/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-036 | DISIS-2021-001 | 04 SOUTHEAST | Little River | AR | 7/31/2023 | 12/31/2023 | 204.12 | 204.12 | 204.12 | ER/NR | 0 | 0 | 0 | Solar | Tap Southwestern Electric Power Co. Craig to Patterson Transmission Line | 5/14/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-035 | DISIS-2021-001 | 03 CENTRAL | Grant | KS | 7/31/2023 | 12/31/2023 | 113 | 113 | 113 | ER/NR | 0 | 0 | 0 | Solar | Tap Sunflower Santana 161kV Transmission Line | 5/14/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-034 | DISIS-2021-001 | 02 NEBRASKA | Dawson | NE | 7/31/2023 | 12/31/2023 | 113 | 113 | 113 | ER/NR | 0 | 0 | 0 | Solar | NPPD 230KV Canaday Substation | 5/13/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-033 | DISIS-2021-001 | 04 SOUTHEAST | Franklin | AR | 7/31/2023 | 12/31/2023 | 204.12 | 204.12 | 204.12 | ER/NR | 0 | 0 | 0 | Solar | 161kV Branch substation | 5/14/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-032 | DISIS-2021-001 | 04 SOUTHEAST | Choctaw | OK | 7/31/2023 | 12/31/2023 | 255.15 | 255.15 | 255.15 | ER/NR | 0 | 0 | 0 | Solar | Western Farmers 345kV Hugo Substation | 5/14/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-031 | DISIS-2021-001 | 04 SOUTHEAST | Choctaw | OK | 7/31/2023 | 12/31/2023 | 201.6 | 201.6 | 201.6 | ER/NR | 0 | 0 | 0 | Battery/Storage | Western Farmers 345kV Hugo Substation | 5/14/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-030 | DISIS-2021-001 | 03 CENTRAL | Linn KS and Bates MO | KS, MO | 7/31/2023 | 12/31/2023 | 510.3 | 510.3 | 510.3 | ER/NR | 0 | 0 | 0 | Solar | Evergy 345kV La Cygne Substation | 5/14/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-029 | DISIS-2021-001 | 03 CENTRAL | Linn KS and Bates MO | KS, MO | 7/31/2023 | 12/31/2023 | 253.2 | 253.8 | 253.8 | ER/NR | 0 | 0 | 0 | Battery/Storage | Evergy 345kV La Cygne Substation | 5/14/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-028 | DISIS-2021-001 | 04 SOUTHEAST | Woodward | OK | 7/31/2023 | 12/31/2023 | 204.12 | 204.12 | 204.12 | ER/NR | 0 | 0 | 0 | Solar | Western Farmers 161 Mooreland Substation | 5/14/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-027 | DISIS-2021-001 | 02 NEBRASKA | Gage | NE | 7/31/2023 | 12/31/2023 | 102.06 | 102.06 | 102.06 | ER/NR | 0 | 0 | 0 | Solar | NPPD 161kV Sheldon Substation | 5/14/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-026 | DISIS-2021-001 | 03 CENTRAL | Newton | MO | 7/31/2023 | 12/31/2023 | 204.12 | 204.12 | 204.12 | ER/NR | 0 | 0 | 0 | Solar | Tap SWPA 161kV Springfield to La Russel Transmission Line | 5/14/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-025 | DISIS-2021-001 | 04 SOUTHEAST | Woodward | OK | 7/31/2023 | 7/31/2023 | 203.04 | 203.04 | 203.04 | ER/NR | 0 | 0 | 0 | Wind | Western Farmers 161kV Mooreland Substation | 5/14/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-024 | DISIS-2021-001 | 01 NORTH | LaMoure | ND | WAPA | 7/31/2023 | 12/31/2023 | 203.04 | 203.04 | 203.04 | ER/NR | 0 | 0 | 0 | Wind | WAPA 230kV Jamestown Substation | 5/14/2021 | DISIS STAGE | N/A | ||||||||||
| GEN-2021-023 | DISIS-2021-001 | 03 CENTRAL | Sumner | KS | 7/31/2023 | 12/31/2023 | 306.18 | 306.18 | 306.18 | ER/NR | 0 | 0 | 0 | Solar | 138kV Wild Plains Station | 5/14/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-022 | DISIS-2021-001 | 04 SOUTHEAST | Muskogee | OK | 9/1/2026 | 12/31/2026 | 470 | 470 | 470 | ER | 0 | 0 | 0 | Solar | Northeastern 345kV Substation | 4/20/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-021 | DISIS-2021-001 | 04 SOUTHEAST | Lemar and Red River | TX | 9/1/2026 | 12/31/2026 | 450 | 450 | 450 | ER | 0 | 0 | 0 | Solar | Hugo 138kV Substation | 4/20/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-020 | DISIS-2021-001 | 05 SOUTHWEST | Lea County | NM | 9/15/2023 | 12/15/2023 | 74 | 74 | 74 | ER/NR | 0 | 0 | 0 | Solar | Tapping 345 kV line between Potash Junction and Roadrunner | 5/6/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-019 | DISIS-2021-001 | 04 SOUTHEAST | Noble | OK | 4/1/2027 | 12/1/2027 | 74.9 | 91.2 | 91.2 | ER/NR | 0 | 0 | 0 | Battery/Storage | Sooner 345 kV | 4/30/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-018 | DISIS-2021-001 | 04 SOUTHEAST | Noble | OK | 4/1/2027 | 12/1/2027 | 231 | 273.6 | 273.6 | ER/NR | 0 | 0 | 0 | Battery/Storage | Sooner 345 kV | 4/30/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-017 | DISIS-2021-001 | 01 NORTH | McIntosh | ND | BEPC | 4/1/2025 | 12/1/2025 | 74.9 | 91.2 | 91.2 | ER/NR | 0 | 0 | 0 | Battery/Storage | Tap Leland Olds – Groton 345 kV | 4/30/2021 | DISIS STAGE | N/A | ||||||||||
| GEN-2021-016 | DISIS-2021-001 | 01 NORTH | McIntosh | ND | BEPC | 4/1/2025 | 12/1/2025 | 250 | 252 | 252 | ER/NR | 0 | 0 | 0 | Wind | Tap Leland Olds – Groton 345 kV | 4/30/2021 | DISIS STAGE | N/A | ||||||||||
| GEN-2021-015 | DISIS-2021-001 | 03 CENTRAL | Grant, Haskell, Finney | KS | 4/1/2027 | 12/1/2027 | 74.9 | 91.2 | 91.2 | ER/NR | 0 | 0 | 0 | Battery/Storage | Finney 345 kV | 4/30/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-014 | DISIS-2021-001 | 03 CENTRAL | Grant, Haskell, Finney | KS | 4/1/2027 | 12/1/2027 | 231 | 273.6 | 273.6 | ER/NR | 0 | 0 | 0 | Battery/Storage | Finney 345 kV | 4/30/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-013 | DISIS-2021-001 | 04 SOUTHEAST | Franklin | TX | 11/15/2023 | 7/15/2024 | 74.9 | 91.2 | 91.2 | ER/NR | 0 | 0 | 0 | Battery/Storage | Chapel Hill 138kV | 4/30/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-012 | DISIS-2021-001 | 04 SOUTHEAST | Franklin | TX | 11/15/2023 | 7/15/2024 | 225 | 232.32 | 232.32 | ER/NR | 0 | 0 | 0 | Solar | Chapel Hill 138kV | 4/30/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-011 | DISIS-2021-001 | 01 NORTH | Williams | ND | BEPC | 4/1/2027 | 12/1/2027 | 74.9 | 91.2 | 91.2 | ER/NR | 0 | 0 | 0 | Battery/Storage | Wheelock 115 kV | 4/30/2021 | DISIS STAGE | N/A | ||||||||||
| GEN-2021-010 | DISIS-2021-001 | 01 NORTH | Williams County | ND | BEPC | 4/1/2027 | 12/1/2027 | 231 | 273.6 | 273.6 | ER/NR | 0 | 0 | 0 | Battery/Storage | Wheelock 115 kV | 4/30/2021 | DISIS STAGE | N/A | ||||||||||
| GEN-2021-009 | DISIS-2021-001 | 01 NORTH | Beadle | SD | WAPA | 11/1/2025 | 3/1/2026 | 225 | 225 | 225 | ER/NR | 0 | 0 | 0 | Battery/Storage | Carpenter 230kV substation in Clark county, South Dakota | 5/11/2021 | DISIS STAGE | N/A | ||||||||||
| GEN-2021-008 | DISIS-2021-001 | 01 NORTH | McKenzie | ND | BEPC | 5/9/2026 | 12/1/2026 | 270 | 270 | 270 | ER/NR | 0 | 0 | 0 | Solar | 345kV Bus at BEPC Patent Gate Substation, McKenzie County, ND | 5/10/2021 | DISIS STAGE | N/A | ||||||||||
| GEN-2021-007 | DISIS-2021-001 | 02 NEBRASKA | Knox and Cedar | NE | 9/30/2025 | 12/31/2025 | 600 | 600 | 600 | ER/NR | 0 | 0 | 0 | Wind | 345kV bus of Turtle Creek Substation | 5/10/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-006 | DISIS-2021-001 | 03 CENTRAL | Labette | KS | 10/1/2024 | 2/1/2025 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Battery/Storage | Neosho 345kV substation in Labette County, KS | 5/7/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-005 | DISIS-2021-001 | 03 CENTRAL | Saline | KS | 11/1/2023 | 3/1/2024 | 350 | 350 | 350 | ER/NR | 0 | 0 | 0 | Battery/Storage | Summit 230kV substation in Saline County, KS | 5/7/2021 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-004 | DISIS-2021-001 | 04 SOUTHEAST | Carter | OK | tbd | 9/5/2026 | 12/1/2026 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Solar | Sunnyside to Poolville 138kV Feeder | 4/30/2021 | DISIS STAGE | N/A | ||||||||||
| GEN-2021-003 | DISIS-2021-001 | 01 NORTH | Richland | MT | WAPA | 10/15/2023 | 12/1/2023 | 75.5 | 75.5 | 75.5 | ER/NR | 0 | 0 | 0 | Solar | Fairview 115kV Substation | 12/11/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2021-002 | DISIS-2021-001 | 04 SOUTHEAST | Okeene | OK | 9/25/2024 | 12/24/2024 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Battery/Storage | 138kV Okeene Substation | 12/29/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2021-001 | DISIS-2021-001 | 04 SOUTHEAST | Durant | OK | 9/25/2024 | 12/24/2024 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Battery/Storage | 138kV Brown Substation | 12/29/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-SR4 | Surplus | Ford | KS | SUNC | 5/31/2021 | 5/31/2021 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 115kV North Fort Dodge Substation | 8/20/2020 | 4/26/2021 | WITHDRAWN | N/A | ||||||||||
| GEN-2020-SR3 | Surplus | 04 SOUTHEAST | Johnston | OK | OKGE | 9/1/2021 | 9/1/2021 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Battery/Storage | Hugo-Sunnyside 345 kV | 8/4/2020 | IA PENDING | N/A | ||||||||||
| GEN-2020-SR2 | Surplus | 04 SOUTHEAST | Johnston | OK | OKGE | 12/1/2021 | 12/1/2021 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Battery/Storage | Brown 138kV | 8/4/2020 | IA PENDING | N/A | ||||||||||
| GEN-2020-SR1 | Surplus | 04 SOUTHEAST | Beckham | OK | WFEC | 12/1/2022 | 12/1/2022 | 40 | 40 | 40 | ER | 0 | 0 | 0 | Battery/Storage | Erick 138kV Substation | 8/4/2020 | IA PENDING | N/A | ||||||||||
| GEN-2020-094 | DISIS-2020-001 | 02 NEBRASKA | Syracuse | NE | 4/2/2023 | 5/1/2023 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Solar | Neb. City - 103rd & Rokeby 345 kV | 4/30/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-093 | DISIS-2020-001 | 01 NORTH | Potter County | SD | BEPC | 11/14/2025 | 12/1/2024 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Solar | Whitlock Substation 230 kV | 4/30/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-092 | DISIS-2020-001 | 04 SOUTHEAST | Mayes County | OK | 11/2/2025 | 12/1/2024 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Solar | Pryor Junction Substation 115 kV | 4/30/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-091 | DISIS-2020-001 | 01 NORTH | Alexander | ND | BEPC | 11/2/2025 | 12/1/2025 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Solar | Patent Gate Substation 115 kV | 4/30/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-090 | DISIS-2020-001 | 03 CENTRAL | Labette Co | KS | 11/1/2021 | 12/1/2021 | 204.3 | 204.3 | 204.3 | ER/NR | 0 | 0 | 0 | Solar | Neosho 345kV Substation | 4/27/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-089 | DISIS-2020-001 | 03 CENTRAL | Labette Co | KS | 11/1/2021 | 12/1/2021 | 104 | 104 | 104 | ER/NR | 0 | 0 | 0 | Solar | Neosho 345kV Substation | 4/27/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-088 | DISIS-2020-001 | 03 CENTRAL | Jasper | MO | 11/30/2022 | 12/31/2022 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Solar | La Russel 161 kV Substation | 4/30/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-087 | DISIS-2020-001 | 04 SOUTHEAST | Comanche | OK | 5/1/2023 | 6/1/2023 | 500 | 500 | 500 | ER/NR | 0 | 0 | 0 | Solar | Cimmarron to Lawton 345 kV Line | 4/23/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-086 | DISIS-2020-001 | 03 CENTRAL | El Dorado | KS | 11/30/2022 | 12/31/2022 | 500 | 500 | 500 | ER/NR | 0 | 0 | 0 | Solar | Benton to Wolf Creek 345 kV Line | 4/23/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-085 | DISIS-2020-001 | 04 SOUTHEAST | Wilson | OK | AEPW | 4/2/2023 | 5/1/2023 | 500 | 500 | 500 | ER/NR | 0 | 0 | 0 | Solar | Lawton to Sunnyside 345 kV Line | 4/23/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-084 | DISIS-2020-001 | 02 NEBRASKA | Tekamah | NE | 4/1/2022 | 5/1/2022 | 350 | 350 | 350 | ER/NR | 0 | 0 | 0 | Solar | Raun - Fort Calhoun 345 kV | 4/30/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-083 | DISIS-2020-001 | 01 NORTH | Fairview | MT | WAPA | 10/20/2023 | 11/21/2023 | 74.5 | 74.5 | 74.5 | ER/NR | 0 | 0 | 0 | Solar | Fairview 115kV Substation | 4/30/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-082 | DISIS-2020-001 | 03 CENTRAL | Seward | KS | 3/30/2023 | 4/30/2023 | 20 | 20 | 20 | ER/NR | 0 | 0 | 0 | Solar | Liberal 115 kV Substation | 4/30/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-081 | DISIS-2020-001 | 04 SOUTHEAST | Tenaska | TX | AEPW | 5/1/2022 | 6/1/2022 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Battery/Storage | Mt. Enterprise 345 kV substation | 4/30/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-080 | DISIS-2020-001 | 05 SOUTHWEST | Elk City | NM | SPS | 5/1/2022 | 6/1/2022 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Battery/Storage | Tuco Interchange 345 kV Substation | 4/30/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-079 | DISIS-2020-001 | 03 CENTRAL | Jasper | MO | 7/1/2025 | 9/30/2025 | 225 | 225 | 225 | ER/NR | 0 | 0 | 0 | Solar | La Russell 161 kV substation | 4/30/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-078 | DISIS-2020-001 | 02 NEBRASKA | Washington | NE | OPPD | 11/30/2022 | 12/31/2022 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Solar | Substation 1226 to Substation 1237, 161kV Tap | 4/30/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-077 | DISIS-2020-001 | 02 NEBRASKA | Thayer | NE | 11/30/2023 | 12/31/2023 | 151.2 | 151.2 | 151.2 | ER/NR | 0 | 0 | 0 | Wind | North Hebron to Fairbury 115 kV | 4/28/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-076 | DISIS-2020-001 | 03 CENTRAL | Butler | KS | 11/30/2022 | 12/31/2022 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Battery/Storage | Benton to Wolf Creek 345 kV Line | 4/28/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-075 | DISIS-2020-001 | 04 SOUTHEAST | Comanche | OK | 5/1/2023 | 6/1/2023 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Battery/Storage | Cimmarron to Lawton 345 kV Line | 4/28/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-074 | DISIS-2020-001 | 04 SOUTHEAST | Carter | OK | AEPW | 3/31/2023 | 5/1/2023 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Battery/Storage | Lawton to Sunnyside 345 kV Line | 4/28/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-073 | DISIS-2020-001 | 03 CENTRAL | Franklin | KS | 7/1/2025 | 8/1/2025 | 190 | 190 | 190 | ER/NR | 0 | 0 | 0 | Solar | S Ottawa to SE Ottawa 161 kV line | 4/30/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-072 | DISIS-2020-001 | 03 CENTRAL | Windsor | MO | 7/1/2025 | 8/1/2025 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Solar | Windsor to AEC Sedalia 161 kV line | 4/30/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-071 | DISIS-2020-001 | 03 CENTRAL | Osage | KS | 9/30/2024 | 10/31/2024 | 252 | 252 | 252 | ER/NR | 0 | 0 | 0 | Wind | Swissvale to Morris 230 KV line | 4/30/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-070 | DISIS-2020-001 | 03 CENTRAL | Osborne | KS | 9/30/2024 | 10/31/2024 | 255 | 255 | 255 | ER/NR | 0 | 0 | 0 | Wind | Postrock to Axtell 345 KV line | 4/30/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-069 | DISIS-2020-001 | 02 NEBRASKA | Cherry | NE | 11/30/2023 | 12/31/2023 | 52.85 | 52.85 | 52.85 | ER/NR | 0 | 0 | 0 | Wind | Cody to Valentine 115kV line | 4/24/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-068 | DISIS-2020-001 | 05 SOUTHWEST | Hockley | TX | SPS | 11/1/2024 | 12/1/2024 | 400 | 400 | 400 | ER/NR | 0 | 0 | 0 | Solar | Tuco to Yoakum 345kV line | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-067 | DISIS-2020-001 | 05 SOUTHWEST | Hockley | TX | SPS | 11/1/2024 | 12/1/2024 | 352.5 | 352.5 | 352.5 | ER/NR | 0 | 0 | 0 | Wind | Tuco to Yoakum 345kV line | 4/24/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-066 | DISIS-2020-001 | 05 SOUTHWEST | Hockley | TX | SPS | 11/1/2024 | 12/1/2024 | 253.8 | 253.8 | 253.8 | ER/NR | 0 | 0 | 0 | Wind | Tuco to Yoakum 345kV line | 4/24/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-065 | DISIS-2020-001 | 05 SOUTHWEST | Gaines | TX/NM | 12/1/2025 | 5/1/2026 | 1003 | 912.3 | 1003 | ER | 0 | 0 | 0 | Thermal | Combined Cycle | Hobbs-Andrews 345 kV Line | 4/30/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-064 | DISIS-2020-001 | 03 CENTRAL | Joplin | MO | 10/1/2020 | 10/31/2020 | 64 | 36 | 64 | ER/NR | 0 | 0 | 0 | Thermal | CT | 4544 Stateline CC 161kV Substation | 4/22/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-063 | DISIS-2020-001 | 05 SOUTHWEST | Elida | NM | RCEC | 11/1/2023 | 12/1/2023 | 305.8 | 305.8 | 305.8 | ER/NR | 0 | 0 | 0 | Solar | Oasis - San Juan Mesa 230 kV Line | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-062 | DISIS-2020-001 | 05 SOUTHWEST | Clovis | NM | RCEC | 11/1/2023 | 12/1/2023 | 409.8 | 409.8 | 409.8 | ER/NR | 0 | 0 | 0 | Solar | OASIS 230/115 kV Substation | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-061 | DISIS-2020-001 | 03 CENTRAL | Pleasant Hill | MO | 5/1/2021 | 5/1/2021 | 29 | 29 | 21 | ER/NR | 0 | 0 | 0 | Thermal | Gas | Pleasant Hill 345/161/69 kV Substation | 4/28/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-060 | DISIS-2020-001 | 05 SOUTHWEST | Lubbock | TX | 5/1/2026 | 6/1/2026 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Battery/Storage | Lubbock East Substation 230 kV | 4/30/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-059 | DISIS-2020-001 | 05 SOUTHWEST | Lovington | NM | 3/2/2025 | 4/1/2025 | 500 | 500 | 500 | ER/NR | 0 | 0 | 0 | Solar | Tuco-Yoakum-Hobbs 345 kV | 4/29/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-058 | DISIS-2020-001 | 03 CENTRAL | Garner | KS | 11/1/2026 | 12/1/2026 | 433.2 | 433.2 | 433.2 | ER/NR | 0 | 0 | 0 | Solar | Craig-West Gardner 345 kV | 4/30/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-057 | DISIS-2020-001 | 03 CENTRAL | Garner | KS | 11/1/2026 | 12/1/2026 | 433.2 | 433.2 | 433.2 | ER/NR | 0 | 0 | 0 | Solar | East Waverly Substation 115 kV | 4/30/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-056 | DISIS-2020-001 | 03 CENTRAL | Russell County | KS | SUNC | 3/30/2023 | 4/30/2023 | 20 | 20 | 20 | ER/NR | 0 | 0 | 0 | Solar | Russell 115 kV Substation | 4/30/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-055 | DISIS-2020-001 | 04 SOUTHEAST | Bowie County | TX | 8/1/2023 | 12/15/2023 | 71 | 71 | 71 | ER/NR | 0 | 0 | 0 | Battery/Storage | Lydia 345 kV Station | 4/27/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-054 | DISIS-2020-001 | 04 SOUTHEAST | Bowie County | TX | 8/1/2023 | 12/15/2023 | 298 | 298 | 298 | ER/NR | 0 | 0 | 0 | Solar | Lydia 345 kV Station | 4/27/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-053 | DISIS-2020-001 | 03 CENTRAL | Newton Co | MO | 8/1/2023 | 12/15/2023 | 240 | 240 | 240 | ER/NR | 0 | 0 | 0 | Wind | Monette-Flint Creek 345 kV | 4/29/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-052 | DISIS-2020-001 | 03 CENTRAL | Labette Co | KS | 8/1/2023 | 12/15/2023 | 251 | 251 | 251 | ER/NR | 0 | 0 | 0 | Wind | Neosho-Delware 345 kV | 4/29/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-051 | DISIS-2020-001 | 02 NEBRASKA | Sutherland | NE | 11/30/2023 | 12/31/2023 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Solar | Gerald Gentleman Substation 345 kV | 4/29/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-050 | DISIS-2020-001 | 02 NEBRASKA | Omaha | NE | 4/30/2023 | 5/31/2023 | 56.52 | 56.52 | 56.52 | ER/NR | 0 | 0 | 0 | Thermal | Reciprocating Engine | Substation 1211; 161kV | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-049 | DISIS-2020-001 | 02 NEBRASKA | Omaha | NE | 4/30/2023 | 5/31/2023 | 56.52 | 56.52 | 56.52 | ER/NR | 0 | 0 | 0 | Thermal | Reciprocating Engine | Substation 1211; 161kV | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-048 | DISIS-2020-001 | 02 NEBRASKA | Omaha | NE | 4/30/2023 | 5/31/2023 | 56.52 | 56.52 | 56.52 | ER/NR | 0 | 0 | 0 | Thermal | Reciprocating Engine | Substation 1211; 161kV | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-047 | DISIS-2020-001 | 02 NEBRASKA | Omaha | NE | 4/30/2023 | 5/31/2023 | 56.52 | 56.52 | 56.52 | ER/NR | 0 | 0 | 0 | Thermal | Reciprocating Engine | Substation 911; 69 kV | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-046 | DISIS-2020-001 | 02 NEBRASKA | Douglas County | NE | 4/30/2023 | 5/31/2023 | 56.52 | 56.52 | 56.52 | ER/NR | 0 | 0 | 0 | Thermal | Reciprocating Engine | Between Substation 1209 and 1252; 161kV | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-045 | DISIS-2020-001 | 02 NEBRASKA | Douglas County | NE | 4/30/2023 | 5/31/2023 | 56.52 | 56.52 | 56.52 | ER/NR | 0 | 0 | 0 | Thermal | Reciprocating Engine | Between Substation 1209 and 1252; 161kV | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-044 | DISIS-2020-001 | 02 NEBRASKA | Douglas County | NE | 4/30/2023 | 5/31/2023 | 56.52 | 56.52 | 56.52 | ER/NR | 0 | 0 | 0 | Thermal | Reciprocating Engine | Between Substation 1209 and 1252; 161kV | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-043 | DISIS-2020-001 | 02 NEBRASKA | Douglas County | NE | 4/30/2023 | 5/31/2023 | 56.52 | 56.52 | 56.52 | ER/NR | 0 | 0 | 0 | Thermal | Reciprocating Engine | Between Substation 1209 and 1252; 161kV | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-042 | DISIS-2020-001 | 02 NEBRASKA | Plattsmouth | NE | 4/30/2023 | 5/31/2023 | 56.52 | 56.52 | 56.52 | ER/NR | 0 | 0 | 0 | Thermal | Reciprocating Engine | Substation 3740; 345kV | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-041 | DISIS-2020-001 | 02 NEBRASKA | Plattsmouth | NE | 4/30/2023 | 5/31/2023 | 56.52 | 56.52 | 56.52 | ER/NR | 0 | 0 | 0 | Thermal | Reciprocating Engine | Substation 3740; 345kV | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-040 | DISIS-2020-001 | 02 NEBRASKA | Plattsmouth | NE | 4/30/2023 | 5/31/2023 | 303 | 258 | 303 | ER/NR | 0 | 0 | 0 | Thermal | CT | Substation 3740; 345kV | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-039 | DISIS-2020-001 | 02 NEBRASKA | Plattsmouth | NE | 4/30/2023 | 5/31/2023 | 56.52 | 56.52 | 56.52 | ER/NR | 0 | 0 | 0 | Thermal | Reciprocating Engine | Substation 3740; 345kV | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-038 | DISIS-2020-001 | 02 NEBRASKA | Plattsmouth | NE | 4/30/2023 | 5/31/2023 | 303 | 258 | 303 | ER/NR | 0 | 0 | 0 | Thermal | CT | Substation 3740; 345kV | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-037 | DISIS-2020-001 | 02 NEBRASKA | Plattsmouth | NE | 4/30/2023 | 5/31/2023 | 56.52 | 56.52 | 56.52 | ER/NR | 0 | 0 | 0 | Thermal | Reciprocating Engine | Substation 3740; 345kV | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-036 | DISIS-2020-001 | 02 NEBRASKA | Plattsmouth | NE | 4/30/2023 | 5/31/2023 | 303 | 258 | 303 | ER/NR | 0 | 0 | 0 | Thermal | CT | Substation 3740; 345kV | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-035 | DISIS-2020-001 | 02 NEBRASKA | Plattsmouth | NE | 4/30/2023 | 5/31/2023 | 424.5 | 418 | 424.5 | ER/NR | 0 | 0 | 0 | Thermal | CT | Substation 3740; 345kV | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-034 | DISIS-2020-001 | 02 NEBRASKA | Sarpy County | NE | 4/30/2023 | 5/31/2023 | 56.52 | 56.52 | 56.52 | ER/NR | 0 | 0 | 0 | Thermal | Reciprocating Engine | Substation 1363; 161kV Substation | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-033 | DISIS-2020-001 | 02 NEBRASKA | Sarpy County | NE | 4/30/2023 | 5/31/2023 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Solar | Substation 1363; 161kV Substation | 4/29/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-032 | DISIS-2020-001 | 02 NEBRASKA | Sarpy County | NE | 4/30/2023 | 5/31/2023 | 56.52 | 56.52 | 56.52 | ER/NR | 0 | 0 | 0 | Thermal | Reciprocating Engine | Substation 1363; 161kV Substation | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-031 | DISIS-2020-001 | 02 NEBRASKA | Sarpy County | NE | 4/30/2023 | 5/31/2023 | 303 | 258 | 303 | ER/NR | 0 | 0 | 0 | Thermal | CT | Substation 1363; 161kV Substation | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-030 | DISIS-2020-001 | 02 NEBRASKA | Sarpy County | NE | 4/30/2023 | 5/31/2023 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Solar | Substation 1363; 161kV Substation | 4/29/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-029 | DISIS-2020-001 | 02 NEBRASKA | Sarpy County | NE | 4/30/2023 | 5/31/2023 | 56.52 | 56.52 | 56.52 | ER/NR | 0 | 0 | 0 | Thermal | Reciprocating Engine | Substation 1363; 161kV Substation | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-028 | DISIS-2020-001 | 02 NEBRASKA | Sarpy County | NE | 4/30/2023 | 5/31/2023 | 303 | 258 | 303 | ER/NR | 0 | 0 | 0 | Thermal | CT | Substation 1363; 161kV Substation | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-027 | DISIS-2020-001 | 02 NEBRASKA | Sarpy County | NE | 4/30/2023 | 5/31/2023 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Solar | Substation 1363; 161kV Substation | 4/29/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-026 | DISIS-2020-001 | 02 NEBRASKA | Sarpy County | NE | 4/30/2023 | 5/31/2023 | 56.52 | 56.52 | 56.52 | ER/NR | 0 | 0 | 0 | Thermal | Reciprocating Engine | Substation 1363; 161kV Substation | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-025 | DISIS-2020-001 | 02 NEBRASKA | Sarpy County | NE | 4/30/2023 | 5/31/2023 | 303 | 258 | 303 | ER/NR | 0 | 0 | 0 | Thermal | CT | Substation 1363; 161kV Substation | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-024 | DISIS-2020-001 | 02 NEBRASKA | Sarpy County | NE | 4/30/2023 | 5/31/2023 | 424.5 | 418 | 424.5 | ER/NR | 0 | 0 | 0 | Thermal | CT | Substation 1363; 161kV Substation | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-023 | DISIS-2020-001 | 04 SOUTHEAST | Carrier | OK | 11/1/2021 | 12/1/2021 | 202 | 202 | 202 | ER/NR | 0 | 0 | 0 | Battery/Storage | Woodring 345 KV Station | 4/7/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-022 | DISIS-2020-001 | 03 CENTRAL | Finney County | KS | 11/1/2023 | 12/1/2023 | 125 | 125 | 125 | ER/NR | 0 | 0 | 0 | Wind | HOLCOMB SUB 115KV BUS | 4/29/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-021 | DISIS-2020-001 | 01 NORTH | Sioux County | ND | BEPC | 11/30/2023 | 12/31/2023 | 235 | 235 | 235 | ER/NR | 0 | 0 | 0 | Wind | LeLand Olds-Fort Thompson 345kV | 4/24/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-020 | DISIS-2020-001 | 04 SOUTHEAST | Braman | OK | 9/30/2022 | 10/31/2022 | 201.6 | 201.6 | 201.6 | ER/NR | 0 | 0 | 0 | Wind | Ranch Road 345 kV Substation | 4/28/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-019 | DISIS-2020-001 | 01 NORTH | Tripp County | SD | WAPA | 7/30/2026 | 8/30/2026 | 182.4 | 182.4 | 182.4 | ER/NR | 0 | 0 | 0 | Wind | Witten Substation 115 kV | 4/29/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-018 | DISIS-2020-001 | 01 NORTH | Sully County | SD | BEPC | 7/30/2026 | 8/30/2026 | 205.2 | 205.2 | 205.2 | ER/NR | 0 | 0 | 0 | Wind | Leland Olds-Ft. Thompson 345 kV | 4/28/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-017 | DISIS-2020-001 | 05 SOUTHWEST | Lamb County | TX | SWPS | 10/1/2025 | 12/31/2025 | 74.88 | 74.88 | 74.88 | ER/NR | 0 | 0 | 0 | Solar | 69kV Lamb County Interchange | 4/24/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-016 | DISIS-2020-001 | 04 SOUTHEAST | Garvin County | OK | 10/31/2022 | 12/1/2022 | 202 | 202 | 202 | ER/NR | 0 | 0 | 0 | Solar | 138kV Cromwell Substation | 4/20/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-015 | DISIS-2020-001 | 03 CENTRAL | Lawrence & Dade County | MO | 11/1/2021 | 12/1/2021 | 104 | 104 | 104 | ER/NR | 0 | 0 | 0 | Solar | Dadeville 161 Station | 4/19/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-014 | DISIS-2020-001 | 01 NORTH | Alexander | ND | BEPC | 6/17/2021 | 10/18/2021 | 60.5 | 45 | 45 | ER/NR | 0 | 0 | 0 | Thermal | Gas | Lonesome Creek 115kV | 4/20/2020 | DISIS STAGE | N/A | |||||||||
| GEN-2020-013 | DISIS-2020-001 | 02 NEBRASKA | Orleans | NE | NPPD | 10/15/2026 | 12/31/2026 | 215 | 215 | 215 | ER/NR | 0 | 0 | 0 | Hybrid | Solar | Holdrege Substation 115kV | 4/10/2020 | DISIS STAGE | N/A | |||||||||
| GEN-2020-012 | DISIS-2020-001 | 04 SOUTHEAST | Walters | OK | WFEC | 10/15/2026 | 12/31/2026 | 113 | 113 | 113 | ER/NR | 0 | 0 | 0 | Hybrid | Solar | Walters 2 Substation 69kV | 4/10/2020 | DISIS STAGE | N/A | |||||||||
| GEN-2020-011 | DISIS-2020-001 | 02 NEBRASKA | Funk | NE | NPPD | 10/15/2026 | 12/31/2026 | 320 | 320 | 320 | ER/NR | 0 | 0 | 0 | Hybrid | Solar | Sweetwater Substation 345kV | 4/8/2020 | DISIS STAGE | N/A | |||||||||
| GEN-2020-010 | DISIS-2020-001 | 04 SOUTHEAST | Mutual | OK | WFEC | 10/15/2026 | 12/31/2026 | 215 | 215 | 215 | ER/NR | 0 | 0 | 0 | Hybrid | Solar | Mooreland-Taloga Substations 138kV | 4/8/2020 | DISIS STAGE | N/A | |||||||||
| GEN-2020-009 | DISIS-2020-001 | 04 SOUTHEAST | Faxon | OK | AEP | 10/15/2026 | 12/31/2026 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Hybrid | Solar | Lawton to Oklaunion 345kV | 4/8/2020 | DISIS STAGE | N/A | |||||||||
| GEN-2020-008 | DISIS-2020-001 | 03 CENTRAL | Stevens County | KS | 9/1/2023 | 9/24/2023 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Solar | Sunflower Electric Carpenter 345kV Substation | 4/22/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-007 | DISIS-2020-001 | 03 CENTRAL | Linn County | KS | 7/1/2023 | 8/1/2023 | 650 | 650 | 650 | ER/NR | 0 | 0 | 0 | Solar | Evergy La Cygne 345kV Substation | 4/22/2020 | DISIS STAGE | N/A | |||||||||||
| GEN-2020-006 | DISIS-2020-001 | 01 NORTH | Bowman County | ND | BEPC | 11/1/2023 | 11/30/2023 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Solar | Bowman 230kV substation | 4/23/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-005 | DISIS-2020-001 | 05 SOUTHWEST | Carson County | TX | SWPS | 1/15/2023 | 2/15/2023 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Wind | Yarnall Tap - Conway 115 kV Line | 3/31/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-004 | DISIS-2020-001 | 02 NEBRASKA | Otoe | NE | OPPD | 10/1/2023 | 12/1/2023 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Solar | Cass County to Nebraska City #2 345kV | 4/3/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-003 | DISIS-2020-001 | 03 CENTRAL | Winfield | KS | 3/1/2023 | 6/1/2023 | 58 | 58 | 58 | ER/NR | 0 | 0 | 0 | Thermal | Diesel/Gas | East Substation 69 kV | 4/1/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-002 | DISIS-2020-001 | 02 NEBRASKA | Yutan | NE | OPPD | 11/15/2022 | 12/1/2022 | 81 | 81 | 81 | ER/NR | 0 | 0 | 0 | Solar | 6846 Substation 69 kV | 4/6/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2020-001 | DISIS-2020-001 | 02 NEBRASKA | Cheyenne County | NE | 11/30/2022 | 12/31/2022 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Solar | Sidney Substation 345kV | 12/6/2019 | DISIS STAGE | N/A | |||||||||||
| GEN-2019-080 | DISIS-2019-001 | Nachitoches Parish | LA | 3/31/2021 | 25 | 25 | 25 | ER/NR | 0 | 0 | 0 | Solar | Cane River 115kV | 4/24/2019 | 8/11/2020 | WITHDRAWN | N/A | ||||||||||||
| GEN-2019-079 | DISIS-2019-001 | 03 CENTRAL | Gray | KS | 6/30/2019 | 13 | 13 | 13 | ER | 0 | 0 | 0 | Wind | Gray County 115kV | 5/21/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-078 | FCS-2019-003 | Joplin | MO | 10/31/2020 | 70 | 36 | 70 | ER | 0 | 0 | 0 | Thermal | Gas | 5/29/2019 | 7/1/2019 | WITHDRAWN | N/A | ||||||||||||
| GEN-2019-077 | DISIS-2019-001 | 02 NEBRASKA | Lancaster | NE | 12/31/2022 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Battery/Storage | 84th/Fletcher 115kV substation | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-076 | DISIS-2019-001 | 02 NEBRASKA | Jackson | MO | 12/31/2022 | 29 | 29 | 29 | ER/NR | 0 | 0 | 0 | Battery/Storage | Duncan 69kV substation | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-075 | DISIS-2019-001 | 02 NEBRASKA | Johnson | NE | 12/31/2023 | 24 | 24 | 24 | ER/NR | 0 | 0 | 0 | Solar | South Sterling 69kV | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-074 | DISIS-2019-001 | 02 NEBRASKA | Washington | NE | 12/31/2023 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Solar | S1226 161kV | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-073 | DISIS-2019-001 | 02 NEBRASKA | Washington | NE | 12/31/2023 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Solar | S1226 161kV | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-072 | DISIS-2019-001 | 02 NEBRASKA | Washington | NE | 12/31/2023 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Battery/Storage | S1226 161 kV substation | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-071 | DISIS-2019-001 | 02 NEBRASKA | Burt | NE | 12/31/2023 | 51 | 51 | 51 | ER/NR | 0 | 0 | 0 | Battery/Storage | Raun-Fort Calhoun 345kV line | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-070 | DISIS-2019-001 | 02 NEBRASKA | Burt | NE | OPPD | 12/31/2023 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Solar | Raun-Fort Calhoun 345kV line | 5/24/2019 | DISIS STAGE | N/A | |||||||||||
| GEN-2019-069 | DISIS-2019-001 | 02 NEBRASKA | Washington | NE | 12/31/2023 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Solar | Raun-Fort Calhoun 345kV line | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-068 | DISIS-2019-001 | 03 CENTRAL | Barton | KS | 6/1/2023 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Battery/Storage | Great Bend - Circle 230kV line | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-067 | DISIS-2019-001 | 04 SOUTHEAST | Canadian | OK | 6/1/2023 | 30 | 30 | 30 | ER/NR | 0 | 0 | 0 | Battery/Storage | Cimarron - Minco 345kV line | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-066 | DISIS-2019-001 | 04 SOUTHEAST | Beckham | OK | 6/1/2023 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Battery/Storage | Sweetwater 230kV substation | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-065 | DISIS-2019-001 | 04 SOUTHEAST | Smith, Rusk | TX | 6/1/2024 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Battery/Storage | Overton 138kV | 5/23/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-064 | DISIS-2019-001 | 05 SOUTHWEST | Swisher | TX | 6/1/2024 | 400 | 400 | 400 | ER | 0 | 0 | 0 | Battery/Storage | Kress 115kV | 5/23/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-063 | DISIS-2019-001 | 03 CENTRAL | Ford, Clark | KS | 6/1/2023 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Battery/Storage | Clark County 345kV substation | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-062 | DISIS-2019-001 | 03 CENTRAL | Butler | KS | 12/31/2022 | 90 | 90 | 90 | ER/NR | 0 | 0 | 0 | Battery/Storage | Pony Meadows 161kV substation | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-061 | DISIS-2019-001 | Major | OK | 12/31/2022 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Solar | Cleo Corner 138kV substation | 5/22/2019 | 5/15/2020 | WITHDRAWN | N/A | ||||||||||||
| GEN-2019-060 | DISIS-2019-001 | 03 CENTRAL | Grant | KS | 12/31/2022 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Solar | Spearville 115kV substation | 5/22/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-059 | DISIS-2019-001 | Seward | KS | 12/31/2022 | 75 | 75 | 75 | ER/NR | 0 | 0 | 0 | Solar | North Liberal 115kV substation | 5/22/2019 | 4/1/2021 | WITHDRAWN | N/A | ||||||||||||
| GEN-2019-058 | DISIS-2019-001 | 03 CENTRAL | Ford, Clark | KS | 6/1/2023 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Solar | Clark County 345kV substation | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-057 | DISIS-2019-001 | 01 NORTH | Day, Clark | SD | WAPA | 12/1/2020 | 63.1 | 63.1 | 63.1 | ER/NR | 0 | 0 | 0 | Solar | Huron 230kV | 4/30/2019 | DISIS STAGE | N/A | |||||||||||
| GEN-2019-056 | DISIS-2019-001 | 05 SOUTHWEST | Randall | TX | 12/31/2022 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Battery/Storage | Randall 115kV substation | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-055 | DISIS-2019-001 | 03 CENTRAL | Edwards, Pawnee | KS | 6/1/2023 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Solar | Great Bend-Spearville 230kV line | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-054 | DISIS-2019-001 | 03 CENTRAL | Barton | KS | 6/1/2023 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Solar | Great Bend- Circle 230kV line | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-053 | DISIS-2019-001 | 03 CENTRAL | Edwards/Pawnee | KS | 6/1/2023 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Battery/Storage | Great Bend-Spearville 230kV line | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-052 | DISIS-2019-001 | 04 SOUTHEAST | Canadian | OK | 6/1/2023 | 135 | 135 | 135 | ER/NR | 0 | 0 | 0 | Solar | Cimarron-Minco 345kV line | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-051 | DISIS-2019-001 | 03 CENTRAL | Barton | KS | 6/1/2023 | 40 | 40 | 40 | ER/NR | 0 | 0 | 0 | Battery/Storage | Frey St 115kV bus | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-050 | DISIS-2019-001 | 03 CENTRAL | Gove | KS | 6/1/2023 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Solar | Grinnell 115kV | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-049 | DISIS-2019-001 | 04 SOUTHEAST | Caddo | LA | 12/31/2022 | 60 | 60 | 60 | ER/NR | 0 | 0 | 0 | Battery/Storage | Fournoy 69kV substation | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-048 | DISIS-2019-001 | 03 CENTRAL | Jackson | MO | 12/31/2022 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Battery/Storage | Duncan 69kV substation | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-047 | DISIS-2019-001 | 03 CENTRAL | Butler | KS | 12/31/2022 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Battery/Storage | Butler 138kV substation | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-046 | DISIS-2019-001 | 04 SOUTHEAST | Woods | OK | 12/31/2022 | 90 | 90 | 90 | ER/NR | 0 | 0 | 0 | Battery/Storage | DeGrasse 138kV substation | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-045 | DISIS-2019-001 | 04 SOUTHEAST | Woods | OK | 12/31/2022 | 175 | 175 | 175 | ER/NR | 0 | 0 | 0 | Solar | DeGfrasse 138kV | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-044 | DISIS-2019-001 | 03 CENTRAL | Ellsworth | KS | 12/31/2023 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Wind | Fort Dodge 115kV substation | 5/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-043 | DISIS-2019-001 | 01 NORTH | Fallon | MT | WAPA | 12/1/2023 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Solar | Baker-Mile City 230kV line | 5/23/2019 | DISIS STAGE | N/A | |||||||||||
| GEN-2019-042 | DISIS-2019-001 | 02 NEBRASKA | Cheyenne | NE | 12/1/2020 | 104 | 104 | 104 | ER/NR | 0 | 0 | 0 | Solar | Sidney 345kV | 5/23/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-041 | DISIS-2019-001 | 02 NEBRASKA | Lancaster | NE | 12/1/2020 | 78 | 78 | 78 | ER/NR | 0 | 0 | 0 | Solar | 115kV Monolith Substation | 5/23/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-040 | FCS-2019-002 | Yankton | SD | 6/1/2021 | 60 | 60 | 60 | ER/NR | 0 | 0 | 0 | Battery/Storage | 5/21/2019 | 8/5/2019 | WITHDRAWN | N/A | |||||||||||||
| GEN-2019-039 | DISIS-2019-001 | 02 NEBRASKA | Butler | NE | 5/16/2022 | 174.5 | 174.2 | 174.5 | ER/NR | 0 | 0 | 0 | Solar | Columbus Southeast-Rising City 115kV | 5/21/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-038 | DISIS-2019-001 | 05 SOUTHWEST | Potter | TX | 6/30/2021 | 50 | 50 | 50 | ER | 0 | 0 | 0 | Battery/Storage | Potter County 230kV | 5/23/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-037 | DISIS-2019-001 | 01 NORTH | Mercer | ND | BEPC | 12/1/2023 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Solar | BEPC 230kV substation | 5/17/2019 | DISIS STAGE | N/A | |||||||||||
| GEN-2019-036 | DISIS-2019-001 | 05 SOUTHWEST | Potter | TX | 6/30/2021 | 70 | 70 | 70 | ER | 0 | 0 | 0 | Solar | Potter County 230kV | 5/15/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-035 | DISIS-2019-001 | 03 CENTRAL | Barry | MO | 12/31/2022 | 80 | 80 | 80 | ER/NR | 0 | 0 | 0 | Solar | Reeds Spring-Aurora 161kV | 5/2/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-034 | DISIS-2019-001 | 04 SOUTHEAST | Bryan | OK | 6/1/2023 | 120 | 120 | 120 | ER/NR | 0 | 0 | 0 | Thermal | Gas | Butter Field-Duran 138kV | 5/2/2019 | DISIS STAGE | N/A | |||||||||||
| GEN-2019-033 | DISIS-2019-001 | 02 NEBRASKA | Knox | NE | 12/1/2021 | 182 | 182 | 182 | ER/NR | 0 | 0 | 0 | Solar | Huron 345kV station | 5/1/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-032 | DISIS-2019-001 | 01 NORTH | Day | SD | BEPC | 12/1/2020 | 63.1 | 63.1 | 63.1 | ER/NR | 0 | 0 | 0 | Battery/Storage | Huron 345kV station | 4/30/2019 | DISIS STAGE | N/A | |||||||||||
| GEN-2019-031 | DISIS-2019-001 | Lea | NM | 12/1/2021 | 302.6 | 302.6 | 302.6 | ER/NR | 0 | 0 | 0 | Solar | Tap Yoakum to Hobbs 230kV transmission line | 4/29/2019 | 1/17/2020 | WITHDRAWN | N/A | ||||||||||||
| GEN-2019-030 | DISIS-2019-001 | 03 CENTRAL | Ford | KS | 12/1/2021 | 252 | 252 | 252 | ER/NR | 0 | 0 | 0 | Wind | 345kV Ironwood Switching Station | 4/25/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-029 | DISIS-2019-001 | 02 NEBRASKA | Keith and Perkins | NE | NPPD | 12/1/2021 | 404 | 404 | 404 | ER/NR | 0 | 0 | 0 | Wind | 345kV Gerald Gentleman Station | 4/25/2019 | DISIS STAGE | N/A | |||||||||||
| GEN-2019-028 | DISIS-2019-001 | 02 NEBRASKA | Lincoln County, NE | NE | NPPD | 12/1/2022 | 400 | 400 | 400 | ER/NR | 0 | 0 | 0 | Solar | Gerald Gentlemen 345kV Substation | 4/23/2019 | DISIS STAGE | N/A | |||||||||||
| GEN-2019-027 | DISIS-2019-001 | 04 SOUTHEAST | Comanche County | OK | AEPW | 10/1/2023 | 40 | 40 | 40 | ER/NR | 0 | 0 | 0 | Thermal | Combustion | Ft. Sill/Mow Way 138kV Station | 5/1/2019 | DISIS STAGE | N/A | ||||||||||
| GEN-2019-026 | DISIS-2019-001 | 05 SOUTHWEST | Lea | NM | 12/31/2023 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Battery/Storage | Hobbs 230kV | 5/8/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-025 | DISIS-2019-001 | 05 SOUTHWEST | Lea | NM | 12/23/2023 | 240 | 240 | 240 | ER/NR | 0 | 0 | 0 | Solar | Hobbs 230kV | 5/8/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-024 | DISIS-2019-001 | 01 NORTH | Wibaux | MT | WAPA | 12/31/2023 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Battery/Storage | Beaver Hill Sub | 5/8/2019 | DISIS STAGE | N/A | |||||||||||
| GEN-2019-023 | DISIS-2019-001 | 01 NORTH | Wibaux | MT | WAPA | 12/31/2023 | 110 | 110 | 110 | ER/NR | 0 | 0 | 0 | Wind | Beaver Hill sub | 5/8/2019 | DISIS STAGE | N/A | |||||||||||
| GEN-2019-022 | DISIS-2019-001 | 05 SOUTHWEST | Lea | NM | 12/31/2021 | 41 | 41 | 41 | ER | 0 | 0 | 0 | Solar | Bender West 115kV | 4/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-021 | DISIS-2019-001 | 05 SOUTHWEST | Roosevelt | NM | 12/1/2022 | 50 | 50 | 50 | ER | 0 | 0 | 0 | Battery/Storage | Roosevelt to Tolk West 230kV | 4/29/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-020 | DISIS-2019-001 | Williams | ND | 12/1/2023 | 35 | 35 | 35 | ER/NR | 0 | 0 | 0 | Solar | Pioneer 115kV substation | 5/3/2019 | 3/9/2020 | WITHDRAWN | N/A | ||||||||||||
| GEN-2019-019 | DISIS-2019-001 | 01 NORTH | Sioux | IA | NIPCO | 2/1/2020 | 7/22/2022 | 15.15 | 15.15 | 15.15 | ER/NR | 0 | 0 | 0 | Thermal | Gas Turbine | Siouxland 69kV | 4/24/2019 | DISIS STAGE | N/A | |||||||||
| GEN-2019-018 | DISIS-2019-001 | 03 CENTRAL | Rice | KS | MIDW | 3/1/2020 | 6/1/2021 | 15.56 | 11.97 | 15.56 | ER/NR | 0 | 0 | 0 | Thermal | Gas Turbine | Saxman 115kV substation | 4/24/2019 | DISIS STAGE | N/A | |||||||||
| GEN-2019-017 | DISIS-2019-001 | 01 NORTH | Butte | SD | WAPA | 12/31/2021 | 142.8 | 142.8 | 142.8 | ER/NR | 0 | 0 | 0 | Wind | Tap 115kV Maurine to Newell transmission line | 4/24/2019 | DISIS STAGE | N/A | |||||||||||
| GEN-2019-016 | DISIS-2019-001 | 03 CENTRAL | Polk and Dade | MO | 11/30/2022 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Solar | Dadeville substation 161kV | 4/30/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-015 | DISIS-2019-001 | Atoka | OK | 12/31/2024 | 72.6 | 72.6 | 72.6 | ER | 0 | 0 | 0 | Solar | 138kV Atoka substation | 4/24/2019 | 5/22/2020 | WITHDRAWN | N/A | ||||||||||||
| GEN-2019-014 | DISIS-2019-001 | 03 CENTRAL | Finney | KS | 12/1/2022 | 125 | 125 | 125 | ER/NR | 0 | 0 | 0 | Solar | Holcomb 115kV substation | 4/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-013 | DISIS-2019-001 | 04 SOUTHEAST | Roger Mills | OK | 12/31/2021 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Battery/Storage | Dempsey 230kV | 4/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-012 | DISIS-2019-001 | 04 SOUTHEAST | Woodward | OK | 5/1/2023 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Battery/Storage | Woodward 138kV substation | 5/22/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-011 | DISIS-2019-001 | 05 SOUTHWEST | Yoakum | TX | 5/1/2023 | 230 | 230 | 230 | ER/NR | 0 | 0 | 0 | Battery/Storage | Yoakum 345kV subtstation | 4/22/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-010 | DISIS-2019-001 | 02 NEBRASKA | Cass | NE | 10/31/2022 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Solar | Elmswood 69kV substation | 4/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-009 | DISIS-2019-001 | 02 NEBRASKA | Nemaha | NE | 10/31/2022 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Solar | Brock 161kV substation | 4/24/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-008 | FCS-2019-002 | Chaves | NM | SWPS | 12/31/2022 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Solar | Eddy - Chaves 230kV transmission line | 4/23/2019 | 11/8/2019 | WITHDRAWN | N/A | |||||||||||
| GEN-2019-007 | FCS-2019-002 | Lincoln | NE | NPPD | 12/31/2022 | 500 | 500 | 500 | ER/NR | 0 | 0 | 0 | Solar | Gerald Gentleman-Red Willow 345kV transmssion line | 4/23/2019 | 10/8/2019 | WITHDRAWN | N/A | |||||||||||
| GEN-2019-006 | FCS-2019-002 | Spink | SD | 12/31/2022 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Solar | 4/23/2019 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2019-005 | FCS-2019-002 | Polk & Greene Counties | MO | SPRM | 12/31/2022 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Solar | Morgan-Brookline 345kV transmission line | 4/23/2019 | 11/8/2019 | WITHDRAWN | N/A | |||||||||||
| GEN-2019-004 | DISIS-2019-001 | 05 SOUTHWEST | Hobbs | NM | 6/4/2019 | 56 | 56 | 56 | ER | 0 | 0 | 0 | Thermal | CT | Hobbs 230kV | 4/22/2019 | DISIS STAGE | N/A | |||||||||||
| GEN-2019-003 | DISIS-2019-001 | 05 SOUTHWEST | Roosevelt | NM | 12/1/2022 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Solar | Roosevelt to Tolk West 230kV | 4/19/2019 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-002 | DISIS-2019-001 | 04 SOUTHEAST | Mayes | OK | 12/1/2020 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Battery/Storage | Maid 161kV substation | 11/26/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2019-001 | DISIS-2019-001 | 03 CENTRAL | Pratt | KS | WERE | 12/31/2018 | 12/31/2018 | 25 | 25 | 25 | ER | 0 | 0 | 0 | Wind | Thistle-Wichita Dbl Ckt (Buffalo Flats) 345kV | 11/27/2018 | DISIS STAGE | N/A | ||||||||||
| GEN-2018-132 | DISIS-2018-002 | 02 NEBRASKA | Pierce | NE | 12/31/2020 | 201.6 | 201.6 | 201.6 | ER/NR | 0 | 0 | 0 | Solar | Neligh-Hoskins 345kV line | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-131 | DISIS-2018-002 | 02 NEBRASKA | Pierce | NE | 12/31/2020 | 221.4 | 221.4 | 221.4 | ER/NR | 0 | 0 | 0 | Solar | Tap on Neligh-Hoskins 345kV | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-130 | DISIS-2018-002 | 02 NEBRASKA | Knox | NE | 12/31/2020 | 122 | 122 | 122 | ER/NR | 0 | 0 | 0 | Wind | Kelly to Fort Randall 230kV | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-129 | DISIS-2018-002 | 01 NORTH | Hyde/Hughes | SD | WAPA | 9/1/2021 | 200.22 | 200.22 | 200.22 | ER/NR | 0 | 0 | 0 | Wind | Fort Thompson-Oahe 230kV | 11/19/2018 | DISIS STAGE | N/A | |||||||||||
| GEN-2018-128 | DISIS-2018-002 | 03 CENTRAL | Sumner | KS | 9/1/2021 | 200.22 | 200.22 | 200.22 | ER/NR | 0 | 0 | 0 | Wind | Renfrow-Viola 345 kV | 11/19/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-127 | DISIS-2018-002 | Logan | OK | OGE | 12/1/2021 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Solar | Crescent 138 kV | 11/21/2018 | 3/25/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2018-126 | DISIS-2018-002 | 03 CENTRAL | Johnson | KS | 12/1/2021 | 250 | 250 | 250 | ER | 0 | 0 | 0 | Solar | West Gardner - Cedar Creek 161kV transmission line | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-125 | DISIS-2018-002 | 02 NEBRASKA | Lincoln | NE | 12/15/2022 | 231 | 231 | 231 | ER/NR | 0 | 0 | 0 | Wind | New switching station on Gentleman to Sweetwater 345kV line | 11/19/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-124 | DISIS-2018-002 | 05 SOUTHWEST | Parmer | TX | 12/31/2023 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Solar | Tolk 230kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-123 | DISIS-2018-002 | 03 CENTRAL | Ellsworth | KS | 12/31/2023 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Sibley to Overton 345kV | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-122 | DISIS-2018-002 | 03 CENTRAL | Ralls | MO | 12/31/2023 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Salisbury 161kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-121 | DISIS-2018-002 | 03 CENTRAL | Miami | MO | 12/31/2020 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Battery/Storage | Archie 161kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-120 | DISIS-2018-002 | 03 CENTRAL | Sumner | KS | 12/31/2023 | 400 | 400 | 400 | ER/NR | 0 | 0 | 0 | Wind | Stranger Creek 345kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-119 | DISIS-2018-002 | Johnson | NE | 12/31/2023 | 400 | 400 | 400 | ER/NR | 0 | 0 | 0 | Wind | Stranger Creek 345kV substation | 11/19/2018 | 7/1/2020 | WITHDRAWN | N/A | ||||||||||||
| GEN-2018-118 | DISIS-2018-002 | 05 SOUTHWEST | Lea | NM | SWPS | 6/1/2021 | 304.992 | 304.992 | 304.992 | ER/NR | 0 | 0 | 0 | Solar | Crossroads to Eddy County 345kV | 11/21/2018 | DISIS STAGE | N/A | |||||||||||
| GEN-2018-117 | DISIS-2018-002 | 04 SOUTHEAST | Roger Mills | OK | 12/31/2022 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Solar | Sweetwater 230kV | 11/20/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-116 | DISIS-2018-002 | 03 CENTRAL | Barton | KS | 12/31/2022 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Solar | Frey Street 115kV bus | 11/20/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-115 | DISIS-2018-002 | 04 SOUTHEAST | Lawton | OK | 12/1/2021 | 250 | 250 | 250 | ER | 0 | 0 | 0 | Solar | Lawton East Side 345kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-114 | DISIS-2018-002 | 03 CENTRAL | Linn | KS | 12/31/2023 | 40 | 40 | 40 | ER/NR | 0 | 0 | 0 | Battery/Storage | Archie 161kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-113 | DISIS-2018-002 | New Madrid | MO | 12/31/2023 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Solar | Water V5 161kV substation | 11/21/2018 | 4/16/2020 | WITHDRAWN | N/A | ||||||||||||
| GEN-2018-112 | DISIS-2018-002 | 05 SOUTHWEST | Parmer | TX | 12/31/2023 | 185 | 185 | 185 | ER/NR | 0 | 0 | 0 | Solar | Tolk 230kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-111 | DISIS-2018-002 | 05 SOUTHWEST | Parmer | TX | 12/31/2023 | 75 | 75 | 75 | ER/NR | 0 | 0 | 0 | Battery/Storage | Tolk 230kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-110 | DISIS-2018-002 | Nemaha | NE | 12/31/2023 | 500 | 500 | 500 | ER/NR | 0 | 0 | 0 | Wind | Stranger Creek 345kV substation | 11/21/2018 | 7/1/2020 | WITHDRAWN | N/A | ||||||||||||
| GEN-2018-109 | DISIS-2018-002 | 03 CENTRAL | Caddo | OK | 12/31/2020 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Battery/Storage | Minco-Gracemont 345kV line | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-108 | DISIS-2018-002 | 03 CENTRAL | Barber | KS | 12/31/2020 | 95 | 95 | 95 | ER/NR | 0 | 0 | 0 | Battery/Storage | Thistle 345kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-107 | DISIS-2018-002 | Pemiscot | MO | 12/31/2023 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Solar | Paragould 161kV substation | 11/21/2018 | 4/16/2020 | WITHDRAWN | N/A | ||||||||||||
| GEN-2018-106 | DISIS-2018-002 | 04 SOUTHEAST | Caddo | LA | 12/31/2023 | 330 | 330 | 330 | ER/NR | 0 | 0 | 0 | Solar | Longwood 345kV substation | 11/2/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-105 | DISIS-2018-002 | 04 SOUTHEAST | Caddo | LA | 12/31/2023 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Battery/Storage | Longwood 345kV | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-104 | DISIS-2018-002 | 03 CENTRAL | Jackson | MO | 12/31/2023 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Battery/Storage | Longwood 345kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-103 | DISIS-2018-002 | 03 CENTRAL | Jackson | MO | 12/31/2023 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Solar | Missouri City 161kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-102 | DISIS-2018-002 | 03 CENTRAL | Jackson | MO | 12/31/2023 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Solar | Missouri City 161kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-101 | DISIS-2018-002 | 03 CENTRAL | Cass | MO | 12/31/2023 | 175 | 175 | 175 | ER/NR | 0 | 0 | 0 | Solar | Lydia 345kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-100 | DISIS-2018-002 | 04 SOUTHEAST | Pemiscot | MO | 12/31/2023 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Solar | Kennet 161kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-099 | DISIS-2018-002 | 03 CENTRAL | Ralls | MO | 12/31/2023 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Wind | Salisbury 161kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-098 | DISIS-2018-002 | 04 SOUTHEAST | Caddo | OK | 12/31/2021 | 40 | 40 | 40 | ER/NR | 0 | 0 | 0 | Battery/Storage | Oney 138kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-097 | DISIS-2018-002 | 04 SOUTHEAST | Craig/Novata | OK | 12/31/2023 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Battery/Storage | Neosho-Delaware 345kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-096 | DISIS-2018-002 | 03 CENTRAL | Jackson | MO | 12/31/2023 | 205 | 205 | 205 | ER/NR | 0 | 0 | 0 | Solar | Nashua 345kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-095 | DISIS-2018-002 | 03 CENTRAL | Jackson | MO | 12/31/2023 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Battery/Storage | Nashua 345kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-094 | DISIS-2018-002 | New Madrid | MO | 12/31/2023 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Solar | Doniphan 161kV substation | 11/21/2018 | 4/16/2020 | WITHDRAWN | N/A | ||||||||||||
| GEN-2018-093 | DISIS-2018-002 | 03 CENTRAL | Sedgwick | KS | 12/31/2021 | 60 | 60 | 60 | ER/NR | 0 | 0 | 0 | Battery/Storage | Wichita 345kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-092 | DISIS-2018-002 | 05 SOUTHWEST | Foard/Wilbarger | TX | 12/31/2023 | 400 | 400 | 400 | ER/NR | 0 | 0 | 0 | Solar | Oklaunion 345kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-091 | DISIS-2018-002 | 05 SOUTHWEST | Wilbarger | OK | 12/31/2023 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Battery/Storage | Oklaunion 345kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-090 | DISIS-2018-002 | 02 NEBRASKA | Washington | NE | 12/31/2023 | 125 | 125 | 125 | ER/NR | 0 | 0 | 0 | Battery/Storage | Fort Calhoun 345kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-089 | DISIS-2018-002 | 02 NEBRASKA | Washington | NE | 12/31/2023 | 196 | 196 | 196 | ER/NR | 0 | 0 | 0 | Solar | Fort Calhoun 345kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-088 | DISIS-2018-002 | 04 SOUTHEAST | Bowie | TX | 12/31/2023 | 130 | 130 | 130 | ER/NR | 0 | 0 | 0 | Solar | Lydia 345kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-087 | DISIS-2018-002 | 04 SOUTHEAST | Morris | TX | 12/31/2023 | 75 | 75 | 75 | ER/NR | 0 | 0 | 0 | Battery/Storage | Lydia-Welsh 345kV line | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-086 | DISIS-2018-002 | 05 SOUTHWEST | Terry | TX | 12/31/2020 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Battery/Storage | Sulphur Springs 115kV substation | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-085 | DISIS-2018-002 | 05 SOUTHWEST | Bailey | TX | 12/31/2019 | 74 | 74 | 74 | ER/NR | 0 | 0 | 0 | Battery/Storage | Roosevelt-Tolk 230kV line | 11/21/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-084 | DISIS-2018-002 | 03 CENTRAL | Linn | MO | 12/31/2023 | 80 | 80 | 80 | ER/NR | 0 | 0 | 0 | Solar | Archie 161kV substation | 11/19/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-083 | DISIS-2018-002 | 02 NEBRASKA | Madison | NE | 12/31/2023 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Wind | Norfolk 115kV substation | 11/16/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-082 | DISIS-2018-002 | 04 SOUTHEAST | Morris | TX | 12/31/2023 | 270 | 270 | 270 | ER/NR | 0 | 0 | 0 | Solar | Lydia-Welsh 345kV line | 11/18/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-081 | DISIS-2018-002 | 04 SOUTHEAST | Craig | OK | 12/31/2023 | 175 | 175 | 175 | ER/NR | 0 | 0 | 0 | Solar | Neosho-Delaware 345kV line | 11/18/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-080 | DISIS-2018-002 | Craig | OK | 12/31/2023 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Solar | Neosho-Delaware 345kV line | 11/18/2018 | 4/16/2020 | WITHDRAWN | N/A | ||||||||||||
| GEN-2018-079 | DISIS-2018-002 | 04 SOUTHEAST | Craig/Novata | OK | 12/31/2023 | 148 | 148 | 148 | ER/NR | 0 | 0 | 0 | Solar | Neosho-Delaware 345kV line | 11/18/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-078 | DISIS-2019-001 | 05 SOUTHWEST | Lea County | NM | 12/31/2021 | 240 | 240 | 240 | ER/NR | 0 | 0 | 0 | Wind | Eddy County-Crossroads | 11/19/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-077 | DISIS-2018-002 | Randall | TX | 12/31/2021 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Solar | 11/16/2018 | 9/25/2019 | WITHDRAWN | N/A | |||||||||||||
| GEN-2018-076 | Logan | OK | OKGE | 12/1/2021 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Solar | Crescent substation 138kV | 10/27/2018 | 12/3/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2018-075 | FCS-2018-004 | Eddy | NM | SWPS | 9/30/2021 | 230 | 230 | 230 | ER | 0 | 0 | 0 | Thermal | CT | Kiowa Substation 115kV (90753) | 10/26/2018 | 4/16/2019 | WITHDRAWN | N/A | ||||||||||
| GEN-2018-074 | DISIS-2018-002 | 01 NORTH | Crawford and Carrol | IA | WAPA | 5/10/2022 | 120 | 120 | 120 | ER/NR | 0 | 0 | 0 | Wind | Denison 230kV | 10/31/2018 | DISIS STAGE | N/A | |||||||||||
| GEN-2018-073 | DISIS-2018-002 | 05 SOUTHWEST | Floyd | TX | 10/30/2020 | 250 | 250 | 250 | ER | 0 | 0 | 0 | Solar | New switching station on Border-Tuco 345kV tap | 10/24/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-072 | DISIS-2018-002 | 04 SOUTHEAST | Osage | OK | OKGE | 11/30/2021 | 151.2 | 151.2 | 151.2 | ER | 0 | 0 | 0 | Wind | Ranch Road 345 kV | 10/26/2018 | DISIS STAGE | N/A | |||||||||||
| GEN-2018-071 | DISIS-2018-002 | 04 SOUTHEAST | Kay | OK | 11/30/2021 | 151.2 | 151.2 | 151.2 | ER | 0 | 0 | 0 | Wind | Ranch Road 345 kV | 10/25/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-070 | DISIS-2018-002 | 01 NORTH | Bon Homme | SD | WAPA | 12/31/2019 | 4/22/2020 | 18.31 | 18.31 | 18.31 | ER/NR | 0 | 0 | 0 | Wind | Utica Junction 230 kV substation | 10/29/2018 | DISIS STAGE | N/A | ||||||||||
| GEN-2018-069 | DISIS-2018-002 | 01 NORTH | Wibaux | MT | WAPA | 12/31/2020 | 125 | 125 | 125 | ER/NR | 0 | 0 | 0 | Wind | Mingusville 230kV switchyard | 10/26/2018 | DISIS STAGE | N/A | |||||||||||
| GEN-2018-068 | DISIS-2018-002 | 02 NEBRASKA | Madison | NE | 9/1/2022 | 302.4 | 302.4 | 302.4 | ER/NR | 0 | 0 | 0 | Wind | Tap on 348kV Antelope to Hopkins transmission line | 10/26/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-067 | DISIS-2018-002 | 01 NORTH | Williams | ND | BEPC | 10/30/2020 | 255 | 255 | 255 | ER | 0 | 0 | 0 | Wind | New switching station on Judson-Tande 345kV line | 10/25/2018 | DISIS STAGE | N/A | |||||||||||
| GEN-2018-066 | FCS-2018-004 | Lincoln | NE | NPPD | 1/6/2022 | 400 | 400 | 400 | ER/NR | 0 | 0 | 0 | Solar | Gerald Gentleman 345kV switchyard | 10/24/2018 | 4/16/2019 | WITHDRAWN | N/A | |||||||||||
| GEN-2018-065 | DISIS-2018-002 | 03 CENTRAL | Marion | KS | 7/1/2020 | 19.8 | 19.8 | 19.8 | ER/NR | 0 | 0 | 0 | Wind | Emporia Energy Center-Wichita 345kV | 10/24/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-064 | DISIS-2018-002 | 04 SOUTHEAST | Benton | AR | 6/30/2021 | 80 | 80 | 80 | ER/NR | 0 | 0 | 0 | Solar | Tonnece Substation 69kV | 10/24/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-063 | DISIS-2018-002 | 03 CENTRAL | Greene | MO | 6/30/2021 | 57 | 57 | 57 | ER/NR | 0 | 0 | 0 | Solar | 69kV ring bus interconnetion to Sedalia and Nicols Street 69kV line | 10/23/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-062 | DISIS-2018-001 | 03 CENTRAL | Wyandotte | KS | 12/31/2020 | 75.6 | 75.6 | 75.6 | ER/NR | 0 | 0 | 0 | Solar | Nearman 161kV substation | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-061 | DISIS-2018-001 | 03 CENTRAL | Jasper | MO | 12/31/2021 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Battery/Storage | Blackberry - Neosho 345kV Line | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-060 | DISIS-2018-001 | 02 NEBRASKA | Webster | NE | 12/1/2020 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Wind | Axtell-Post Rock 345 kV | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-059 | DISIS-2018-001 | 03 CENTRAL | Leavenworth | KS | 12/31/2020 | 252 | 252 | 252 | ER/NR | 0 | 0 | 0 | Solar | Stranger Creek 345kV | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-058 | DISIS-2018-001 | 03 CENTRAL | Leavenworth | KS | 12/31/2020 | 252 | 252 | 252 | ER/NR | 0 | 0 | 0 | Solar | Stranger Creek 345kV | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-057 | DISIS-2018-001 | 03 CENTRAL | Sedgwick | KS | 12/31/2020 | 203.4 | 203.4 | 203.4 | ER/NR | 0 | 0 | 0 | Solar | Gordon Evans 138kV | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-056 | DISIS-2018-001 | 02 NEBRASKA | Knox/Holt | NE | 12/31/2020 | 102.6 | 102.6 | 102.6 | ER/NR | 0 | 0 | 0 | Solar | Fort Thompson-Grand Island (Grand Prairie) 345kV | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-055 | DISIS-2018-001 | 04 SOUTHEAST | Grady | OK | 12/31/2020 | 252 | 252 | 252 | ER/NR | 0 | 0 | 0 | Solar | Lawton East Side-Sunnyside (Terry Road) 345kV | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-054 | DISIS-2018-001 | 03 CENTRAL | Linn | KS | 12/31/2021 | 120 | 120 | 120 | ER/NR | 0 | 0 | 0 | Solar | Archie 161kV Substation | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-053 | DISIS-2018-001 | 03 CENTRAL | Jasper | MO | 12/31/2021 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Solar | Blackberry - Neosho 345kV Line | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-052 | DISIS-2018-001 | 05 SOUTHWEST | Lea | NM | 12/31/2021 | 70 | 70 | 70 | ER/NR | 0 | 0 | 0 | Battery/Storage | Roadrunner 115kV Substation | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-051 | DISIS-2018-001 | 05 SOUTHWEST | Swisher | TX | 12/31/2021 | 35 | 35 | 35 | ER/NR | 0 | 0 | 0 | Battery/Storage | Swisher 115kV Substation | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-050 | DISIS-2018-001 | 04 SOUTHEAST | Caddo | OK | 12/31/2021 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Solar | Gracemont-Minco 345kV Line | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-049 | DISIS-2018-001 | 03 CENTRAL | Sumner | KS | 12/31/2021 | 120 | 120 | 120 | ER/NR | 0 | 0 | 0 | Solar | Wichita 345kV Substation | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-048 | DISIS-2018-001 | 04 SOUTHEAST | Caddo | OK | 12/31/2021 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Solar | Pecan Creek 345kV Substation | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-047 | DISIS-2018-001 | Ellsworth | KS | 12/31/2021 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Wind | Swissvale 345kV | 5/29/2018 | 4/16/2020 | WITHDRAWN | N/A | ||||||||||||
| GEN-2018-046 | DISIS-2018-001 | 02 NEBRASKA | Banner | NE | NPPD | 12/31/2021 | 398.2 | 398.2 | 398.2 | ER/NR | 0 | 0 | 0 | Wind | Gerald Gentleman 345kV Substation | 5/29/2018 | DISIS STAGE | N/A | |||||||||||
| GEN-2018-045 | DISIS-2018-001 | 02 NEBRASKA | Banner | NE | NPPD | 12/31/2021 | 599.8 | 599.8 | 599.8 | ER/NR | 0 | 0 | 0 | Wind | Gerald Gentleman 345kV Substation | 5/29/2018 | DISIS STAGE | N/A | |||||||||||
| GEN-2018-044 | DISIS-2018-001 | 02 NEBRASKA | Antelope | NE | 12/31/2021 | 500 | 500 | 500 | ER/NR | 0 | 0 | 0 | Wind | Fort Calhoun 345kV Substation | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-043 | DISIS-2018-001 | 02 NEBRASKA | Antelope | NE | 12/31/2021 | 500 | 500 | 500 | ER/NR | 0 | 0 | 0 | Solar | Ft. Calhoun - Raun 345 kV Line | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-042 | DISIS-2018-001 | 03 CENTRAL | Johnson | NE | 12/31/2021 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Wind | Sibley - Overton 345kV Line | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-041 | DISIS-2018-001 | 03 CENTRAL | Ralls | MO | 12/31/2021 | 400 | 400 | 400 | ER/NR | 0 | 0 | 0 | Wind | Sibley - Overton 345kV Line | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-040 | DISIS-2018-001 | 03 CENTRAL | Ralls | MO | 12/31/2021 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Wind | Sibley - Overton 345kV Line | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-039 | DISIS-2018-001 | 01 NORTH | LaMoure | ND | BEPC | 12/31/2020 | 72 | 72 | 72 | ER/NR | 0 | 0 | 0 | Solar | Edgeley 115kV substation | 5/29/2018 | DISIS STAGE | N/A | |||||||||||
| GEN-2018-038 | DISIS-2018-001 | 03 CENTRAL | Ray | MO | 12/31/2020 | 203.4 | 203.4 | 203.4 | ER/NR | 0 | 0 | 0 | Solar | Sibley 345kV substation | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-037 | DISIS-2018-001 | 02 NEBRASKA | Douglas | NE | 12/1/2020 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Battery/Storage | North Omaha (S1211) 161kV | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-036 | DISIS-2018-001 | 02 NEBRASKA | Scotts Bluff | NE | 12/1/2020 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Battery/Storage | Stegall 230kV Substation | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-035 | DISIS-2018-001 | 01 NORTH | Clark | SD | BEPC | 8/1/2021 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Groton-Watertown 345kV Line | 5/14/2018 | DISIS STAGE | N/A | |||||||||||
| GEN-2018-034 | DISIS-2018-001 | Mayes | OK | GRDA | 6/1/2018 | 40 | 40 | 40 | ER/NR | 0 | 0 | 0 | Thermal | Steam | Grand River Energy Center 161kV | 5/29/2018 | 12/10/2019 | WITHDRAWN | N/A | ||||||||||
| GEN-2018-033 | DISIS-2018-001 | 02 NEBRASKA | Cass | NE | OPPD | 12/1/2020 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Battery/Storage | Cass County 345kV Substation | 5/29/2018 | DISIS STAGE | N/A | |||||||||||
| GEN-2018-032 | DISIS-2018-001 | 03 CENTRAL | McPhearson | KS | 12/1/2021 | 310 | 310 | 310 | ER | 0 | 0 | 0 | Wind | Neosho 345kV Substation | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-031 | DISIS-2018-001 | 03 CENTRAL | Jackson | MO | 12/1/2020 | 50 | 50 | 50 | ER | 0 | 0 | 0 | Battery/Storage | Blue Valley 161kV Substation | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-030 | DISIS-2018-001 | 03 CENTRAL | Prowers | CO | SWPS | 12/1/2020 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Battery/Storage | Lamar 345kV Substation | 5/29/2018 | DISIS STAGE | N/A | |||||||||||
| GEN-2018-029 | DISIS-2018-001 | 04 SOUTHEAST | Oklahoma | OK | OKGE | 12/1/2020 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Battery/Storage | Horseshoe Lake 138kV Substation | 5/29/2018 | DISIS STAGE | N/A | |||||||||||
| GEN-2018-028 | DISIS-2018-001 | 04 SOUTHEAST | Tulsa | OK | 12/1/2020 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Battery/Storage | Tulsa North 138kV Substation | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-027 | DISIS-2018-001 | 04 SOUTHEAST | Tulsa | OK | 12/1/2020 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Battery/Storage | Tulsa 138kV Substation | 5/29/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-026 | DISIS-2018-001 | 04 SOUTHEAST | Canadian | OK | OKGE | 12/1/2020 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Battery/Storage | Mustang 138kV Substation | 5/29/2018 | DISIS STAGE | N/A | |||||||||||
| GEN-2018-025 | DISIS-2018-001 | 02 NEBRASKA | Washington | NE | OPPD | 12/1/2020 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Battery/Storage | Fort Calhoun 345kV Substation | 5/29/2018 | DISIS STAGE | N/A | |||||||||||
| GEN-2018-024 | DISIS-2018-001 | 04 SOUTHEAST | Muskogee | OK | 12/1/2020 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Battery/Storage | Canadian River-Muskogee and Muskogee-Seminole 345kV | 5/28/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-023 | DISIS-2018-001 | Little River | AR | 12/1/2021 | 126 | 126 | 126 | ER/NR | 0 | 0 | 0 | Solar | South Foreman 138kV Substation | 4/27/2018 | 11/4/2021 | WITHDRAWN | N/A | ||||||||||||
| GEN-2018-022 | DISIS-2018-001 | 03 CENTRAL | Nodaway | MO | 12/31/2020 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Solar | Mullen Creek 345kV Substation | 5/25/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-021 | DISIS-2018-001 | 04 SOUTHEAST | Washita | OK | 12/1/2020 | 74.1 | 74.1 | 74.1 | ER/NR | 0 | 0 | 0 | Solar | Chisholm-Gracemont 345kV Line | 5/24/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-020 | DISIS-2018-001 | Curry | NM | SWPS | 12/31/2020 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Solar | Roosevolt 115kV | 5/16/2018 | 11/5/2019 | WITHDRAWN | N/A | |||||||||||
| GEN-2018-019 | DISIS-2018-001 | Yoakum | TX | SWPS | 12/31/2020 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Solar | Tap onto the Cochran to Lehman line at 115kV | 5/16/2018 | 6/18/2019 | WITHDRAWN | N/A | |||||||||||
| GEN-2018-018 | DISIS-2018-001 | Springfield | MO | 11/30/2020 | 57 | 57 | 57 | ER/NR | 0 | 0 | 0 | Solar | 69kV ring bus interconnecting to Sedalia and Nichols Street | 5/8/2018 | 6/4/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2018-017 | DISIS-2018-001 | 02 NEBRASKA | Brule | NE | NPPD | 12/31/2020 | 302.4 | 302.4 | 302.4 | ER | 0 | 0 | 0 | Wind | Ogallala-Sydney 230kV | 4/27/2018 | DISIS STAGE | N/A | |||||||||||
| GEN-2018-016 | DISIS-2018-001 | 02 NEBRASKA | Brule | NE | NPPD | 12/31/2020 | 100.8 | 100.8 | 100.8 | ER | 0 | 0 | 0 | Wind | Brule 115kV Substation | 4/27/2018 | DISIS STAGE | N/A | |||||||||||
| GEN-2018-015 | DISIS-2018-001 | 05 SOUTHWEST | Vernon/Wilbarger | TX | 10/31/2021 | 252 | 252 | 252 | ER/NR | 0 | 0 | 0 | Wind | Tuco-Oklaunion 345kV Line | 4/27/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-014 | DISIS-2018-001 | 03 CENTRAL | Holt | MO | 11/30/2020 | 74.1 | 74.1 | 74.1 | ER/NR | 0 | 0 | 0 | Battery/Storage | Holt County 345kV Switching Station | 4/27/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-013 | DISIS-2018-001 | 03 CENTRAL | Dickinson | KS | 12/1/2021 | 74.1 | 74.1 | 74.1 | ER/NR | 0 | 0 | 0 | Battery/Storage | Abilene Energy Center-Northview 115kV Line | 4/27/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-012 | DISIS-2018-001 | 02 NEBRASKA | Wayne | NE | 12/1/2021 | 74.1 | 74.1 | 74.1 | ER/NR | 0 | 0 | 0 | Battery/Storage | Hoskins 345kV Substation | 4/27/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-011 | DISIS-2018-001 | 04 SOUTHEAST | Kingfisher | OK | 12/1/2020 | 74.1 | 74.1 | 74.1 | ER/NR | 0 | 0 | 0 | Battery/Storage | Dover 138 kV Switching Station | 4/27/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-010 | DISIS-2018-001 | 01 NORTH | Montrail | ND | BEPC | 12/1/2021 | 74.1 | 74.1 | 74.1 | ER/NR | 0 | 0 | 0 | Battery/Storage | Tande 345kV Substation | 4/27/2018 | DISIS STAGE | N/A | |||||||||||
| GEN-2018-009 | DISIS-2018-001 | 03 CENTRAL | Seward/Meade | KS | SUNC | 12/1/2020 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Wind | Cimarron 115kV Substation | 4/27/2018 | DISIS STAGE | N/A | |||||||||||
| GEN-2018-008 | DISIS-2018-001 | 01 NORTH | McIntosh | ND | BEPC | 9/30/2021 | 252 | 252 | 252 | ER/NR | 0 | 0 | 0 | Wind | Groton-Leland Olds 345kV Line | 4/27/2018 | DISIS STAGE | N/A | |||||||||||
| GEN-2018-007 | DISIS-2018-001 | 01 NORTH | Grant/Roberts | SD | WAPA | 12/31/2021 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Wind | Summit 115kV Substation | 4/27/2018 | DISIS STAGE | N/A | |||||||||||
| GEN-2018-006 | FCS-2018-002 | Lawrence | MO | EDE | 12/1/2021 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Solar | Monett 161kV bus | 4/25/2018 | 9/27/2018 | WITHDRAWN | N/A | |||||||||||
| GEN-2018-005 | DISIS-2018-001 | Garland | OK | OKGE | 12/1/2021 | 500 | 500 | 500 | ER/NR | 0 | 0 | 0 | Solar | Woodring 345kV | 4/25/2018 | 4/27/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2018-004 | DISIS-2018-001 | 05 SOUTHWEST | Lea | NM | 12/31/2019 | 74.99 | 74.99 | 74.99 | ER | 0 | 0 | 0 | Solar | Maddox 115kV Substation | 4/26/2018 | DISIS STAGE | N/A | ||||||||||||
| GEN-2018-003 | DISIS-2018-001 | 04 SOUTHEAST | Bowie | TX | AEPW | 12/31/2021 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Solar | North Boston-Bann 138kV Line | 4/25/2018 | DISIS STAGE | N/A | |||||||||||
| GEN-2018-002 | DISIS-2018-001 | Florence | KS | 9/14/2019 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | 2/7/2018 | 3/30/2018 | WITHDRAWN | N/A | |||||||||||||
| GEN-2018-001 | DISIS-2018-001 | Deaf Smith | TX | SWPS | 12/1/2021 | 270 | 270 | 270 | ER/NR | 0 | 0 | 0 | Wind | Bushland-Deaf Smith 230kV Line | 2/2/2018 | 11/30/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-241 | DISIS-2017-002 | Cozad | NE | 8/1/2018 | 10 | 10 | 10 | ER | 0 | 0 | 0 | Wind | Cozad 115kV Substation | 7/21/2017 | 1/11/2019 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-240 | DISIS-2017-002 | 04 SOUTHEAST | Okmulgee | OK | OKGE | 12/1/2020 | 202 | 202 | 202 | ER/NR | 0 | 0 | 0 | Solar | Bristow 138kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-239 | DISIS-2017-002 | 05 SOUTHWEST | Yoakum | TX | SWPS | 6/1/2023 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Solar | Mahoney 230kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-238 | DISIS-2017-002 | Kingfisher | OK | 9/1/2020 | 40 | 40 | 40 | ER/NR | 0 | 0 | 0 | Solar | Lacey 69kV | 11/30/2017 | 8/11/2020 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-237 | DISIS-2017-002 | 01 NORTH | Roosevelt | MT | BEPC | 9/1/2023 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Wind | Snake Butte 115kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-236 | DISIS-2017-002 | 01 NORTH | Ward | ND | BEPC | 12/1/2020 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Wind | Logan 230kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-235 | DISIS-2017-002 | 01 NORTH | Ward | ND | BEPC | 12/1/2020 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Wind | Logan 230kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-234 | DISIS-2017-002 | 02 NEBRASKA | Greeley | NE | NPPD | 12/31/2019 | 115 | 115 | 115 | ER | 0 | 0 | 0 | Wind | Spalding to North Loup 115kV | 11/6/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-233 | DISIS-2017-002 | 04 SOUTHEAST | Grady | OK | OKGE | 12/1/2020 | 215 | 215 | 215 | ER/NR | 0 | 0 | 0 | Wind | Minco 345kV | 11/28/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-232 | DISIS-2017-002 | 04 SOUTHEAST | Bryan County | OK | OKGE | 6/1/2020 | 52.2 | 52.2 | 52.2 | ER/NR | 0 | 0 | 0 | Solar | Brown 138kV Substation | 11/28/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-231 | DISIS-2017-002 | 04 SOUTHEAST | Franklin County | AR | OKGE | 6/1/2020 | 72.5 | 72.5 | 72.5 | ER/NR | 0 | 0 | 0 | Solar | Branch 161kV Substation | 11/28/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-230 | DISIS-2017-002 | 04 SOUTHEAST | Lincoln County | OK | OKGE | 6/1/2020 | 72.5 | 72.5 | 72.5 | ER/NR | 0 | 0 | 0 | Solar | Tryon 138kV Substation | 11/28/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-229 | DISIS-2017-002 | 03 CENTRAL | Johnson County | KS | KCPL | 12/31/2020 | 76 | 76 | 76 | ER/NR | 0 | 0 | 0 | Battery/Storage | Stilwell 345kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-228 | DISIS-2017-002 | 03 CENTRAL | Johnson County | KS | KCPL | 12/1/2020 | 302.4 | 302.4 | 302.4 | ER/NR | 0 | 0 | 0 | Solar | Stilwell 345kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-227 | DISIS-2017-002 | 03 CENTRAL | Sedwick County | KS | WERE | 12/31/2020 | 201.6 | 201.6 | 201.6 | ER/NR | 0 | 0 | 0 | Battery/Storage | Gordon Evans 138kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-226 | DISIS-2017-002 | 03 CENTRAL | Sedgwick County | KS | WERE | 12/1/2020 | 201.6 | 201.6 | 201.6 | ER/NR | 0 | 0 | 0 | Solar | Gordon Evans 138kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-225 | DISIS-2017-002 | 03 CENTRAL | Johnson County | KS | KCPL | 12/31/2020 | 76 | 76 | 76 | ER/NR | 0 | 0 | 0 | Battery/Storage | Craig 345kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-224 | DISIS-2017-002 | 03 CENTRAL | Johnson County | KS | KCPL | 12/1/2020 | 302.4 | 302.4 | 302.4 | ER/NR | 0 | 0 | 0 | Solar | Craig 345kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-223 | DISIS-2017-002 | Haakon County | SD | WAPA | 4/1/2020 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Wind | Philip 230kV Substation | 11/19/2017 | 2/15/2018 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-222 | DISIS-2017-002 | 01 NORTH | Denison | IA | WAPA | 10/6/2020 | 180 | 180 | 180 | ER/NR | 0 | 0 | 0 | Wind | Denison 230kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-221 | DISIS-2017-002 | 03 CENTRAL | Sedgwick | KS | WERE | 12/31/2020 | 152 | 152 | 152 | ER/NR | 0 | 0 | 0 | Battery/Storage | Buffalo Flats 345kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-220 | DISIS-2017-002 | 03 CENTRAL | Sedgwick | KS | WERE | 12/1/2020 | 201.6 | 201.6 | 201.6 | ER/NR | 0 | 0 | 0 | Solar | Buffalo Flats 345kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-219 | DISIS-2017-002 | 05 SOUTHWEST | Lamb | TX | SWPS | 12/1/2020 | 600 | 600 | 600 | ER/NR | 0 | 0 | 0 | Solar | Tolk East 230kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-218 | DISIS-2017-002 | 05 SOUTHWEST | Lamb | TX | SWPS | 12/1/2020 | 600 | 600 | 600 | ER/NR | 0 | 0 | 0 | Solar | Tolk-Plant X 230kV Line | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-217 | DISIS-2017-002 | 05 SOUTHWEST | Lamb | TX | SWPS | 12/1/2020 | 600 | 600 | 600 | ER/NR | 0 | 0 | 0 | Solar | Plant X 230kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-216 | DISIS-2017-002 | 01 NORTH | Ward | ND | BEPC | 12/1/2020 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Wind | Logan 230kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-215 | DISIS-2017-002 | 01 NORTH | Ward | ND | BEPC | 12/1/2020 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Wind | Logan 230kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-214 | DISIS-2017-002 | 01 NORTH | Ward | ND | BEPC | 12/1/2020 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Wind | Logan 230kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-213 | DISIS-2017-002 | 04 SOUTHEAST | Grant/Kay | OK | AEPW | 12/1/2021 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Hybrid | Solar | Clarksville 345kV Substation | 11/30/2017 | DISIS STAGE | N/A | ||||||||||
| GEN-2017-212 | DISIS-2017-002 | Cedar | NE | 12/1/2021 | 310 | 310 | 310 | ER | 0 | 0 | 0 | Solar | Mark T. Moore 345kV Substation | 11/30/2017 | 2/5/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-211 | DISIS-2017-002 | McPherson | KS | 12/1/2021 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Solar | Neosho 345kV Substation | 11/30/2017 | 2/5/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-210 | DISIS-2017-002 | 02 NEBRASKA | Cedar | NE | NPPD | 12/1/2021 | 310 | 310 | 310 | ER | 0 | 0 | 0 | Hybrid | Solar | McCool 345kV Substation | 11/30/2017 | DISIS STAGE | N/A | ||||||||||
| GEN-2017-209 | DISIS-2017-002 | 03 CENTRAL | McPherson | KS | KCPL | 12/1/2021 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Hybrid | Solar | LaCygne - Neosho 345kV | 11/30/2017 | DISIS STAGE | N/A | ||||||||||
| GEN-2017-208 | DISIS-2017-002 | 03 CENTRAL | McPherson | KS | WERE | 12/1/2021 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Hybrid | Solar | Benton 138kV Substation | 11/30/2017 | DISIS STAGE | N/A | ||||||||||
| GEN-2017-207 | DISIS-2017-002 | Grant/Kay | OK | 12/1/2021 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Solar | 11/30/2017 | 2/5/2018 | WITHDRAWN | N/A | |||||||||||||
| GEN-2017-206 | DISIS-2017-002 | McPhearson | KS | 12/1/2021 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Solar | Viola 345kV | 11/30/2017 | 9/15/2020 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-205 | DISIS-2017-002 | 03 CENTRAL | McPhearson | KS | WERE | 12/1/2020 | 310 | 310 | 310 | ER | 0 | 0 | 0 | Hybrid | Solar | East McPherson 230kV | 11/30/2017 | DISIS STAGE | N/A | ||||||||||
| GEN-2017-204 | DISIS-2017-002 | 03 CENTRAL | McPherson | KS | WERE | 12/1/2020 | 210 | 210 | 210 | ER | 0 | 0 | 0 | Hybrid | Solar | Reno-Summit 345kV Line | 11/30/2017 | DISIS STAGE | N/A | ||||||||||
| GEN-2017-203 | DISIS-2017-002 | 04 SOUTHEAST | Grant/Kay | OK | OKGE | 7/1/2023 | 8/1/2023 | 210 | 210 | 210 | ER | 0 | 0 | 0 | Hybrid | Solar | Renfrow 345kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||
| GEN-2017-202 | DISIS-2017-002 | 03 CENTRAL | New Madrid | MO | SWPA | 12/1/2020 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Solar | New Madrid - Sikeston 161kV | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-201 | DISIS-2017-002 | 02 NEBRASKA | Wayne County | NE | NPPD | 12/1/2022 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Wind | Hoskins 345kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-200 | DISIS-2017-002 | 01 NORTH | Beadle | SD | BEPC | 12/1/2020 | 302 | 302 | 302 | ER/NR | 0 | 0 | 0 | Wind | Groton 345kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-199 | DISIS-2017-002 | 01 NORTH | Beadle | SD | BEPC | 12/1/2020 | 202 | 202 | 202 | ER/NR | 0 | 0 | 0 | Battery/Storage | Groton 345kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-198 | DISIS-2017-002 | 02 NEBRASKA | Omaha | NE | OPPD | 12/1/2022 | 12/31/2022 | 20 | 20 | 20 | ER/NR | 0 | 0 | 0 | Battery/Storage | Jones St. No 901 69kV substation | 11/30/2017 | DISIS STAGE | N/A | ||||||||||
| GEN-2017-197 | DISIS-2017-002 | 04 SOUTHEAST | Woodward | OK | WFEC | 12/1/2022 | 12/31/2022 | 80 | 80 | 80 | ER | 0 | 0 | 0 | Battery/Storage | Fort Supply SW 138kV Substation | 11/30/2017 | DISIS STAGE | N/A | ||||||||||
| GEN-2017-196 | DISIS-2017-002 | 03 CENTRAL | Johnson | KS | KCPL | 12/1/2020 | 128 | 128 | 128 | ER/NR | 0 | 0 | 0 | Battery/Storage | West Gardner 345kV | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-195 | DISIS-2017-002 | 03 CENTRAL | Johnson | KS | KCPL | 12/1/2020 | 500.4 | 500.4 | 500.4 | ER/NR | 0 | 0 | 0 | Solar | West Gardner 345kV | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-194 | DISIS-2017-002 | 03 CENTRAL | Shawnee | KS | WERE | 12/31/2020 | 52 | 52 | 52 | ER/NR | 0 | 0 | 0 | Battery/Storage | Tecumseh 230kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-193 | DISIS-2017-002 | 03 CENTRAL | Shawnee | KS | WERE | 12/1/2020 | 201.6 | 201.6 | 201.6 | ER/NR | 0 | 0 | 0 | Solar | Tecumseh 230kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-192 | DISIS-2017-002 | 03 CENTRAL | Osage | KS | WERE | 12/31/2020 | 52 | 52 | 52 | ER/NR | 0 | 0 | 0 | Battery/Storage | WERE | Swissvale 345kV | 11/30/2017 | DISIS STAGE | N/A | ||||||||||
| GEN-2017-191 | DISIS-2017-002 | 03 CENTRAL | Osage | KS | WERE | 12/1/2020 | 201.6 | 201.6 | 201.6 | ER/NR | 0 | 0 | 0 | Solar | Swissvale 345kV | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-190 | DISIS-2017-002 | 05 SOUTHWEST | Bailey | TX | SWPS | 12/31/2020 | 300.3 | 300.3 | 300.3 | ER/NR | 0 | 0 | 0 | Solar | Roosevelt-Tolk 230kV | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-189 | DISIS-2017-002 | 03 CENTRAL | Jasper | MO | WERE | 12/31/2020 | 201.6 | 201.6 | 201.6 | ER/NR | 0 | 0 | 0 | Solar | Blackberry - Neosho 345kV line | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-188 | DISIS-2017-002 | 03 CENTRAL | Barry | MO | EMDE | 12/31/2020 | 170 | 170 | 170 | ER/NR | 0 | 0 | 0 | Solar | Asbury 161 kV | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-187 | DISIS-2017-002 | 05 SOUTHWEST | Terry | TX | SWPS | 12/31/2020 | 199.5 | 199.5 | 199.5 | ER/NR | 0 | 0 | 0 | Solar | Sulphur Springs 115kV Substation | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-186 | DISIS-2017-002 | 03 CENTRAL | Cass/Bates | MO | KCPL | 12/31/2020 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Solar | KC South-N. Raymore 161 kV | 11/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-185 | DISIS-2017-002 | 03 CENTRAL | Sumner | KS | OKGE | 12/1/2020 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Viola - Hunters 345kV | 11/29/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-184 | DISIS-2017-002 | 03 CENTRAL | Hodgeman/Ford | KS | KCPL | 12/1/2021 | 400 | 400 | 400 | ER/NR | 0 | 0 | 0 | Solar | Nashua-St. Joe 345kV | 11/29/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-183 | DISIS-2017-002 | 03 CENTRAL | Hodgeman/Ford | KS | KCPL | 12/1/2021 | 400 | 400 | 400 | ER/NR | 0 | 0 | 0 | Wind | Nashua-St. Joe 345kV | 11/29/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-182 | DISIS-2017-002 | 02 NEBRASKA | Lancaster | NE | NPPD | 12/1/2020 | 128 | 128 | 128 | ER/NR | 0 | 0 | 0 | Wind | Tobias 345kV Substation | 11/29/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-181 | DISIS-2017-002 | 02 NEBRASKA | Lancaster | NE | NPPD | 12/1/2020 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Wind | Tobias 345kV Substation | 11/29/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-180 | DISIS-2017-002 | Wagoner | OK | 12/1/2020 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Solar | Clarksville 345kV Substation | 11/29/2017 | 12/27/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-179 | DISIS-2017-002 | 03 CENTRAL | Sedgwick | KS | WERE | 12/1/2020 | 222 | 222 | 222 | ER/NR | 0 | 0 | 0 | Wind | Gordon Evans 138kV Substation | 11/29/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-178 | DISIS-2017-002 | 04 SOUTHEAST | Garfield | OK | OKGE | 12/31/2020 | 52 | 52 | 52 | ER/NR | 0 | 0 | 0 | Battery/Storage | Woodring 345kV Substation | 11/29/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-177 | DISIS-2017-002 | Post Oak | MO | 9/1/2023 | 40 | 40 | 40 | ER/NR | 0 | 0 | 0 | Solar | Post Oak 69kV | 11/29/2017 | 8/17/2020 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-176 | DISIS-2017-002 | 05 SOUTHWEST | Hart | TX | SWPS | 9/1/2023 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Wind | Newhart 230kV Substation | 11/29/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-175 | DISIS-2017-002 | 01 NORTH | Turner | SD | WAPA | 9/30/2023 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Wind | Vfodnes-Utica Jct. 230kV | 11/29/2017 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||||
| GEN-2017-174 | DISIS-2017-002 | Comanche | OK | 10/15/2020 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Solar | 11/29/2017 | 2/7/2018 | WITHDRAWN | N/A | |||||||||||||
| GEN-2017-173 | DISIS-2017-002 | 04 SOUTHEAST | Stephen | OK | AEPW | 12/1/2020 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Solar | Lawton Eastside - Terry Road 345kV | 11/29/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-172 | DISIS-2017-002 | 04 SOUTHEAST | Stephen | OK | AEPW | 12/1/2020 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Solar | Lawton Eastside - Terry Road 345kV | 11/29/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-171 | DISIS-2017-002 | 04 SOUTHEAST | Stephen | OK | AEPW | 12/1/2020 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Solar | Lawton Eastside - Terry Road 345kV | 11/29/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-170 | DISIS-2017-002 | Wagoner | OK | 12/31/2020 | 52 | 52 | 52 | ER/NR | 0 | 0 | 0 | Battery/Storage | Clarksville 345kV Substation | 11/29/2017 | 12/27/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-169 | DISIS-2017-002 | 04 SOUTHEAST | McClain | OK | OKGE | 12/31/2020 | 52 | 52 | 52 | ER/NR | 0 | 0 | 0 | Battery/Storage | McClain 138kV | 11/29/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-168 | DISIS-2017-002 | 04 SOUTHEAST | McClain | OK | OKGE | 12/1/2020 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Solar | McClain 138kV | 11/29/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-167 | DISIS-2017-002 | 04 SOUTHEAST | Carter | OK | OKGE | 12/31/2020 | 52 | 52 | 52 | ER/NR | 0 | 0 | 0 | Battery/Storage | Sunnyside 345kV | 11/29/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-166 | DISIS-2017-002 | 04 SOUTHEAST | Carter | OK | OKGE | 12/1/2020 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Solar | Sunnyside 345kV | 11/29/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-165 | DISIS-2017-002 | Holt | NE | 12/1/2020 | 288 | 288 | 288 | ER/NR | 0 | 0 | 0 | Wind | Grand Prairie-Grand Island (Holt County NE) 345kV | 11/29/2017 | 3/22/2019 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-164 | DISIS-2017-002 | 04 SOUTHEAST | Garfield | OK | OKGE | 12/1/2020 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Solar | Woodring 345kV Substation | 11/29/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-163 | DISIS-2017-002 | Sedgwick | KS | 12/1/2020 | 25 | 25 | 25 | ER/NR | 0 | 0 | 0 | Wind | Thistle-Wichita Dbl Ckt (Buffalo Flats) 345kV Line | 11/29/2017 | 12/17/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-162 | DISIS-2017-002 | 05 SOUTHWEST | Texas | OK | SWPS | 7/1/2019 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Wind | Texas County 115kV | 11/29/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-161 | DISIS-2017-002 | 05 SOUTHWEST | Cimarron and Texas | OK | SWPS | 7/1/2019 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Wind | Sherman 115kV substation | 11/29/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-160 | DISIS-2017-002 | Cimarron | OK | OKGE | 12/31/2020 | 350 | 350 | 350 | ER/NR | 0 | 0 | 0 | Wind | Mathewson 345kV | 11/29/2017 | 4/16/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-159 | DISIS-2017-002 | Cimarron and Texas | OK | OKGE | 12/31/2020 | 350 | 350 | 350 | ER/NR | 0 | 0 | 0 | Wind | Mathewson 345kV | 11/29/2017 | 4/16/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-158 | DISIS-2017-002 | 05 SOUTHWEST | Parmer/Castro | TX | SWPS | 12/31/2020 | 265 | 265 | 265 | ER/NR | 0 | 0 | 0 | Wind | Tolk 230kV Substation | 11/29/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-157 | DISIS-2017-002 | 04 SOUTHEAST | Pittsburg | OK | AEPW | 12/1/2020 | 202 | 202 | 202 | ER/NR | 0 | 0 | 0 | Wind | Pittsburg 345kV Substation | 11/28/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-156 | DISIS-2017-002 | 04 SOUTHEAST | Pittsburg | OK | AEPW | 12/1/2020 | 234 | 234 | 234 | ER/NR | 0 | 0 | 0 | Wind | Pittsburg 345kV Substation | 11/28/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-155 | DISIS-2017-002 | 04 SOUTHEAST | Muskogee | OK | OKGE | 12/1/2020 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Wind | Muskogee 345kV Substation | 11/28/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-154 | DISIS-2017-002 | 04 SOUTHEAST | Johnston | OK | OKGE | 12/1/2020 | 255 | 255 | 255 | ER/NR | 0 | 0 | 0 | Wind | Johnson County 345kV Substation | 11/28/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-153 | DISIS-2017-002 | 04 SOUTHEAST | McClain | OK | OKGE | 12/1/2020 | 253 | 253 | 253 | ER/NR | 0 | 0 | 0 | Wind | McClain 138kV | 11/28/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-152 | DISIS-2017-002 | 04 SOUTHEAST | McClain | OK | OKGE | 12/1/2020 | 252 | 252 | 252 | ER/NR | 0 | 0 | 0 | Wind | McClain 138kV | 11/28/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-151 | DISIS-2017-002 | 05 SOUTHWEST | Crosby | TX | SWPS | 10/31/2020 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | TUCO-Oklaunion 345kV | 11/28/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-150 | DISIS-2017-002 | 04 SOUTHEAST | Grady | OK | OKGE | 12/1/2020 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Solar | Minco 345kV | 11/28/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-149 | DISIS-2017-002 | 04 SOUTHEAST | Johnston | OK | OKGE | 12/1/2020 | 258 | 258 | 258 | ER/NR | 0 | 0 | 0 | Wind | Johnson County 345kV Substation | 11/27/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-148 | DISIS-2017-002 | 03 CENTRAL | Newton | MO | EMDE | 12/1/2020 | 202 | 202 | 202 | ER/NR | 0 | 0 | 0 | Wind | Joplin 161kV sub | 11/27/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-147 | DISIS-2017-002 | 03 CENTRAL | Johnson | KS | KCPL | 12/1/2020 | 252 | 252 | 252 | ER/NR | 0 | 0 | 0 | Wind | Stilwell 345kV | 11/27/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-146 | DISIS-2017-002 | 05 SOUTHWEST | Castro | TX | SWPS | 10/31/2020 | 151.8 | 151.8 | 151.8 | ER | 0 | 0 | 0 | Wind | Deaf Smith-Plant X 230kV | 11/27/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-145 | DISIS-2017-002 | 05 SOUTHWEST | Lea | NM | SWPS | 12/31/2020 | 110.3 | 110.3 | 110.3 | ER/NR | 0 | 0 | 0 | Solar | Roadrunner 115kV | 11/27/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-144 | DISIS-2017-002 | 02 NEBRASKA | Holt, Antelope, Wheeler | NE | WAPA | 12/31/2021 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Holt County 345kV | 11/27/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-143 | DISIS-2017-002 | Wagoner | OK | 12/1/2020 | 227 | 227 | 227 | ER/NR | 0 | 0 | 0 | Wind | Clarksville 345kV Substation | 11/22/2017 | 12/27/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-142 | DISIS-2017-002 | 03 CENTRAL | Jackson | KS | WERE | 12/1/2020 | 170 | 170 | 170 | ER/NR | 0 | 0 | 0 | Wind | Swissvale 345kV Station | 11/22/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-141 | DISIS-2017-002 | 04 SOUTHEAST | Wagoner | OK | AEPW | 12/1/2020 | 241.7 | 241.7 | 241.7 | ER/NR | 0 | 0 | 0 | Solar | Clarksville 345kV Switching Station | 11/22/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-140 | DISIS-2017-002 | 04 SOUTHEAST | Wagoner | OK | AEPW | 12/1/2020 | 160 | 160 | 160 | ER/NR | 0 | 0 | 0 | Solar | Clarksville 345kV Switching Station | 11/22/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-139 | DISIS-2017-002 | Holt | NE | 12/1/2020 | 252 | 252 | 252 | ER/NR | 0 | 0 | 0 | Wind | Grand Prairie-Grand Island (Holt County NE) 345kV Line | 11/22/2017 | 1/25/2019 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-138 | DISIS-2017-002 | Holt | NE | 12/1/2020 | 252 | 252 | 252 | ER/NR | 0 | 0 | 0 | Wind | Grand Prairie-Grand Island (Holt County NE) 345kV Line | 11/22/2017 | 1/25/2019 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-137 | DISIS-2017-002 | 04 SOUTHEAST | Oklahoma | OK | OKGE | 12/1/2020 | 295 | 295 | 295 | ER/NR | 0 | 0 | 0 | Wind | Arcadia 345kV | 11/22/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-136 | DISIS-2017-002 | Oklahoma | OK | 12/1/2020 | 385 | 385 | 385 | ER/NR | 0 | 0 | 0 | Wind | Arcadia 345kV Substation | 11/22/2017 | 12/28/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-135 | DISIS-2017-002 | Oklahoma | OK | 12/1/2020 | 470 | 470 | 470 | ER/NR | 0 | 0 | 0 | Wind | Arcadia 345kV Substation | 11/22/2017 | 12/28/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-134 | DISIS-2017-002 | 04 SOUTHEAST | Oklahoma | OK | OKGE | 12/1/2020 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Wind | Arcadia 345kV | 11/22/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-133 | DISIS-2017-002 | 04 SOUTHEAST | Oklahoma | OK | OKGE | 12/1/2020 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Arcadia 345kV | 11/22/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-132 | DISIS-2017-002 | 04 SOUTHEAST | Oklahoma | OK | OKGE | 12/1/2020 | 400 | 400 | 400 | ER/NR | 0 | 0 | 0 | Wind | Arcadia 345kV | 11/22/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-131 | DISIS-2017-002 | 03 CENTRAL | Wilson | KS | WERE | 12/1/2020 | 29.6 | 29.6 | 29.6 | ER/NR | 0 | 0 | 0 | Battery/Storage | Altoona- NE Parson 138kV | 11/22/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-130 | DISIS-2017-002 | Osage | KS | 12/1/2020 | 215 | 215 | 215 | ER/NR | 0 | 0 | 0 | Wind | Swissvale 345kV Substation | 11/22/2017 | 12/27/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-129 | DISIS-2017-002 | Wagoner | OK | 12/1/2020 | 222 | 222 | 222 | ER/NR | 0 | 0 | 0 | Wind | Clarksville 345kV Substation | 11/21/2017 | 12/27/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-128 | DISIS-2017-002 | 03 CENTRAL | Jackson | KS | WERE | 12/1/2020 | 202 | 202 | 202 | ER/NR | 0 | 0 | 0 | Wind | Swissvale 345kV | 11/20/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-127 | DISIS-2017-002 | Osage | KS | 12/1/2020 | 252 | 252 | 252 | ER/NR | 0 | 0 | 0 | Wind | Hoyt 345kV Substation | 11/20/2017 | 12/27/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-126 | DISIS-2017-002 | Jackson | KS | 12/1/2020 | 252 | 252 | 252 | ER/NR | 0 | 0 | 0 | Wind | Hoyt 345kV Substation | 11/20/2017 | 12/27/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-125 | DISIS-2017-002 | 03 CENTRAL | Osage | KS | WERE | 12/1/2020 | 252 | 252 | 252 | ER/NR | 0 | 0 | 0 | Wind | Swissvale 345kV | 11/20/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-124 | DISIS-2017-002 | Jackson | KS | 12/1/2020 | 252 | 252 | 252 | ER/NR | 0 | 0 | 0 | Wind | Hoyt 345kV Substation | 11/20/2017 | 12/27/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-123 | DISIS-2017-002 | 03 CENTRAL | Leavenworth | KS | WERE | 12/1/2020 | 180 | 180 | 180 | ER/NR | 0 | 0 | 0 | Wind | Stranger Creek 345kV | 11/20/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-122 | DISIS-2017-002 | Wagoner | OK | 12/1/2020 | 234 | 234 | 234 | ER/NR | 0 | 0 | 0 | Wind | Clarksville 345kV Substation | 11/20/2017 | 12/27/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-121 | DISIS-2017-002 | 03 CENTRAL | Sumner | KS | WERE | 12/1/2021 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Sumner 138kV | 11/17/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-120 | DISIS-2017-002 | 03 CENTRAL | Dickinson/Marion | KS | WERE | 5/1/2027 | 260 | 260 | 260 | ER/NR | 0 | 0 | 0 | Wind | Abilene Energy Center-Northview 115kV | 11/17/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-119 | DISIS-2017-002 | 03 CENTRAL | Cloud/Mitchell | KS | SUNC | 5/1/2024 | 260 | 260 | 260 | ER/NR | 0 | 0 | 0 | Wind | Elm Creek 345kV substation | 11/17/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-118 | DISIS-2017-002 | 03 CENTRAL | Cloud/Mitchell | KS | SUNC | 5/1/2024 | 130 | 130 | 130 | ER/NR | 0 | 0 | 0 | Wind | Elm Creek 345kV substation | 11/17/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-117 | DISIS-2017-002 | 04 SOUTHEAST | Canadian | OK | WFEC | 12/1/2020 | 19.8 | 19.8 | 19.8 | ER/NR | 0 | 0 | 0 | Battery/Storage | El Reno SW 138kV | 11/17/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-116 | DISIS-2017-002 | 05 SOUTHWEST | Curry/Roosevelt | NM | SWPS | 12/1/2021 | 192.5 | 192.5 | 192.5 | ER/NR | 0 | 0 | 0 | Solar | Oasis - Pleasant Hill 230kV | 11/17/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-115 | DISIS-2017-002 | 03 CENTRAL | Atchinson/Nodaway | MO | KCPL | 5/1/2027 | 244 | 244 | 244 | ER/NR | 0 | 0 | 0 | Wind | Holt County 345 kV | 11/10/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-114 | DISIS-2017-002 | 01 NORTH | Dewey | SD | BEPC | 12/31/2021 | 450 | 450 | 450 | ER | 0 | 0 | 0 | Wind | Chappelle Creek - Leland Olds 345kV | 10/23/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-113 | DISIS-2017-002 | 01 NORTH | Bennett | SD | WAPA | 12/31/2021 | 119 | 119 | 119 | ER | 0 | 0 | 0 | Wind | Martin 115kV | 10/23/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-112 | DISIS-2017-002 | 03 CENTRAL | Bates | MO | KCPL | 5/1/2027 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Tap Clinton - Stilwell 161kV | 11/27/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-111 | DISIS-2017-002 | 03 CENTRAL | Bates | MO | KCPL | 9/1/2023 | 152 | 152 | 152 | ER/NR | 0 | 0 | 0 | Solar | Tap Clinton - Stilwell 161kV | 11/27/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-110 | DISIS-2017-002 | Grant | KS | SUNC | 12/31/2020 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Solar | Pioneer Sub 115kV | 11/15/2017 | 11/5/2019 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-109 | DISIS-2017-002 | 01 NORTH | Dawson County | MT | WAPA | 12/31/2020 | 320.9 | 320.9 | 320.9 | ER/NR | 0 | 0 | 0 | Wind | Dawson Co - Ft Peck 230 kV | 8/30/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-108 | DISIS-2017-002 | 03 CENTRAL | Henry County | MO | KCPL | 12/1/2022 | 400 | 400 | 400 | ER/NR | 0 | 0 | 0 | Solar | Stillwell - Clinton 161kV Line | 8/26/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-107 | DISIS-2017-002 | 05 SOUTHWEST | Potter County | TX | SWPS | 4/30/2020 | 4/30/2020 | 40 | 40 | 40 | ER | 0 | 0 | 0 | Solar | Highland Park - Asarco 115 kV Line | 8/7/2017 | DISIS STAGE | N/A | ||||||||||
| GEN-2017-106 | DISIS-2017-002 | 05 SOUTHWEST | Randall County | TX | SWPS | 4/30/2020 | 4/30/2020 | 40 | 40 | 40 | ER | 0 | 0 | 0 | Solar | Canyon West - Dawn 115 kV | 8/7/2017 | DISIS STAGE | N/A | ||||||||||
| GEN-2017-105 | DISIS-2017-002 | 02 NEBRASKA | Burt County | NE | OPPD | 12/15/2018 | 75 | 75 | 75 | ER/NR | 0 | 0 | 0 | Wind | Tekamah - Raun 161 kV Line | 7/12/2017 | DISIS STAGE | N/A | |||||||||||
| GEN-2017-104 | DISIS-2017-001 | Lea County | NM | SWPS | 12/15/2019 | 240 | 240 | 240 | ER/NR | 0 | 0 | 0 | Solar | Hobbs 230kV Substation | 6/19/2017 | 6/7/2021 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-103 | DISIS-2017-002 | Chippewa County | MN | WAPA | 10/1/2018 | 8 | 8 | 8 | ER | 0 | 0 | 0 | Solar | Granite Falls 230kV Substation | 5/20/2017 | 2/8/2018 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-102 | DISIS-2017-002 | 05 SOUTHWEST | Roosevelt County | NM | SWPS | 4/30/2020 | 4/30/2020 | 67.5 | 67.5 | 67.5 | ER | 0 | 0 | 0 | Solar | Crossroads 345kV | 4/30/2020 | DISIS STAGE | N/A | ||||||||||
| GEN-2017-101 | DISIS-2017-002 | 04 SOUTHEAST | Hardeman County | TX | AEPW | 4/30/2020 | 4/30/2020 | 67.5 | 67.5 | 67.5 | ER | 0 | 0 | 0 | Solar | Russell - Lake Pauline 138 kV Line | 7/10/2017 | DISIS STAGE | N/A | ||||||||||
| GEN-2017-100 | IFS-2017-001-20 | DISIS-2017-001 | 05 SOUTHWEST | Texas County | OK | SWPS | 12/31/2019 | 12/31/2021 | 102.6 | 102.6 | 102.6 | ER/NR | 0 | 0 | 0 | Solar | Texas County 115kV | 5/31/2017 | FACILITY STUDY STAGE | N/A | |||||||||
| GEN-2017-099 | IFS-2017-001-09 | DISIS-2017-001 | 03 CENTRAL | Edwards County | KS | SUNC | 11/1/2021 | 11/1/2023 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Wind | Post Rock - Spearville 345 kV | 5/31/2017 | FACILITY STUDY STAGE | N/A | |||||||||
| GEN-2017-098 | Meade County | SD | WAPA | 12/15/2020 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Maurine 230 kV sub | 5/26/2017 | 3/21/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-097 | IFS-2017-001-24 | DISIS-2017-001 | 01 NORTH | Pennington County | SD | WAPA | 1/9/2022 | 12/1/2022 | 128 | 128 | 128 | ER | 0 | 0 | 0 | Solar | Underwood 115 kV Sub | 5/31/2017 | FACILITY STUDY STAGE | N/A | |||||||||
| GEN-2017-096 | Pennington County | SD | WAPA | 12/31/2020 | 25 | 25 | 25 | ER/NR | 0 | 0 | 0 | Solar | New Underwood Substation 115 kV | 5/30/2017 | 12/14/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-095 | DISIS-2017-001 | Ford County | KS | KCPL | 12/1/2020 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Eastown - Iatan 345kV | 5/31/2017 | 12/4/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-094 | IFS-2017-001-31 | DISIS-2017-001 | 01 NORTH | Wessington/Hand Counties | SD | WAPA | 10/6/2020 | 10/1/2022 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Fort Thompson-Huron 230 kV | 5/24/2017 | FACILITY STUDY STAGE | N/A | |||||||||
| GEN-2017-093 | Lea County | NM | SWPS | 9/30/2019 | 99 | 99 | 99 | ER/NR | 0 | 0 | 0 | Solar | Whitten - Ochoe 115 kV | 5/24/2017 | 6/27/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-092 | IFS-2017-001-04 | DISIS-2017-001 | 04 SOUTHEAST | Muskogee County | OK | OKGE | 6/1/2023 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Solar | Canadian River-Muskogee and Muskogee-Seminole 345kV | 5/30/2017 | FACILITY STUDY STAGE | N/A | ||||||||||
| GEN-2017-091 | DISIS-2017-001 | Lamb County | TX | SWPS | 3/30/2023 | 26.3 | 26.3 | 26.3 | ER | 0 | 0 | 0 | Solar | Lamton 115kV | 5/29/2017 | 11/27/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-090 | IFS-2017-001-35 | DISIS-2017-001 | 03 CENTRAL | Bates County | MO | KCPL | 12/1/2019 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Solar | Adrian 161 kV sub | 5/31/2017 | FACILITY STUDY STAGE | N/A | ||||||||||
| GEN-2017-089 | Texas County | OK | SWPS | 12/31/2021 | 102 | 102 | 102 | ER/NR | 0 | 0 | 0 | Solar | Tap Goodwell Sub 115 kV | 5/30/2017 | 11/14/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-088 | DISIS-2017-001 | Bowie County | TX | AEP | 2/15/2020 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Solar | Valiant-Lydia 345kV | 5/26/2017 | 1/8/2019 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-087 | DISIS-2017-001 | Curry County | NM | SWPS | 12/31/2020 | 128 | 128 | 128 | ER | 0 | 0 | 0 | Solar | Clovis Interchange 115 kV | 5/31/2017 | 5/14/2021 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-086 | IFS-2017-001-10 | DISIS-2017-001 | 03 CENTRAL | Harper County | KS | WERE | 12/1/2021 | 11/1/2023 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | Viola 345kV | 5/25/2017 | FACILITY STUDY STAGE | N/A | |||||||||
| GEN-2017-085 | IFS-2017-001-30 | DISIS-2017-001 | 02 NEBRASKA | Saline County | NE | NPPD | 12/31/2019 | 6/30/2023 | 0.6 | 0.6 | 0.6 | ER/NR | 0 | 0 | 0 | Wind | Friend 115kV | 5/10/2017 | FACILITY STUDY STAGE | N/A | |||||||||
| GEN-2017-084 | DISIS-2017-001 | Castro County | TX | SWPS | 3/30/2023 | 89.3 | 89.3 | 89.3 | ER | 0 | 0 | 0 | Solar | Newhart-Swisher 230kV | 5/31/2017 | 11/27/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-083 | DISIS-2017-001 | Thomas County | KS | SUNC | 12/1/2019 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Wind | Mingo 115kV | 5/19/2017 | 12/4/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-082 | IFS-2017-001-02 | DISIS-2017-001 | 03 CENTRAL | Barton/Jasper Counties | MO | EDE | 7/1/2020 | 12/31/2020 | 149.4 | 149.4 | 149.4 | ER | 0 | 0 | 0 | Wind | Asbury Plant 161 kV | 5/31/2017 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2017-081 | DISIS-2017-001 | Randall County | TX | SWPS | 12/30/2019 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Solar | Amarillo South-Swisher 230kV | 5/29/2017 | 12/7/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-080 | DISIS-2017-001 | Lamb County | TX | SWPS | 12/31/2020 | 525 | 525 | 525 | ER | 0 | 0 | 0 | Solar | Tolk 230 kV substation | 5/29/2017 | 5/12/2021 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-079 | DISIS-2017-001 | Castro County | TX | SWPS | 3/30/2023 | 49.875 | 49.875 | 49.875 | ER | 0 | 0 | 0 | Solar | Hart Industrial 115kV sub | 5/29/2017 | 11/27/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-078 | DISIS-2017-001 | Roosevelt County | NM | SWPS | 12/1/2020 | 220 | 220 | 220 | ER/NR | 0 | 0 | 0 | Wind | Eddy County-Tolk (Crossroads) 345kV | 5/30/2017 | 5/14/2021 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-077 | IFS-2017-001-18 | DISIS-2017-001 | 04 SOUTHEAST | Mayes County | OK | AEPW | 12/1/2021 | 6/1/2023 | 124.7 | 124.7 | 124.7 | ER | 0 | 0 | 0 | Solar | Explorer Claremore Tap EXCLART4 | 5/28/2017 | FACILITY STUDY STAGE | N/A | |||||||||
| GEN-2017-076 | IFS-2017-001-17 | DISIS-2017-001 | 04 SOUTHEAST | Benton County | AR | AEPW | 12/1/2021 | 12/1/2024 | 52.2 | 52.2 | 52.2 | ER | 0 | 0 | 0 | Solar | Chamber Springs 161kV sub | 5/28/2017 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2017-075 | IFS-2017-001-16 | DISIS-2017-001 | 04 SOUTHEAST | Johnston County | OK | OKGE | 12/1/2021 | 12/1/2022 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Solar | Hugo-Sunnyside 345 kV | 5/28/2017 | IA PENDING | N/A | |||||||||
| GEN-2017-074 | IFS-2017-001-15 | DISIS-2017-001 | 04 SOUTHEAST | Mayes County | OK | AEPW | 12/1/2021 | 6/1/2023 | 72.5 | 72.5 | 72.5 | ER | 0 | 0 | 0 | Solar | Pryor Junction 138kV sub | 5/28/2017 | FACILITY STUDY STAGE | N/A | |||||||||
| GEN-2017-073 | IFS-2017-001-14 | DISIS-2017-001 | 04 SOUTHEAST | Mayes County | OK | GRDA | 12/1/2021 | 12/1/2022 | 72.5 | 72.5 | 72.5 | ER | 0 | 0 | 0 | Solar | Dry Gulch 161kV sub | 5/28/2017 | FACILITY STUDY STAGE | N/A | |||||||||
| GEN-2017-072 | IFS-2017-001-37 | DISIS-2017-001 | 04 SOUTHEAST | Payne County | OK | OKGE | 12/1/2021 | 12/1/2022 | 52.2 | 52.2 | 52.2 | ER | 0 | 0 | 0 | Solar | Greenwood 138kV sub | 5/28/2017 | IA PENDING | N/A | |||||||||
| GEN-2017-071 | IFS-2017-001-36 | DISIS-2017-001 | 04 SOUTHEAST | Payne County | OK | OKGE | 12/1/2021 | 12/1/2022 | 124.7 | 124.7 | 124.7 | ER | 0 | 0 | 0 | Solar | Greenwood 138kV sub | 5/28/2017 | IA PENDING | N/A | |||||||||
| GEN-2017-070 | Caddo Parish | LA | AEPW | 12/1/2019 | 52.2 | 52.2 | 52.2 | ER/NR | 0 | 0 | 0 | Solar | Port Robson 138kV sub | 5/28/2017 | 1/18/2019 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-069 | DISIS-2017-001 | Quay County | NM | SWPS | 12/1/2023 | 1.8 | 1.8 | 1.8 | ER/NR | 0 | 0 | 0 | Solar | Norton 115 kV Switching Station | 5/16/2017 | 5/15/2021 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-068 | IFS-2017-001-26 | DISIS-2017-001 | 03 CENTRAL | Sumner County | KS | WERE | 12/31/2020 | 12/31/2023 | 103.5 | 103.5 | 103.5 | ER/NR | 0 | 0 | 0 | Solar | Gordon Evans 138kV Substation | 5/30/2017 | FACILITY STUDY STAGE | N/A | |||||||||
| GEN-2017-067 | DISIS-2017-001 | Caddo County | OK | OKGE | 12/31/2020 | 200.25 | 200.25 | 200.25 | ER/NR | 0 | 0 | 0 | Solar | Minco 345kV substation | 5/30/2017 | 12/7/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-066 | DISIS-2017-001 | Caddo County | OK | WFEC | 12/31/2020 | 150.8 | 150.8 | 150.8 | ER/NR | 0 | 0 | 0 | Solar | Oney 138 kv Sub | 5/30/2017 | 12/7/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-065 | DISIS-2017-001 | Wilbarger County | TX | AEPW | 12/31/2020 | 200.25 | 200.25 | 200.25 | ER/NR | 0 | 0 | 0 | Solar | Oklaunion 345 kV sub | 5/30/2017 | 5/14/2021 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-064 | IFS-2017-001-40 | DISIS-2017-001 | Oglala and Custer Counties | SD | WAPA | 12/31/2023 | 110 | 110 | 110 | ER/NR | 0 | 0 | 0 | Solar | Underwood - Wayside 230 kV | 5/8/2017 | 11/29/2021 | WITHDRAWN | N/A | ||||||||||
| GEN-2017-063 | DISIS-2017-001 | Rush County | KS | ITCGP | 12/1/2019 | 202.1 | 202.1 | 202.1 | ER | 0 | 0 | 0 | Wind | Post Rock - Spearville 345 kV | 5/31/2017 | 10/9/2019 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-062 | Beaver County | OK | AEPW | 12/31/2022 | 488 | 488 | 488 | ER/NR | 0 | 0 | 0 | Thermal | Tap 765kV line between proposed Twin Counties to Tulsa North substation | 5/31/2017 | 10/1/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-061 | IFS-2017-001-25 | DISIS-2017-001 | 04 SOUTHEAST | Mayes County | OK | GRDA | 12/1/2021 | 6/1/2023 | 101.5 | 101.5 | 101.5 | ER/NR | 0 | 0 | 0 | Solar | GRDA1 to CLARMR 5 161kV line | 5/28/2017 | FACILITY STUDY STAGE | N/A | |||||||||
| GEN-2017-060 | IFS-2017-001-01 | DISIS-2017-001 | 03 CENTRAL | Barton County | MO | EDE | 9/1/2020 | 4/21/2021 | 149.4 | 149.4 | 149.4 | ER | 0 | 0 | 0 | Wind | LaRussell Energy Center 161kV | 5/30/2017 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2017-059 | DISIS-2017-001 | Hale County | TX | SWPS | 12/31/2019 | 90 | 90 | 90 | ER/NR | 0 | 0 | 0 | Solar | TUCO 230kV | 5/31/2017 | 5/15/2021 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-058 | DISIS-2017-001 | Deaf Smith County | TX | SWPS | 12/31/2019 | 135 | 135 | 135 | ER | 0 | 0 | 0 | Solar | Hereford Northeast 115kV substation | 5/29/2017 | 4/23/2021 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-057 | IFS-2017-001-13 | DISIS-2017-001 | 04 SOUTHEAST | Caddo Parish | LA | AEPW | 12/1/2021 | 12/1/2024 | 72.5 | 72.5 | 72.5 | ER | 0 | 0 | 0 | Solar | Hosston 69kV | 5/30/2017 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2017-056 | Morton County | ND | WAPA | 12/31/2020 | 210 | 210 | 210 | ER/NR | 0 | 0 | 0 | Wind | Antelope Valley - Huron 345 kV Line | 5/30/2017 | 11/1/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-055 | DISIS-2017-001 | Lancaster County | NE | LES | 12/1/2021 | 4/1/2023 | 228.25 | 228.25 | 228.25 | ER/NR | 0 | 0 | 0 | Solar | Wagener 115 kV Sub | 5/28/2017 | 6/14/2021 | WITHDRAWN | N/A | ||||||||||
| GEN-2017-054 | Lincoln County | SD | WAPA | 12/1/2019 | 102 | 102 | 102 | ER/NR | 0 | 0 | 0 | Solar | Virgil Fodness 230 kV Sub | 5/30/2017 | 1/12/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-053 | DISIS-2017-001 | Cotton County | OK | WFEC | 1/7/2019 | 50 | 50 | 50 | ER | 0 | 0 | 0 | Solar | Tap Hollister SW - PSO Walters 69 kV | 5/4/2017 | 12/4/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-052 | DISIS-2017-001 | Stanton County | KS | SUNC | 1/7/2019 | 25 | 25 | 25 | ER | 0 | 0 | 0 | Solar | Tap Bear Creek-Johnson Corner 115 kV | 5/4/2017 | 5/11/2021 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-051 | DISIS-2017-001 | Greer County | OK | WFEC | 1/7/2019 | 30 | 30 | 30 | ER | 0 | 0 | 0 | Solar | Tap Lake Creek SW - Russell SW 69 kV | 5/4/2017 | 5/11/2021 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-050 | DISIS-2017-001 | Crawford County | KS | WERE | 1/7/2019 | 25 | 25 | 25 | ER | 0 | 0 | 0 | Solar | Tap Neosho – Crawford 69 kV | 5/4/2017 | 12/4/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-049 | DISIS-2017-001 | Hodgeman County | KS | MIDW | 1/7/2019 | 50 | 50 | 50 | ER | 0 | 0 | 0 | Solar | Tap Pawnee Valley - Hanston 69kV | 5/4/2017 | 12/4/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-048 | IFS-2017-001-34 | DISIS-2017-001 | 01 NORTH | Williams County | ND | BEPC | 8/30/2024 | 9/30/2024 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | Neset 230 kV Substation | 5/31/2017 | IA PENDING | N/A | |||||||||
| GEN-2017-047 | IFS-2017-001-19 | DISIS-2017-001 | 05 SOUTHWEST | Beaver County | OK | SWPS | 12/31/2019 | 12/31/2023 | 102 | 102 | 102 | ER/NR | 0 | 0 | 0 | Wind | Cole 115kV | 5/18/2017 | FACILITY STUDY STAGE | N/A | |||||||||
| GEN-2017-046 | Ochiltree County | TX | SWPS | 6/1/2020 | 200.1 | 200.1 | 200.1 | ER | 0 | 0 | 0 | Wind | Canadian River-Muskogee and Muskogee-Seminole 345kV | 5/30/2017 | 10/11/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-045 | Ochiltree County | TX | SWPS | 6/1/2020 | 200.1 | 200.1 | 200.1 | ER | 0 | 0 | 0 | Wind | Canadian River-Muskogee and Muskogee-Seminole 345kV | 5/30/2017 | 10/11/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-044 | Ochiltree County | TX | SWPS | 6/1/2020 | 200.1 | 200.1 | 200.1 | ER | 0 | 0 | 0 | Wind | Canadian River-Muskogee and Muskogee-Seminole 345kV | 5/30/2017 | 10/11/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-043 | Bryan County | OK | OKGE | 12/31/2021 | 1550 | 1550 | 1550 | ER/NR | 0 | 0 | 0 | Thermal | CT | Tap Sunnyside-Hugo 345 kV Line | 5/26/2017 | 6/11/2018 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-042 | Bryan County | OK | OKGE | 12/31/2021 | 1100 | 1100 | 1100 | ER/NR | 0 | 0 | 0 | Thermal | CC | Tap Sunnyside-Hugo 345 kV Line | 5/26/2017 | 1/28/2018 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-041 | DISIS-2017-001 | Ford County | KS | KCPL | 12/1/2020 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Eastown - Iatan 345kV | 5/31/2017 | 12/4/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-040 | IFS-2017-001-03 | DISIS-2017-001 | 04 SOUTHEAST | Ochiltree County | TX | OKGE | 6/1/2020 | 6/1/2023 | 200.1 | 200.1 | 200.1 | ER | 0 | 0 | 0 | Solar | Canadian River-Muskogee and Muskogee-Seminole 345kV | 5/31/2017 | IA PENDING | N/A | |||||||||
| GEN-2017-039 | DISIS-2017-001 | Bailey County | TX | SWPS | 9/30/2021 | 9/30/2021 | 200.1 | 200.1 | 200.1 | ER | 0 | 0 | 0 | Wind | Needmore 230 kV sub | 5/30/2017 | 4/23/2021 | WITHDRAWN | N/A | ||||||||||
| GEN-2017-038 | DISIS-2017-001 | Ford County | KS | KCPL | 12/1/2020 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Eastown - Iatan 345kV | 5/31/2017 | 12/4/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-037 | DISIS-2017-001 | Scott Bluff County | NE | NPPD | 12/31/2018 | 20 | 20 | 20 | ER | 0 | 0 | 0 | Solar | Bobcat 115kV | 5/25/2017 | 9/10/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-036 | IFS-2017-001-23 | DISIS-2017-001 | 04 SOUTHEAST | Kiowa County | OK | AEPW | 12/1/2022 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Solar | Snyder - Cache 138 kV | 5/31/2017 | IA PENDING | N/A | ||||||||||
| GEN-2017-035 | DISIS-2017-001 | Ellsworth County | KS | SUNC | 12/1/2019 | 85 | 85 | 85 | ER/NR | 0 | 0 | 0 | Wind | Ellsworth - Bushton 115 kV | 5/31/2017 | 4/16/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-034 | Ellsworth County | KS | MIDW | 12/1/2019 | 25 | 25 | 25 | ER/NR | 0 | 0 | 0 | Wind | Ellsworth - Bushton 115 kV | 5/31/2017 | 11/1/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-033 | IFS-2017-001-28 | DISIS-2017-001 | 05 SOUTHWEST | Wilbarger County | TX | AEPW | 12/31/2020 | 12/31/2023 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Oklaunion 345 kV sub | 5/31/2017 | IA PENDING | N/A | |||||||||
| GEN-2017-032 | IFS-2017-001-38 | DISIS-2017-001 | 03 CENTRAL | Kiowa County | CO | SWPS | 12/1/2019 | 11/1/2023 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Finney - Lamar 345 kV | 5/31/2017 | FACILITY STUDY STAGE | N/A | |||||||||
| GEN-2017-031 | DISIS-2017-001 | Garden County | NE | NPPD | 9/30/2021 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | Wildhorse - Covalt 115 kV | 5/30/2017 | 6/7/2021 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-030 | DISIS-2017-001 | Ford County | KS | KCPL | 12/1/2020 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Eastown - Iatan 345kV | 5/31/2017 | 5/14/2021 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-029 | Deaf Smith County | TX | SWPS | 12/31/2020 | 270 | 270 | 270 | ER/NR | 0 | 0 | 0 | Wind | Deaf Smith - Bushland 230 kV or Potter County - Newhart 230 kV | 5/31/2017 | 11/1/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-028 | DISIS-2017-001 | Canadian County | OK | WFEC | 12/1/2019 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Solar | El Reno SW 138kV Switching Station | 5/31/2017 | 5/14/2021 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-027 | IFS-2017-001-33 | DISIS-2017-001 | 04 SOUTHEAST | Carter County | OK | OKGE | 11/1/2021 | 12/21/2021 | 140 | 140 | 140 | ER | 0 | 0 | 0 | Wind | Pooleville-Ratliff (Carter County) 138kV | 5/31/2017 | IA PENDING | N/A | |||||||||
| GEN-2017-026 | DISIS-2017-001 | Palmer County | TX | SWPS | 12/31/2020 | 235 | 235 | 235 | ER/NR | 0 | 0 | 0 | Wind | Tolk 230kV | 5/31/2017 | 5/14/2021 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-025 | DISIS-2017-001 | Emmitt County | IA | CBPC | 12/1/2020 | 74 | 74 | 74 | ER | 0 | 0 | 0 | Wind | Superior 69 kV sub | 5/31/2017 | 7/3/2019 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-024 | DISIS-2017-001 | Choctaw County | OK | WFEC | 12/1/2019 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Solar | Frogville 138 kV sub | 5/31/2017 | 5/14/2021 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-023 | IFS-2017-001-22 | DISIS-2017-001 | 04 SOUTHEAST | Choctaw County | OK | WFEC | 12/1/2019 | 85 | 85 | 85 | ER/NR | 0 | 0 | 0 | Solar | Hugo Power Plant 138 kV Sub | 5/31/2017 | FACILITY STUDY STAGE | N/A | ||||||||||
| GEN-2017-022 | IFS-2017-001-21 | DISIS-2017-001 | 03 CENTRAL | Wilson County | KS | WERE | 12/1/2019 | 65 | 65 | 65 | ER/NR | 0 | 0 | 0 | Solar | Altoona- NE Parson 138kV | 5/31/2017 | FACILITY STUDY STAGE | N/A | ||||||||||
| GEN-2017-021 | IFS-2017-001-08 | DISIS-2017-001 | 03 CENTRAL | Edwards County | KS | SUNC | 11/1/2022 | 11/1/2023 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Post Rock - Spearville 345 kV | 5/30/2017 | FACILITY STUDY STAGE | N/A | |||||||||
| GEN-2017-020 | DISIS-2017-001 | Perkins County | SD | WAPA | 12/1/2020 | 250 | 250 | 250 | ER | 0 | 0 | 0 | Wind | Maurine 230 kV sub | 5/31/2017 | 4/16/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-019 | Haakon County | SD | WAPA | 9/1/2019 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Wind | Philip Tap 230 kV | 5/31/2017 | 10/10/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-018 | IFS-2017-001-27 | DISIS-2017-001 | 03 CENTRAL | Barber County | KS | SUNC | 12/31/2020 | 12/31/2023 | 189 | 189 | 189 | ER/NR | 0 | 0 | 0 | Solar | Thistle 345 kV sub | 5/30/2017 | FACILITY STUDY STAGE | N/A | |||||||||
| GEN-2017-017 | DISIS-2017-001 | Thomas County | KS | SUNC | 12/31/2020 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Mingo-Setab 345kV | 5/30/2017 | 4/16/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-016 | DISIS-2017-001 | Quay County | NM | SWPS | 10/7/2023 | 12/1/2023 | 33 | 33 | 33 | ER/NR | 0 | 0 | 0 | Solar | Norton 115 kV Switching Station | 5/30/2017 | 5/15/2021 | WITHDRAWN | N/A | ||||||||||
| GEN-2017-015 | DISIS-2017-001 | Johnson County | OK | OKGE | 12/31/2019 | 190 | 190 | 190 | ER | 0 | 0 | 0 | Wind | Mill Creek 138kV | 4/14/2017 | 4/17/2018 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-014 | IFS-2017-001-29 | DISIS-2017-001 | 01 NORTH | Haakon County | SD | WAPA | 12/1/2020 | 12/31/2024 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Wind | Philip Tap 230 kV | 5/22/2017 | FACILITY STUDY STAGE | N/A | |||||||||
| GEN-2017-013 | IFS-2017-001-07 | DISIS-2017-001 | 03 CENTRAL | Thomas County | KS | SUNC | 12/1/2019 | 11/1/2023 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Mingo 345kV | 5/22/2017 | 11/8/2021 | WITHDRAWN | N/A | ||||||||
| GEN-2017-012 | DISIS-2017-001 | Castro County | TX | SWPS | 12/15/2021 | 201.6 | 201.6 | 201.6 | ER/NR | 0 | 0 | 0 | Wind | Newhart-Potter County 230 kV | 5/12/2017 | 12/7/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-011 | IFS-2017-001-06 | DISIS-2017-001 | 04 SOUTHEAST | Ellis County | OK | OKGE | 12/31/2019 | 12/31/2022 | 151.8 | 151.8 | 151.8 | ER | 0 | 0 | 0 | Solar | Badger-Woodward EHV Dbl Ckt 345kV | 5/17/2017 | IA PENDING | N/A | |||||||||
| GEN-2017-010 | IFS-2017-001-12 | DISIS-2017-001 | 01 NORTH | Bowman County | ND | BEPC | 10/31/2022 | 200.1 | 200.1 | 200.1 | ER | 0 | 0 | 0 | Wind | Rhame 230 kV Sub | 4/14/2017 | IA PENDING | N/A | ||||||||||
| GEN-2017-009 | IFS-2017-001-39 | DISIS-2017-001 | 03 CENTRAL | Neoshoe County | KS | WERE | 10/31/2020 | 10/31/2020 | 302 | 302 | 302 | ER | 0 | 0 | 0 | Wind | Neosho - Caney River 345 kV | 4/14/2017 | IA PENDING | N/A | |||||||||
| GEN-2017-008 | DISIS-2017-001 | Nuckolls County | NE | NPPD | 12/31/2019 | 305 | 305 | 305 | ER | 0 | 0 | 0 | Solar | Pauline 345kV Substation | 4/14/2017 | 6/7/2021 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-007 | DISIS-2017-001 | Curray and Quay Counties | NM | SWPS | 10/20/2020 | 297.5 | 297.5 | 297.5 | ER | 0 | 0 | 0 | Wind | Pleasant Hill 230 kV sub | 4/14/2017 | 6/7/2021 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-006 | DISIS-2017-001 | Fillmore and Saline Counties | NE | NPPD | 10/31/2022 | 73.6 | 73.6 | 73.6 | ER | 0 | 0 | 0 | Wind | Tobias 345kV Substation | 4/14/2017 | 11/4/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2017-005 | IFS-2017-001-11 | DISIS-2017-001 | 03 CENTRAL | Bourbon and Crawford Counties | OK | WERE | 12/31/2020 | 12/13/2021 | 190 | 190 | 190 | ER | 0 | 0 | 0 | Wind | Marmaton - Litchfield 161 kV | 4/14/2017 | IA PENDING | N/A | Interim IGIA effective 3/3/2021 - AB | ||||||||
| GEN-2017-004 | IFS-2017-001-05 | DISIS-2017-001 | 03 CENTRAL | Cloud County | KS | ITCGP | 12/31/2021 | 12/31/2023 | 201.6 | 201.6 | 201.6 | ER | 0 | 0 | 0 | Wind | Elm Creek - Summit 345 kV | 4/14/2017 | FACILITY STUDY STAGE | N/A | |||||||||
| GEN-2017-003 | Little River | AR | AEPW | 12/31/2018 | 21.6 | 21.6 | 21.6 | ER/NR | 0 | 0 | 0 | Solar | Tap Nekoosa Tap-Ashdown 69 kV | 1/31/2017 | 11/14/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-002 | Sebastian County | AR | AEP | 12/31/2018 | 21.6 | 21.6 | 21.6 | ER/NR | 0 | 0 | 0 | Solar | Huntington 69 kV sub | 1/31/2017 | 11/14/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2017-001 | DISIS-2017-001 | Custer | NE | NPPD | 12/31/2023 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Wind | Sweetwater 345kV | 12/30/2016 | 12/7/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-177 | IFS-2016-002-60 | DISIS-2016-002-1 | 05 SOUTHWEST | Gaines | TX | SWPS | 7/28/2021 | 17 | 14.4 | 17 | ER | 0 | 0 | 0 | Thermal | Gas Turbine | XTO-Cornell 115 kV station | 1/23/2017 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2016-176 | IFS-2016-002-67 | DISIS-2016-002-1 | 03 CENTRAL | Nemaha County | KS | WERE | 12/31/2019 | 12/6/2021 | 302 | 302 | 302 | ER | 0 | 0 | 0 | Wind | Stranger Creek 345kV | 12/15/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2016-175 | DISIS-2017-001 | Crosby | TX | SWPS | 6/1/2020 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Wind | Border-TUCO 345kV | 11/30/2016 | 4/16/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-174 | IFS-2016-002-19 | DISIS-2016-002-1 | 03 CENTRAL | Nemaha | KS | WERE | 9/15/2019 | 11/18/2020 | 302 | 302 | 302 | ER | 0 | 0 | 0 | Wind | Stranger Creek 345kV | 11/30/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2016-173 | DISIS-2017-001 | Gouda Springs | KS | WERE | 9/15/2019 | 42 | 42 | 42 | ER/NR | 0 | 0 | 0 | Solar | Creswell 69 kV Sub | 11/28/2016 | 11/18/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-172 | IFS-2016-002-23 | DISIS-2017-001 | Castro County | TX | SWPS | 12/31/2018 | 231 | 231 | 231 | ER | 0 | 0 | 0 | Wind | Newhart 115kV | 11/23/2016 | 5/14/2021 | WITHDRAWN | N/A | ||||||||||
| GEN-2016-171 | IFS-2016-002-64 | DISIS-2017-001 | Lea | NM | SWPS | 12/20/2020 | 64 | 60.8 | 64 | ER | 0 | 0 | 0 | Solar | Hobbs-Yoakum 230kV | 11/30/2016 | 10/23/2020 | WITHDRAWN | N/A | ||||||||||
| GEN-2016-170 | Nemaha | KS | WERE | 12/15/2019 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Wind | Kelly 115 kV Substation | 11/21/2016 | 4/6/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-169 | Hobbs County | NM | SWPS | 12/29/2018 | 260 | 260 | 260 | ER/NR | 0 | 0 | 0 | Solar | Hobbs 345kV | 11/30/2016 | 8/13/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-168 | Higginsville County | MO | KCPL | 9/15/2019 | 20 | 20 | 20 | ER/NR | 0 | 0 | 0 | Solar | Higginsville 69 kV Sub | 11/30/2016 | 7/26/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-167 | IFS-2016-002-02 | DISIS-2016-002-1 | 04 SOUTHEAST | Caddo Parish | LA | AEPW | 9/1/2023 | 12/1/2023 | 73.5 | 73.5 | 73.5 | ER/NR | 0 | 0 | 0 | Solar | Lieberman - North Benton 138 kV Line | 11/29/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-166 | IFS-2016-002-03 | DISIS-2016-002-1 | Washington | AR | AEPW | 12/1/2019 | 35 | 35 | 35 | ER/NR | 0 | 0 | 0 | Solar | Prairie Grove 69 kV Substation | 11/29/2016 | 2/21/2020 | WITHDRAWN | N/A | ||||||||||
| GEN-2016-165 | IFS-2016-002-39 | DISIS-2016-002-1 | Knox | NE | WAPA | 12/31/2019 | 202 | 202 | 202 | ER | 0 | 0 | 0 | Wind | Grand Prairie 345 kV | 11/30/2016 | 9/5/2019 | WITHDRAWN | N/A | ||||||||||
| GEN-2016-164 | IFS-2016-002-35 | DISIS-2016-002-1 | Day | SD | WAPA | 12/31/2017 | 7.9 | 7.9 | 7.9 | ER | 0 | 0 | 0 | Wind | Groton 115 kV substation | 11/30/2016 | 3/5/2020 | WITHDRAWN | N/A | ||||||||||
| GEN-2016-163 | IFS-2016-002-34 | DISIS-2016-002-1 | 03 CENTRAL | Harvey | KS | WERE | 9/15/2019 | 7/1/2024 | 252 | 252 | 252 | ER | 0 | 0 | 0 | Wind | Benton 345kV | 11/30/2016 | IA FULLY EXECUTED/ON SUSPENSION | N/A | |||||||||
| GEN-2016-162 | IFS-2016-002-38 | DISIS-2016-002-1 | 03 CENTRAL | Marion | KS | WERE | 9/15/2019 | 7/1/2024 | 252 | 252 | 252 | ER | 0 | 0 | 0 | Wind | Benton 345kV | 11/30/2016 | IA FULLY EXECUTED/ON SUSPENSION | N/A | |||||||||
| GEN-2016-161 | IFS-2016-002-66 | DISIS-2016-002-1 | Carson | TX | SWPS | 12/31/2017 | 3 | 3 | 3 | ER | 0 | 0 | 0 | Wind | Martin 115kV | 11/30/2016 | 4/15/2021 | WITHDRAWN | N/A | ||||||||||
| GEN-2016-160 | IFS-2016-002-04 | DISIS-2016-002-1 | 03 CENTRAL | Ellis | KS | MIDW | 10/2/2023 | 12/31/2023 | 20 | 20 | 20 | ER/NR | 0 | 0 | 0 | Battery/Storage | Post Rock 230kV | 11/21/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-159 | DISIS-2017-001 | Stanton | NE | NPPD | 11/1/2020 | 427.8 | 427.8 | 427.8 | ER | 0 | 0 | 0 | Wind | Hoskins 345kV | 11/21/2016 | 5/14/2021 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-158 | IFS-2016-002-17 | DISIS-2016-002-1 | 03 CENTRAL | Allen County | KS | KCPL | 9/15/2019 | 12/31/2025 | 252 | 252 | 252 | ER | 0 | 0 | 0 | Wind | West Gardner 345kV | 11/30/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-157 | IFS-2016-002-20 | DISIS-2016-002-1 | 03 CENTRAL | Allen County | KS | KCPL | 9/15/2019 | 12/31/2025 | 252 | 252 | 252 | ER | 0 | 0 | 0 | Wind | West Gardner 345kV | 11/30/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-156 | Guymon | OK | SWPS | 12/31/2020 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Solar | 11/28/2016 | 6/1/2017 | WITHDRAWN | N/A | |||||||||||||
| GEN-2016-155 | IFS-2016-002-63 | DISIS-2016-002-1 | Burleigh | ND | WAPA | 12/31/2017 | 1.3 | 1.3 | 1.3 | ER | 0 | 0 | 0 | Wind | Hilken 230kV | 11/30/2016 | 3/4/2020 | WITHDRAWN | N/A | ||||||||||
| GEN-2016-154 | Mayes | OK | GRDA | 540 | 540 | 540 | ER | 0 | 0 | 0 | Thermal | Steam | 11/28/2016 | 2/27/2017 | WITHDRAWN | N/A | |||||||||||||
| GEN-2016-153 | IFS-2016-002-11 | DISIS-2016-002-1 | 03 CENTRAL | Harper County | KS | WERE | 10/30/2019 | 11/1/2023 | 134 | 134 | 134 | ER | 0 | 0 | 0 | Wind | Viola 345kV | 11/30/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-152 | Burke | ND | WAPA | 12/31/2019 | 102 | 102 | 102 | ER | 0 | 0 | 0 | Wind | Tande 345kV | 11/30/2016 | 1/17/2019 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-151 | IFS-2016-002-62 | DISIS-2016-002-1 | 01 NORTH | Burke | ND | BEPC | 9/15/2019 | 12/22/2020 | 202 | 202 | 202 | ER | 0 | 0 | 0 | Wind | Tande 345kV | 11/30/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2016-150 | IFS-2016-002-15 | DISIS-2016-002-1 | 03 CENTRAL | Nemaha | KS | WERE | 9/22/2022 | 12/30/2022 | 302 | 302 | 302 | ER | 0 | 0 | 0 | Wind | Stranger Creek 345kV | 11/30/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-149 | IFS-2016-002-14 | DISIS-2016-002-1 | 03 CENTRAL | Washington | KS | WERE | 9/15/2019 | 12/31/2022 | 302 | 302 | 302 | ER | 0 | 0 | 0 | Wind | Stranger Creek 345kV | 11/30/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-148 | Kay | OK | WFEC | 12/1/2019 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Wind | Hardy 138 kV Substation | 11/30/2016 | 6/29/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-147 | IFS-2016-002-33 | DISIS-2016-002-1 | 02 NEBRASKA | Cheyenne | NE | TriState | 9/15/2019 | 12/31/2023 | 40 | 40 | 40 | ER | 0 | 0 | 0 | Solar | Sidney 115 kV Sub | 11/30/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-146 | IFS-2016-002-56 | DISIS-2016-002-1 | 04 SOUTHEAST | Texas | OK | AEP | 9/1/2020 | 12/31/2025 | 175 | 175 | 175 | ER | 0 | 0 | 0 | Wind | Riverside 345kV Substation | 11/29/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-145 | IFS-2016-002-55 | DISIS-2016-002-1 | 04 SOUTHEAST | Texas | OK | AEP | 9/1/2020 | 12/31/2025 | 175 | 175 | 175 | ER | 0 | 0 | 0 | Wind | Riverside 345kV Substation | 11/29/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-144 | IFS-2016-002-54 | DISIS-2016-002-1 | Texas | OK | AEP | 9/1/2020 | 10/1/2020 | 175 | 175 | 175 | ER | 0 | 0 | 0 | Wind | Riverside 345kV Substation | 11/29/2016 | 10/16/2020 | WITHDRAWN | N/A | |||||||||
| GEN-2016-143 | IFS-2016-002-53 | DISIS-2016-002-1 | Texas | OK | AEP | 9/1/2020 | 10/1/2020 | 175 | 175 | 175 | ER | 0 | 0 | 0 | Wind | Riverside 345kV Substation | 11/29/2016 | 10/16/2020 | WITHDRAWN | N/A | |||||||||
| GEN-2016-142 | IFS-2016-002-52 | DISIS-2016-002-1 | 04 SOUTHEAST | Texas | OK | AEP | 9/1/2020 | 12/31/2025 | 350 | 350 | 350 | ER | 0 | 0 | 0 | Wind | Riverside 345kV Substation | 11/29/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-141 | IFS-2016-002-51 | DISIS-2016-002-1 | 04 SOUTHEAST | Texas | OK | AEP | 9/1/2020 | 12/31/2025 | 350 | 350 | 350 | ER | 0 | 0 | 0 | Wind | Riverside 345kV Substation | 11/29/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-140 | IFS-2016-002-50 | DISIS-2016-002-1 | Texas | OK | AEP | 9/1/2020 | 10/1/2020 | 75 | 75 | 75 | ER | 0 | 0 | 0 | Wind | Riverside 345kV Substation | 11/29/2016 | 10/16/2020 | WITHDRAWN | N/A | |||||||||
| GEN-2016-139 | IFS-2016-002-49 | DISIS-2016-002-1 | 04 SOUTHEAST | Texas | OK | AEP | 9/1/2020 | 12/31/2025 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | Riverside 345kV Substation | 11/29/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-138 | IFS-2016-002-48 | DISIS-2016-002-1 | 04 SOUTHEAST | Texas | OK | AEP | 9/1/2020 | 12/31/2025 | 187.5 | 187.5 | 187.5 | ER | 0 | 0 | 0 | Wind | Riverside 345kV Substation | 11/29/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-137 | IFS-2016-002-47 | DISIS-2016-002-1 | 04 SOUTHEAST | Texas | OK | AEP | 9/1/2020 | 12/31/2025 | 187.5 | 187.5 | 187.5 | ER | 0 | 0 | 0 | Wind | Riverside 345kV Substation | 11/29/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-136 | IFS-2016-002-46 | DISIS-2016-002-1 | Texas | OK | AEP | 9/1/2020 | 10/1/2020 | 75 | 75 | 75 | ER | 0 | 0 | 0 | Wind | Riverside 345kV Substation | 11/29/2016 | 10/16/2020 | WITHDRAWN | N/A | |||||||||
| GEN-2016-135 | IFS-2016-002-45 | DISIS-2016-002-1 | Texas | OK | AEP | 9/1/2020 | 10/1/2020 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | Riverside 345kV Substation | 11/29/2016 | 10/16/2020 | WITHDRAWN | N/A | |||||||||
| GEN-2016-134 | IFS-2016-002-44 | DISIS-2016-002-1 | 04 SOUTHEAST | Texas | OK | AEP | 9/1/2020 | 12/31/2025 | 187.5 | 187.5 | 187.5 | ER | 0 | 0 | 0 | Wind | Riverside 345kV Substation | 11/29/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-133 | IFS-2016-002-43 | DISIS-2016-002-1 | 04 SOUTHEAST | Texas | OK | AEP | 9/1/2020 | 12/31/2025 | 187.5 | 187.1 | 187.5 | ER | 0 | 0 | 0 | Wind | Riverside 345kV Substation | 11/29/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-132 | IFS-2016-002-61 | DISIS-2016-002-1 | 04 SOUTHEAST | Roger Mills | OK | AEPW | 12/31/2017 | 6/5/2020 | 6.1 | 6.1 | 6.1 | ER | 0 | 0 | 0 | Wind | Sweetwater 230kV | 11/30/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2016-131 | IFS-2016-002-37 | DISIS-2016-002-1 | 04 SOUTHEAST | Grady | OK | OKGE | 12/31/2017 | 10/25/2021 | 2.5 | 2.5 | 2.5 | ER | 0 | 0 | 0 | Wind | Minco 345kV | 11/30/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2016-130 | IFS-2016-002-21 | DISIS-2016-002-1 | 01 NORTH | Mercer | ND | BEPC | 9/15/2019 | 12/31/2022 | 202 | 202 | 202 | ER | 0 | 0 | 0 | Wind | Leland Olds 345 kV | 11/30/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-129 | IFS-2016-002-41 | DISIS-2016-002-1 | Pushmataha | OK | AEPW | 12/31/2019 | 132 | 132 | 132 | ER | 0 | 0 | 0 | Wind | Valliant 345 kV substation | 11/30/2016 | 3/27/2020 | WITHDRAWN | N/A | ||||||||||
| GEN-2016-128 | IFS-2016-002-36 | DISIS-2016-002-1 | 04 SOUTHEAST | Alfalfa | OK | OKGE | 9/15/2019 | 12/31/2023 | 176 | 176 | 176 | ER | 0 | 0 | 0 | Wind | Woodring 345kV | 11/30/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-127 | DISIS-2017-001 | Osage | OK | AEPW | 12/31/2019 | 200.1 | 200.1 | 200.1 | ER/NR | 0 | 0 | 0 | Wind | Shidler 138 kV Substation | 11/22/2016 | 12/7/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-126 | IFS-2016-002-06 | DISIS-2016-002-1 | 04 SOUTHEAST | Murray | OK | OKGE | 12/31/2019 | 11/24/2021 | 172.5 | 172.5 | 172.5 | ER/NR | 0 | 0 | 0 | Wind | Arbuckle 138kV substation | 11/30/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2016-125 | IFS-2016-002-29 | DISIS-2016-002-1 | 05 SOUTHWEST | Roosevelt | NM | SWPS | 12/31/2019 | 12/31/2020 | 74 | 74 | 74 | ER | 0 | 0 | 0 | Wind | Eddy County-Tolk (Crossroads) 345kV | 11/30/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2016-124 | IFS-2016-002-28 | DISIS-2016-002-1 | 05 SOUTHWEST | Roosevelt | NM | SWPS | 12/31/2019 | 12/31/2020 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | Eddy County-Tolk (Crossroads) 345kV | 11/30/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2016-123 | IFS-2016-002-27 | DISIS-2016-002-1 | 05 SOUTHWEST | Roosevelt | NM | SWPS | 12/31/2019 | 12/31/2020 | 298 | 298 | 298 | ER | 0 | 0 | 0 | Wind | Eddy County-Tolk (Crossroads) 345kV | 11/30/2016 | 2/19/2021 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||
| GEN-2016-122 | IFS-2016-002-08 | DISIS-2016-002-1 | Ellsworth | KS | WERE | 10/1/2020 | 12/31/2020 | 225 | 225 | 225 | ER | 0 | 0 | 0 | Wind | Reno - Summit 345kV | 11/30/2016 | 2/18/2021 | WITHDRAWN | N/A | |||||||||
| GEN-2016-121 | IFS-2016-002-26 | DISIS-2016-002-1 | 05 SOUTHWEST | Lea | NM | SWPS | 10/1/2022 | 12/1/2022 | 110 | 110 | 110 | ER | 0 | 0 | 0 | Solar | Roadrunner 115kV | 11/22/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-120 | DISIS-2017-001 | Crosby | TX | SWPS | 6/1/2020 | 400 | 400 | 400 | ER/NR | 0 | 0 | 0 | Wind | Border-TUCO 345kV | 11/30/2016 | 4/16/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-119 | IFS-2016-002-10 | DISIS-2016-002-1 | 04 SOUTHEAST | Kingfisher | OK | OKGE | 5/15/2020 | 12/31/2025 | 600 | 600 | 600 | ER | 0 | 0 | 0 | Wind | Spring Creek-Sooner 345kV | 11/30/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-118 | IFS-2016-002-05 | DISIS-2016-002-1 | 04 SOUTHEAST | Kingfisher | OK | WFEC | 5/15/2021 | 9/10/2021 | 288 | 288 | 288 | ER | 0 | 0 | 0 | Wind | Dover Switchyard 138 kV Line | 11/30/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2016-117 | Bovina | TX | SWPS | 7/1/2019 | 50 | 50 | 50 | ER | 0 | 0 | 0 | Wind | Plaasant Hill 230kV | 11/27/2016 | 4/6/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-116 | Dixon | NE | NPPD | 12/1/2019 | 320 | 320 | 320 | ER/NR | 0 | 0 | 0 | Wind | Hoskins-Twin Church 230 kV Line | 11/30/2016 | 6/29/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-115 | IFS-2016-002-24 | DISIS-2016-002-1 | 03 CENTRAL | Atchison | MO | KCPL GMO) | 11/16/2020 | 3/2/2021 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | Nebraska City-Mullen Creek (Holt County MO) 345kV | 11/30/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | As of the COD notice 120 MW have been placed in commercial operation.3/2/2021 | ||||||||
| GEN-2016-114 | IFS-2016-002-09 | DISIS-2016-002-1 | McPherson | KS | WERE | 10/2/2020 | 12/31/2020 | 310 | 310 | 310 | ER/NR | 0 | 0 | 0 | Wind | Reno - Summit 345kV | 10/2/2020 | 3/16/2021 | WITHDRAWN | N/A | |||||||||
| GEN-2016-113 | DISIS-2017-001 | Ellsworth | KS | WERE | 12/1/2018 | 155 | 155 | 155 | ER/NR | 0 | 0 | 0 | Wind | Reno (GEN-2016-111 Tap)-Summit 345kV | 11/30/2016 | 4/16/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-112 | IFS-2016-002-07 | DISIS-2016-002-1 | Ellsworth | KS | WERE | 10/1/2020 | 12/31/2020 | 220 | 220 | 220 | ER | 0 | 0 | 0 | Wind | Reno - Summit 345kV | 11/30/2016 | 2/19/2021 | WITHDRAWN | N/A | |||||||||
| GEN-2016-111 | IFS-2016-002-18 | DISIS-2016-002-1 | 03 CENTRAL | McPherson | KS | WERE | 9/15/2019 | 1/15/2024 | 302 | 302 | 302 | ER | 0 | 0 | 0 | Wind | Reno - Summit 345kV | 11/30/2016 | IA FULLY EXECUTED/ON SUSPENSION | N/A | Suspension Start Date of 3/24/2021 | ||||||||
| GEN-2016-110 | IFS-2016-002-16 | DISIS-2016-002-1 | Platte | WY | BEPC | 9/15/2019 | 12/31/2020 | 152 | 152 | 152 | ER | 0 | 0 | 0 | Wind | Laramie River-Stegall 345 kV Line | 11/30/2016 | 1/26/2021 | WITHDRAWN | N/A | |||||||||
| GEN-2016-109 | DISIS-2017-001 | Jefferson | NE | NPPD | 12/15/2019 | 102 | 102 | 102 | ER/NR | 0 | 0 | 0 | Wind | Fairbury 115 kV Substation | 11/22/2016 | 12/7/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-108 | Mercer | ND | WAPA | 6/1/2019 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Antelope Valley Station-Charlie Creek 345kV | 11/21/2016 | 1/17/2019 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-107 | DISIS-2017-001 | Major | OK | WFEC | 12/15/2019 | 141.75 | 141.75 | 141.75 | ER/NR | 0 | 0 | 0 | Wind | Okeene-Cederdale 138 kV Line | 11/21/2016 | 12/7/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-106 | IFS-2016-002-65 | DISIS-2016-002-1 | Keith | NE | NPPD | 12/15/2019 | 12/31/2020 | 400 | 400 | 400 | ER | 0 | 0 | 0 | Wind | Gerald Gentleman Station 345kV | 11/17/2016 | 1/25/2021 | WITHDRAWN | N/A | |||||||||
| GEN-2016-105 | Dawson | MT | WAPA | 10/15/2019 | 120 | 120 | 120 | ER/NR | 0 | 0 | 0 | Wind | Tap Dawson County - Ft. Peck (Coal Hill) 230kV | 11/17/2016 | 7/20/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-104 | Sumner | KS | OKGE | 12/31/2019 | 400 | 400 | 400 | ER/NR | 0 | 0 | 0 | Wind | Tap Woodring-Cimarron 345kV Line | 11/2/2016 | 4/6/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-103 | DISIS-2017-001 | Hyde | SD | WAPA | 12/1/2018 | 240 | 240 | 240 | ER | 0 | 0 | 0 | Wind | Chappelle Creek 345kV | 11/14/2016 | 5/14/2021 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-102 | IFS-2016-002-01 | DISIS-2016-002-1 | 04 SOUTHEAST | Pontotoc | OK | OKGE | 11/1/2023 | 12/1/2023 | 150.9 | 150.9 | 150.9 | ER/NR | 0 | 0 | 0 | Wind | Blue River 138kV | 11/7/2016 | IA FULLY EXECUTED/ON SUSPENSION | N/A | |||||||||
| GEN-2016-101 | IFS-2016-002-13 | DISIS-2016-002-1 | Noble | OK | OKGE | 10/1/2020 | 11/1/2020 | 195 | 195 | 195 | ER | 0 | 0 | 0 | Wind | Spring Creek-Sooner 345kV | 11/9/2016 | 3/9/2021 | WITHDRAWN | N/A | |||||||||
| GEN-2016-100 | IFS-2016-002-12 | DISIS-2016-002-1 | Noble | OK | OKGE | 10/1/2020 | 11/1/2020 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | Spring Creek-Sooner 345kV | 11/9/2016 | 3/9/2021 | WITHDRAWN | N/A | |||||||||
| GEN-2016-099 | Parmer | TX | SWPS | 10/1/2020 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Wind | Deaf Smith 230 kV | 11/7/2016 | 4/6/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-098 | Harper | OK | OKGE | 10/1/2020 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Wind | Badger-Woodward EHV Dbl Ckt 345kV | 11/7/2016 | 8/17/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-097 | IFS-2016-002-31 | DISIS-2016-002-1 | 04 SOUTHEAST | Caddo | OK | AEP | 9/1/2020 | 12/31/2023 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Wind | Tap Southwestern-Fletcher Tap 138kV | 10/19/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-096 | IFS-2016-002-58 | DISIS-2016-002-1 | Fillmore | NE | NPPD | 5/7/2020 | 10/31/2020 | 227.7 | 227.7 | 227.7 | ER | 0 | 0 | 0 | Wind | Moore (GEN-2015-088 Tap)-Pauline 345kV | 11/1/2016 | 7/14/2020 | WITHDRAWN | N/A | |||||||||
| GEN-2016-095 | IFS-2016-002-32 | DISIS-2016-002-1 | 04 SOUTHEAST | Caddo | OK | AEPW | 9/1/2020 | 12/31/2023 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Gracemont-Lawton East Side 345kV | 12/1/2020 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-094 | IFS-2016-002-25 | DISIS-2016-002-1 | 01 NORTH | Hyde | SD | WAPA | 10/1/2020 | 12/1/2022 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Tap Ft Thompson - Oahe 230kV Line (Single Circuit) | 10/31/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-093 | DISIS-2017-001 | Scotts Bluff | NE | NPPD | 12/31/2018 | 70 | 70 | 70 | ER | 0 | 0 | 0 | Solar | Bobcat 115kV | 10/10/2016 | 9/10/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-092 | IFS-2016-002-68 | DISIS-2016-002-1 | Hyde | SD | BEPC | 10/1/2020 | 12/1/2020 | 175 | 175 | 175 | ER | 0 | 0 | 0 | Wind | Chappelle Creek 345kV | 10/5/2016 | 3/12/2021 | WITHDRAWN | N/A | |||||||||
| GEN-2016-091 | IFS-2016-002-22 | DISIS-2016-002-1 | 04 SOUTHEAST | Caddo | OK | AEP | 5/6/2020 | 1/8/2022 | 303.6 | 303.6 | 303.6 | ER | 0 | 0 | 0 | Wind | Gracemont-Lawton East Side 345kV | 10/3/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2016-090 | DISIS-2017-001 | Terry | TX | SWPS | 12/31/2022 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Solar | Yoakum-Seagraves 115kV circuit | 9/28/2016 | 12/7/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-089 | Bailey | TX | SWPS | 11/30/2018 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Solar | Tap 230kV Roosevelt-Tolk Line | 9/28/2016 | 3/24/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-088 | IFS-2016-002-40 | DISIS-2016-002-1 | Osborn | MO | KCPL | 12/31/2018 | 10/29/2021 | 151.2 | 151.2 | 151.2 | ER/NR | 0 | 0 | 0 | Wind | Mullen Creek-Sibley (Ketchum) 345kV | 8/11/2016 | 3/16/2021 | TERMINATED | N/A | |||||||||
| GEN-2016-087 | IFS-2016-002-59 | DISIS-2016-002-1 | 01 NORTH | Campbell | SD | WAPA | 11/15/2019 | 12/31/2023 | 98.9 | 98.9 | 98.9 | ER | 0 | 0 | 0 | Wind | Bismark-Glenham 230 kV line | 7/25/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-086 | Roosevelt | NM | SWPS | 12/31/2019 | 240 | 240 | 240 | ER/NR | 0 | 0 | 0 | Solar | Roosevelt substation 230kV | 6/30/2016 | 3/28/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-085 | Lea | NM | SWPS | 12/31/2019 | 80 | 80 | 80 | ER/NR | 0 | 0 | 0 | Solar | Hobbs substation 115kV bus | 6/30/2016 | 3/28/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-084 | Lea | NM | SWPS | 7/1/2019 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Wind | 6/30/2016 | 8/4/2016 | WITHDRAWN | N/A | |||||||||||||
| GEN-2016-083 | Dewey | OK | OKGE | 7/1/2019 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Wind | 6/30/2016 | 8/4/2016 | WITHDRAWN | N/A | |||||||||||||
| GEN-2016-082 | Roger Mills | OK | WFEC | 7/1/2019 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Wind | 6/30/2016 | 8/4/2016 | WITHDRAWN | N/A | |||||||||||||
| GEN-2016-081 | Yoakum | TX | SWPS | 7/1/2019 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Wind | 6/30/2016 | 8/4/2016 | WITHDRAWN | N/A | |||||||||||||
| GEN-2016-080 | Lea | NM | SWPS | 12/15/2019 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Solar | 6/30/2016 | 8/4/2016 | WITHDRAWN | N/A | |||||||||||||
| GEN-2016-079 | Cheyenne | NE | NPPD | 12/31/2019 | 160 | 160 | 160 | ER/NR | 0 | 0 | 0 | Solar | Sidney Substation 230kV | 6/30/2016 | 3/28/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-078 | DISIS-2017-001 | Bailey | TX | SWPS | 12/31/2022 | 108 | 108 | 108 | ER/NR | 0 | 0 | 0 | Solar | Bailey County 115kV | 6/29/2016 | 12/7/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-077 | DISIS-2017-001 | Terry | TX | SWPS | 12/31/2022 | 54 | 54 | 54 | ER/NR | 0 | 0 | 0 | Solar | Lakeview-Brownfield 69kV line | 6/29/2016 | 9/10/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-076 | Roosevelt | NM | SWPS | 12/31/2018 | 396 | 396 | 396 | ER/NR | 0 | 0 | 0 | Wind | Crossroads 345kV substation | 6/30/2016 | 11/30/2016 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-075 | IFS-2016-001-21 | DISIS-2016-001-3 | 02 NEBRASKA | Holt | NE | WAPA | 12/31/2017 | 12/31/2024 | 50 | 50 | 50 | ER | 0 | 0 | 0 | Wind | Fort Thompson-Grand Island (Grand Prairie) 345kV | 3/31/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-074 | IFS-2016-002-57 | DISIS-2016-002-1 | 02 NEBRASKA | Custer | NE | NPPD | 10/30/2020 | 7/1/2024 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Sweetwater 345kV | 4/14/2016 | IA FULLY EXECUTED/ON SUSPENSION | N/A | |||||||||
| GEN-2016-073 | IFS-2016-001-48 | DISIS-2016-001-3 | 03 CENTRAL | Kingman County | KS | WERE | 12/31/2017 | 10/30/2022 | 220 | 220 | 220 | ER | 0 | 0 | 0 | WIND | Thistle-Wichita Dbl Ckt (Buffalo Flats) 345kV | 3/30/2016 | IA FULLY EXECUTED/ON SUSPENSION | N/A | |||||||||
| GEN-2016-072 | DISIS-2017-001 | Grant | OK | OKGE | 7/31/2018 | 156 | 156 | 156 | ER | 0 | 0 | 0 | Wind | Renfrow 345kV | 3/31/2016 | 12/17/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-071 | IFS-2016-001-19 | DISIS-2016-001-3 | 04 SOUTHEAST | Kay | OK | OKGE | 9/30/2018 | 11/30/2021 | 200.1 | 200.1 | 200.1 | ER | 0 | 0 | 0 | Wind | Middleton Tap 138kV Substation | 3/30/2016 | IA FULLY EXECUTED/ON SUSPENSION | N/A | |||||||||
| GEN-2016-070 | IFS-2016-001-18 | DISIS-2016-001-3 | 05 SOUTHWEST | Carson | TX | SWPS | 11/1/2016 | 5/31/2020 | 5.3 | 5.3 | 5.3 | ER | 0 | 0 | 0 | Wind | Martin 115 kV Substation | 3/30/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-069 | IFS-2016-001-32 | DISIS-2016-001-3 | Roswell | NM | SWPS | 6/1/2018 | 31.4 | 31.4 | 31.4 | ER | 0 | 0 | 0 | Solar | Chaves County 115kV | 3/30/2016 | 8/27/2019 | WITHDRAWN | N/A | ||||||||||
| GEN-2016-068 | IFS-2016-001-40 | DISIS-2016-001-3 | 04 SOUTHEAST | Garfield | OK | OKGE | 9/18/2020 | 12/15/2020 | 250 | 250 | 250 | ER | 0 | 0 | 0 | Wind | Woodring 345kV | 3/30/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2016-067 | IFS-2016-001-33 | DISIS-2016-001-3 | 03 CENTRAL | Thomas | KS | SUNC | 11/1/2017 | 7/24/2019 | 73.6 | 73.6 | 73.6 | ER | 0 | 0 | 0 | Wind | Mingo 345kV | 3/31/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2016-066 | Stark | ND | WAPA | 10/1/2016 | 13 | 13 | 13 | ER | 0 | 0 | 0 | Wind | Tap Rhame-Belfield 230kV | 3/24/2016 | 3/2/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-065 | Stark | ND | WAPA | 10/1/2016 | 6.8 | 6.8 | 6.8 | ER | 0 | 0 | 0 | Wind | Tap Belfield-Rhame (Daglam) 230kV | 3/24/2016 | 3/2/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-064 | Webster | NE | NPPD | 12/1/2017 | 116 | 116 | 116 | ER | 0 | 0 | 0 | Wind | Rosemont ring-bus station 115kv substation | 3/30/2016 | 9/19/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-063 | IFS-2016-001-17 | DISIS-2016-001-3 | 04 SOUTHEAST | Johnston | OK | OKGE | 12/31/2018 | 6/1/2023 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Hugo-Sunnyside 345 kV | 3/30/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-062 | IFS-2016-001-16 | DISIS-2016-001-3 | Andrews | TX | SWPS | 12/1/2018 | 250.7 | 250.7 | 250.7 | ER | 0 | 0 | 0 | Wind | Andrews County 230kV | 3/29/2016 | 8/27/2019 | WITHDRAWN | N/A | ||||||||||
| GEN-2016-061 | IFS-2016-001-15 | DISIS-2016-001-3 | 04 SOUTHEAST | Garfield/Noble | OK | OKGE | 12/1/2017 | 11/21/2020 | 250.7 | 250.7 | 250.7 | ER | 0 | 0 | 0 | Wind | Sooner-Woodring 345 kV line | 3/29/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2016-060 | IFS-2016-001-14 | Sumner | KS | WERE | 12/31/2017 | 25.3 | 25.3 | 25.3 | ER | 0 | 0 | 0 | Wind | Belle Plain 138 kV Substation | 3/31/2016 | 10/15/2018 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-059 | Cimarron | TX | SWPS | 8/31/2018 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Wind | Harrington 230kV Sub | 3/31/2016 | 4/6/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-058 | Yoakum | TX | SWPS | 9/1/2018 | 212 | 212 | 212 | ER | 0 | 0 | 0 | Solar | Yoakum 345 kV Sub | 3/30/2016 | 4/17/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-057 | IFS-2016-001-35 | DISIS-2016-001-3 | 04 SOUTHEAST | Cimarron, Texas County | OK | OKGE | 8/31/2018 | 1/31/2022 | 499.1 | 499.1 | 499.1 | ER | 0 | 0 | 0 | Wind | Mathewson 345kV | 3/31/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-056 | IFS-2016-001-41 | DISIS-2016-001-3 | Hockley | TX | SWPS | 12/15/2018 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Carlisle 230kV | 3/30/2016 | 8/27/2019 | WITHDRAWN | N/A | ||||||||||
| GEN-2016-055 | Webster | NE | NPPD | 12/1/2018 | 126.5 | 126.5 | 126.5 | ER | 0 | 0 | 0 | Wind | Pauline-Hildreth 155 kV | 3/30/2016 | 9/19/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-054 | IFS-2016-001-47 | DISIS-2016-001-3 | Jerauld | SD | WAPA | 3.4 | 3.4 | 3.4 | ER | 0 | 0 | 0 | Wind | Springs 230kV | 3/28/2016 | 5/23/2019 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-053 | IFS-2016-001-46 | DISIS-2016-001-3 | Burleigh | ND | WAPA | 12/31/2016 | 3.3 | 3.3 | 3.3 | ER | 0 | 0 | 0 | Wind | Hilken 230kV | 3/28/2016 | 12/2/2019 | WITHDRAWN | N/A | ||||||||||
| GEN-2016-052 | IFS-2016-001-23 | DISIS-2016-001-3 | Burleigh | ND | WAPA | 12/31/2016 | 3.3 | 3.3 | 3.3 | ER | 0 | 0 | 0 | Wind | Hilken 230kV | 3/28/2016 | 12/2/2019 | WITHDRAWN | N/A | ||||||||||
| GEN-2016-051 | IFS-2016-001-13 | DISIS-2016-001-3 | 04 SOUTHEAST | Custer | OK | AEPW | 12/31/2020 | 9.8 | 9.8 | 9.8 | ER | 0 | 0 | 0 | Wind | Clinton Junction-Weatherford Southeast 138kV | 3/30/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | ||||||||||
| GEN-2016-050 | IFS-2016-001-42 | DISIS-2016-001-3 | 02 NEBRASKA | Webster Co | NE | NPPD | 12/1/2017 | 12/9/2021 | 250.7 | 250.7 | 250.7 | ER | 0 | 0 | 0 | Wind | Axtell – Post Rock 345 kV | 3/30/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2016-049 | DISIS-2017-001 | McCraken | KS | SUNC | 7/31/2018 | 310.2 | 310.2 | 310.2 | ER | 0 | 0 | 0 | Wind | Post Rock - Spearville 345kV | 3/31/2016 | 12/4/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-048 | DISIS-2017-001 | Osage Co | OK | OKGE | 6/30/2019 | 82.3 | 74 | 82.3 | ER/NR | 0 | 0 | 0 | Solar | Sooner 138 kV | 3/31/2016 | 5/24/2019 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-047 | IFS-2016-001-22 | DISIS-2016-001-3 | 04 SOUTHEAST | Canadian | OK | OKGE | 12/31/2017 | 3/24/2018 | 24 | 8 | 24 | ER | 0 | 0 | 0 | Thermal | CT | Mustang 69kV | 3/31/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||
| GEN-2016-046 | IFS-2016-001-12 | DISIS-2016-001-3 | 03 CENTRAL | Ford County | KS | SUNC | 12/1/2018 | 12/23/2021 | 299 | 299 | 299 | ER | 0 | 0 | 0 | Wind | Clark County-Ironwood 345kV | 3/31/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2016-045 | IFS-2016-001-34 | DISIS-2016-001-3 | 04 SOUTHEAST | Cimarron, Texas County | OK | OKGE | 8/31/2018 | 12/31/2021 | 499.1 | 499.1 | 499.1 | ER | 0 | 0 | 0 | Wind | Mathewson 345kV | 3/31/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-044 | Logan County | ND | BEPC | 12/1/2018 | 12/1/2018 | 400 | 400 | 400 | ER | 0 | 0 | 0 | Wind | Leland Olds - Groton 345kV line | 3/31/2016 | 5/22/2017 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-043 | IFS-2016-001-36 | DISIS-2016-001-3 | 02 NEBRASKA | Wayne County | NE | NPPD | 9/1/2018 | 6/27/2020 | 230 | 230 | 230 | ER | 0 | 0 | 0 | Wind | Hoskins 345kV | 3/31/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2016-042 | Grady and Stephens County | OK | AEPW | 12/31/2016 | 12/31/2016 | 22 | 22 | 22 | ER | 0 | 0 | 0 | Wind | Tap Lawton - Sunnyside 345kV | 3/30/2016 | 3/3/2017 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-041 | Texas County | OK | SWPS | 1/1/2019 | 1/1/2019 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Solar | Hitchland 345kV Substation | 3/28/2016 | 2/13/2017 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-040 | Dekalb County | MO | GMO | 12/31/2016 | 12/31/2016 | 18.4 | 18.4 | 18.4 | ER | 0 | 0 | 0 | Wind | Nebraska City – Sibley 345kV | 3/25/2016 | 5/5/2017 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-039 | DISIS-2017-001 | Randall County | TX | SWPS | 12/31/2017 | 112 | 112 | 112 | ER | 0 | 0 | 0 | Solar | Swisher 115kV | 3/31/2016 | 6/7/2021 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-038 | Cimarron County | OK | SWPS | 8/31/2018 | 8/31/2018 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | WIND | Harrington 230kV Substation | 3/31/2016 | 2/28/2017 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-037 | IFS-2017-001-32 | DISIS-2017-001 | 04 SOUTHEAST | Washita County | OK | AEPW | 6/1/2021 | 12/31/2022 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | Chisholm-Gracemont 345kV | 3/31/2016 | FACILITY STUDY STAGE | N/A | |||||||||
| GEN-2016-036 | IFS-2016-002-42 | DISIS-2016-002-1 | 01 NORTH | Chippewa County | MN | WAPA | 11/17/2018 | 11/19/2018 | 44.6 | 44.6 | 44.6 | ER | 0 | 0 | 0 | Wind | Granite Falls 115kV substation | 3/28/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-035 | Burleigh County | ND | WAPA | 6/30/2018 | 6/30/2018 | 264.5 | 264.5 | 264.5 | ER | 0 | 0 | 0 | Wind | Tap Bismark – Mound Ridge 230 kV | 3/30/2016 | 8/4/2016 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-034 | DISIS-2017-001 | Banner County | NE | WAPA | 6/1/2018 | 90 | 90 | 90 | ER | 0 | 0 | 0 | Wind | Laramie River Station - Sidney 345kV | 3/31/2016 | 12/7/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-033 | Johnston | OK | OKGE | 12/31/2018 | 82.3 | 74.8 | 82.3 | ER/NR | 0 | 0 | 0 | Solar | Imo 138 kV Sub | 3/31/2016 | 7/25/2016 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-032 | IFS-2016-001-11 | DISIS-2016-001-3 | 04 SOUTHEAST | Kingfisher Co | OK | OKGE | 2/1/2023 | 12/31/2023 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Crescent Substation 138 kV | 3/30/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-031 | IFS-2016-001-10 | DISIS-2016-001-3 | 04 SOUTHEAST | Kay County | OK | OKGE | 11/30/2016 | 5/29/2018 | 1.5 | 1.5 | 1.5 | ER | 0 | 0 | 0 | Wind | Rose Hill (Open Sky)-Sooner (Ranch Road) 345kV | 3/25/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2016-030 | IFS-2016-001-26 | DISIS-2016-001-3 | 04 SOUTHEAST | Johnston Co | OK | OKGE | 8/28/2021 | 6/1/2023 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Solar | Brown 138kV | 3/30/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-029 | IFS-2016-001-09 | DISIS-2016-001-3 | Platte Co | WY | BEPC | 12/31/2017 | 150.5 | 150.5 | 150.5 | ER | 0 | 0 | 0 | Wind | Laramie River Station-Sidney 345kV | 3/28/2016 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-028 | IFS-2016-001-38 | DISIS-2016-001-3 | 04 SOUTHEAST | Le Flore Co | OK | AEPW | 12/31/2018 | 12/27/2019 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | Clayton 138 kV Sub | 3/29/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2016-027 | Cherry Co | NE | 12/31/2017 | 60 | 60 | 60 | ER/NR | 0 | 0 | 0 | Wind | 3/31/2016 | 5/18/2016 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2016-026 | Custer Co | NE | NPPD | 12/31/2018 | 120 | 120 | 120 | ER/NR | 0 | 0 | 0 | Wind | Callaway 115kV (#640098) | 3/31/2016 | 8/4/2016 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-025 | Custer County | NE | NPPD | 12/31/2018 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Wind | 3/31/2016 | 4/11/2016 | WITHDRAWN | N/A | |||||||||||||
| GEN-2016-024 | DISIS-2017-001 | El Dorado | KS | WERE | 12/31/2018 | 55.9 | 55.9 | 55.9 | ER/NR | 0 | 0 | 0 | Solar | Midian 138kV Substation | 3/29/2016 | 5/24/2019 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-023 | IFS-2016-001-43 | DISIS-2016-001-3 | Platte | WY | BEPC | 12/31/2017 | 150.5 | 150.5 | 150.5 | ER | 0 | 0 | 0 | Wind | Laramie River Station-Sidney 345kV | 3/28/2016 | 4/6/2020 | WITHDRAWN | N/A | ||||||||||
| GEN-2016-022 | IFS-2016-001-29 | DISIS-2016-001-3 | 04 SOUTHEAST | Newkirk, Kay County | OK | OKGE | 12/31/2017 | 12/10/2020 | 151.8 | 151.8 | 151.8 | ER | 0 | 0 | 0 | Wind | Rose Hill (Open Sky)-Sooner (Ranch Road) 345kV | 3/31/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2016-021 | IFS-2016-001-31 | DISIS-2016-001-3 | 02 NEBRASKA | Dixon County | NE | NPPD | 12/1/2018 | 10/1/2021 | 298.47 | 298.47 | 298.47 | ER | 0 | 0 | 0 | WIND | Hoskins 345kV | 3/31/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-020 | IFS-2016-001-27 | DISIS-2016-001-3 | 04 SOUTHEAST | Woodward County | OK | WFEC | 12/31/2018 | 12/18/2020 | 148.4 | 148.4 | 148.4 | ER | 0 | 0 | 0 | WIND | Moreland 138kV Substation | 4/1/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2016-019 | Johnston County | OK | OKGE | 6/1/2021 | 1219 | 1199 | 1219 | ER/NR | 0 | 0 | 0 | Thermal | CT | Hugo - Sunnyside 345kV | 3/28/2016 | 8/4/2016 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-018 | Johnston County | OK | OKGE | 6/1/2021 | 884 | 855 | 884 | ER/NR | 0 | 0 | 0 | Thermal | CT | Hugo - Sunnyside 345kV | 3/28/2016 | 8/4/2016 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-017 | IFS-2016-001-08 | DISIS-2016-001-3 | 01 NORTH | Hyde County | SD | BEPC | 12/1/2017 | 11/23/2020 | 250.24 | 250.24 | 250.24 | ER | 0 | 0 | 0 | Wind | Chappelle Creek 345kV | 3/29/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2016-016 | IFS-2016-001-07 | DISIS-2016-001-3 | 03 CENTRAL | Edwards | KS | MIDW | 12/1/2017 | 12/1/2023 | 78.2 | 78.2 | 78.2 | ER | 0 | 0 | 0 | Wind | North Kinsley 115 kV | 3/29/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-015 | IFS-2016-001-30 | DISIS-2016-001-3 | Andrews | TX | SWPS | 10/1/2018 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Solar | Andrews County 230kV | 3/29/2016 | 8/27/2019 | WITHDRAWN | N/A | ||||||||||
| GEN-2016-014 | IFS-2016-001-04 | DISIS-2016-001-3 | 03 CENTRAL | Joplin | MO | EDE | 4/25/2003 | 4/30/2020 | 10 | 10 | 10 | ER | 0 | 0 | 0 | Thermal | CT | LaRussell Energy Center 161kV | 3/29/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||
| GEN-2016-013 | IFS-2016-001-03 | DISIS-2016-001-3 | 03 CENTRAL | Joplin | MO | EDE | 4/25/2003 | 4/30/2020 | 10 | 10 | 10 | ER | 0 | 0 | 0 | Thermal | CT | LaRussell Energy Center 161kV | 3/29/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||
| GEN-2016-012 | Garnett | KS | WERE | 10/1/2018 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Wolf Creed-La Cygne 345 kV | 3/31/2016 | 3/1/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-011 | Harper | KS | WERE | 12/31/2018 | 116 | 116 | 116 | ER/NR | 0 | 0 | 0 | Wind | 3/24/2016 | 4/12/2016 | WITHDRAWN | N/A | |||||||||||||
| GEN-2016-010 | Harper | KS | WERE | 12/31/2018 | 134 | 134 | 134 | ER/NR | 0 | 0 | 0 | Wind | Tap Flat Ridge 2 East (#532792) – Viola (#532798) 345kV | 3/24/2016 | 8/4/2016 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-009 | IFS-2016-001-02 | DISIS-2016-001-3 | 03 CENTRAL | Ponca City | OK | OKGE | 9/30/2018 | 6/15/2019 | 29 | 29 | 29 | ER | 0 | 0 | 0 | Thermal | Steam Turbine | Osage 69 kV Sub | 3/24/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | ||||||||
| GEN-2016-008 | Greer | OK | WFEC | 6/30/2019 | 40 | 40 | 40 | ER/NR | 0 | 0 | 0 | Solar | Granite 69 kV Sub | 3/24/2016 | 2/28/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-007 | IFS-2016-001-37 | DISIS-2016-001-3 | 01 NORTH | Barnes | ND | WAPA | 12/31/2018 | 12/31/2024 | 100.05 | 100.05 | 100.05 | ER | 0 | 0 | 0 | Wind | Valley City 115 kV | 3/28/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-006 | Haakon | SD | WAPA | 12/31/2018 | 140 | 140 | 140 | ER/NR | 0 | 0 | 0 | Wind | Philip Tap; New Underwood-Oahe 230 kV | 3/28/2016 | 8/4/2016 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-005 | DISIS-2017-001 | Ford | KS | SUNC | 10/31/2021 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Wind | Clark-Thistle 345kV | 3/14/2016 | 11/30/2020 | WITHDRAWN | N/A | |||||||||||
| GEN-2016-004 | IFS-2016-001-25 | DISIS-2016-001-3 | 01 NORTH | Oliver | ND | BEPC | 10/5/2022 | 12/31/2025 | 202 | 202 | 202 | ER/NR | 0 | 0 | 0 | Wind | Basin Electric 230 kV | 3/10/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-003 | IFS-2016-001-45 | DISIS-2016-001-3 | 04 SOUTHEAST | Ellis | OK | OKGE | 12/31/2017 | 8/31/2021 | 248.4 | 248.4 | 248.4 | ER | 0 | 0 | 0 | Wind | Badger-Woodward EHV Dbl Ckt 345kV | 3/15/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2016-002 | Swisher | TX | SWPS | 12/31/2018 | 74 | 74 | 74 | ER/NR | 0 | 0 | 0 | Wind | Happy 115 kV Sub | 3/4/2016 | 3/1/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2016-001 | Beaver | OK | OKGE | 1/12/2018 | 300.3 | 300.3 | 300.3 | ER | 0 | 0 | 0 | Wind | Badger to Woodward 345kV line (approximately fifty (50) miles west of Woodward District EHV 345kV Substation) | 2/11/2016 | 2/26/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-101 | Deaf Smith County | TX | SWPS | 10/1/2017 | 10/1/2017 | 240 | 240 | 240 | ER/NR | 0 | 0 | 0 | Wind | Plant X - Deaft Smith 230kV | 12/28/2015 | 4/15/2016 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-100 | Jefferson | NE | NPPD | 11/1/2020 | 120 | 120 | 120 | ER/NR | 0 | 0 | 0 | Wind | Fairbury 115kV substation | 12/23/2015 | 4/18/2016 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-099 | IFS-2016-002-30 | DISIS-2016-002-1 | Lea | NM | SWPS | 12/31/2016 | 73.3 | 73.3 | 73.3 | ER | 0 | 0 | 0 | Solar | Maddox 115kV | 12/11/2015 | 7/26/2020 | WITHDRAWN | N/A | ||||||||||
| GEN-2015-098 | IFS-2015-002-45 | DISIS-2015-002-7 | Wibaux | MT | WAPA | 12/15/2017 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | Dawson-Medora (Mingusville) 230kV | 10/23/2015 | 3/4/2019 | WITHDRAWN | N/A | ||||||||||
| GEN-2015-097 | IFS-2015-002-44 | Day County | SD | WAPA | 12/31/2016 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | Day County 115kV substation | 10/29/2015 | 1/12/2017 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-096 | IFS-2015-002-43 | DISIS-2015-002-7 | 01 NORTH | Hettinger County | ND | BEPC | 12/31/2017 | 12/29/2016 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | Brady 230kV substation | 10/19/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-095 | IFS-2016-001-20 | DISIS-2016-001-3 | 04 SOUTHEAST | Woods County | OK | OKGE | 12/1/2017 | 6/1/2020 | 176 | 176 | 176 | ER | 0 | 0 | 0 | Wind | Tap Mooreland - Knob Hill 138kV | 9/21/2015 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2015-094 | Banner | NE | WAPA | 10/31/2017 | 151.8 | 151.8 | 151.8 | ER/NR | 0 | 0 | 0 | Wind | Laramie River Station-Sidney 345 kV | 10/22/2015 | 3/11/2016 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-093 | IFS-2015-002-37 | DISIS-2015-002-7 | 04 SOUTHEAST | Caddo | OK | OKGE | 12/1/2017 | 12/31/2022 | 250 | 250 | 250 | ER | 0 | 0 | 0 | Wind | Gracemont 345kV | 9/29/2015 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2015-092 | IFS-2015-002-36 | DISIS-2015-002-7 | 04 SOUTHEAST | Grady | OK | AEPW | 12/1/2017 | 12/31/2020 | 250 | 250 | 250 | ER | 0 | 0 | 0 | Wind | Lawton East Side-Sunnyside (Terry Road) 345kV | 9/30/2015 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2015-091 | IFS-2015-002-47 | Stark | ND | WAPA | 12/1/2018 | 101.2 | 101.2 | 101.2 | ER | 0 | 0 | 0 | Wind | Belfield-Rhame 230kV | 10/15/2015 | 6/9/2017 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-090 | IFS-2015-002-21 | DISIS-2015-002-7 | 03 CENTRAL | Pratt | KS | WERE | 12/1/2017 | 12/14/2018 | 220 | 220 | 220 | ER | 0 | 0 | 0 | Wind | Thistle-Wichita Dbl Ckt (Buffalo Flats) 345kV | 9/29/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-089 | IFS-2016-001-05 | DISIS-2016-001-3 | 01 NORTH | Bon Homme | SD | WAPA | 6/30/2017 | 4/22/2020 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Utica 230 kV Substation | 10/13/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-088 | IFS-2015-002-32 | DISIS-2015-002-7 | 02 NEBRASKA | Saline | NE | NPPD | 1/1/2019 | 12/29/2020 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Wind | Tobias 345kV Substation | 9/30/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-087 | IFS-2015-002-31 | DISIS-2015-002-7 | Thayer | NE | NPPD | 1/1/2019 | 12/1/2019 | 66 | 66 | 66 | ER/NR | 0 | 0 | 0 | Wind | Hebron-Fairbury 115 kV | 9/30/2015 | 3/21/2019 | TERMINATED | N/A | |||||||||
| GEN-2015-086 | Woodward | OK | WFEC | 12/31/2018 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Mooreland 138kV Substation | 9/24/2015 | 2/4/2016 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-085 | IFS-2015-002-23 | Jackson | OK | AEPW | 12/10/2018 | 122.4 | 122.4 | 122.4 | ER | 0 | 0 | 0 | Solar | Altus Junction 138kV | 9/27/2015 | 1/9/2019 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-084 | IFS-2015-002-22 | Harmon | OK | AEPW | 12/10/2018 | 51.3 | 51.3 | 51.3 | ER | 0 | 0 | 0 | Solar | Hollis 138 kV Substation | 9/30/2015 | 1/15/2019 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-083 | IFS-2015-002-17 | Sumner | KS | WERE | 12/31/2017 | 125 | 125 | 125 | ER | 0 | 0 | 0 | Wind | Belle Plain 138 kV Substation | 9/30/2015 | 10/12/2018 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-082 | IFS-2016-001-28 | DISIS-2016-001-3 | 05 SOUTHWEST | Beaver | OK | OKGE | 12/1/2017 | 11/25/2020 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Beaver County - Woodward EHV Dbl Ckt (Badger) 345kV | 9/28/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-081 | IFS-2015-002-04 | Dewey | OK | OKGE | 7/1/2018 | 180 | 180 | 180 | ER/NR | 0 | 0 | 0 | Wind | Tatonga-Woodward 345 kV (proposed substation for GEN-2011-051) | 9/24/2015 | 6/15/2017 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-080 | IFS-2015-002-29 | Lea County | NM | SWPS | 5/1/2019 | 129.2 | 129.2 | 129.2 | ER | 0 | 0 | 0 | Solar | Hobbs-Yoakum 230kV | 9/22/2015 | 1/3/2019 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-079 | IFS-2015-002-28 | Lea County | NM | SWPS | 10/1/2018 | 129.2 | 129.2 | 129.2 | ER | 0 | 0 | 0 | Solar | Hobbs-Yoakum 230kV | 9/22/2015 | 1/3/2019 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-078 | Denver City | TX | SWPS | 12/31/2016 | 50.1 | 50.1 | 50.1 | ER/NR | 0 | 0 | 0 | Solar | Mustang 115kV | 9/25/2015 | 7/30/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-077 | Hockley County | TX | SWPS | 12/1/2017 | 80 | 80 | 80 | ER/NR | 0 | 0 | 0 | Solar | Tap Terry – Clauene 115kV transmission line approximately 5 miles South of Clauene | 9/29/2015 | 4/22/2016 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-076 | IFS-2015-002-35 | DISIS-2015-002-7 | Cedar County | NE | NPPD | 7/31/2017 | 12/31/2020 | 158.4 | 158.4 | 158.4 | ER | 0 | 0 | 0 | Wind | Belden 115kv Substation | 9/30/2015 | WITHDRAWN | N/A | ||||||||||
| GEN-2015-075 | IFS-2015-002-30 | Hockley County | TX | SWPS | 12/1/2018 | 51.5 | 51.5 | 51.5 | ER | 0 | 0 | 0 | Solar | Carlisle 69kV Substation | 9/30/2015 | 1/3/2019 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-074 | Nemaha County | KS | WERE | 12/1/2017 | 174 | 174 | 174 | ER/NR | 0 | 0 | 0 | Wind | Tap on the JEC-Hoyt 345kV line (approximately 10 miles from JEC) | 9/28/2015 | 4/26/2016 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-073 | IFS-2015-002-20 | DISIS-2015-002-7 | 03 CENTRAL | Lyon County | KS | WERE | 12/31/2018 | 12/19/2019 | 200.1 | 200.1 | 200.1 | ER/NR | 0 | 0 | 0 | Wind | Emporia 345kV | 9/28/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-072 | Ellis County | KS | MIDW | 12/1/2018 | 20.9 | 20.9 | 20.9 | ER/NR | 0 | 0 | 0 | Solar | South Hays 230 kV Substation | 10/9/2015 | 3/17/2016 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-071 | IFS-2015-002-26 | DISIS-2015-002-7 | Beckham / Roger Mills County | OK | AEPW | 9/30/2017 | 12/31/2021 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Chisholm 345kV | 10/9/2015 | 9/6/2019 | TERMINATED | N/A | |||||||||
| GEN-2015-070 | Floyd County | TX | AEPW | 12/10/2019 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Solar | Oklaunion-Lawton Eastside 345 kV | 10/9/2015 | 1/13/2016 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-069 | IFS-2015-002-06 | DISIS-2015-002-7 | 03 CENTRAL | Dickenson / Marion Counties | KS | WERE | 12/1/2017 | 12/17/2018 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | Union Ridge 230kV | 9/21/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-068 | IFS-2015-002-34 | Hale County | TX | SWPS | 12/1/2017 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | TUCO 345kV | 10/7/2015 | 12/27/2018 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-067 | IFS-2015-002-39 | Noble County | OK | OKGE | 10/1/2017 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Solar | Sooner 138 kV Substation | 10/7/2015 | 6/1/2017 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-066 | IFS-2015-002-38 | DISIS-2015-002-7 | 04 SOUTHEAST | Roosevelt County | OK | OKGE | 12/1/2017 | 12/31/2022 | 248.4 | 248.4 | 248.4 | ER | 0 | 0 | 0 | Wind | Sooner - Cleveland 345kV | 10/7/2015 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2015-065 | IFS-2015-002-19 | DISIS-2015-002-7 | 03 CENTRAL | Thomas County | KS | SUNC | 11/1/2017 | 7/1/2019 | 202.4 | 202.4 | 202.4 | ER | 0 | 0 | 0 | Wind | Mingo 345kV | 10/7/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-064 | IFS-2015-002-18 | DISIS-2015-002-7 | 03 CENTRAL | Thomas County | KS | SUNC | 11/1/2017 | 3/26/2020 | 197.8 | 197.8 | 197.8 | ER | 0 | 0 | 0 | Wind | Mingo 115kV | 10/7/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-063 | IFS-2015-002-16 | DISIS-2015-002-7 | 04 SOUTHEAST | Kingfisher County | OK | OKGE | 12/1/2017 | 1/1/2018 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | Woodring-Matthewson 345kV | 10/6/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-062 | IFS-2015-002-15 | DISIS-2015-002-7 | 04 SOUTHEAST | Garfield County | OK | OKGE | 3/1/2016 | 12/31/2021 | 4.5 | 4.5 | 4.5 | ER | 0 | 0 | 0 | Wind | Breckinridge 138kV | 10/6/2015 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2015-061 | IFS-2015-002-14 | Logan/Thomas Counties | KS | SUNC | 12/31/2018 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Mingo 345kV | 10/6/2015 | 5/31/2017 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-060 | IFS-2015-002-13 | Ellis County | OK | OKGE | 12/31/2021 | 250.5 | 250.5 | 250.5 | ER | 0 | 0 | 0 | Wind | Woodward 138kV Substation | 10/6/2015 | 6/14/2017 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-059 | IFS-2015-002-01 | Grady County | OK | OKGE | 2/1/2016 | 6.3 | 6.3 | 6.3 | ER | 0 | 0 | 0 | Wind | Minco 345 kV Substation | 10/6/2015 | 8/29/2016 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-058 | IFS-2015-002-42 | Eddy County | NM | SWPS | 10/1/2017 | 50 | 50 | 50 | ER | 0 | 0 | 0 | Solar | Atoka 115kV | 10/6/2015 | 11/6/2018 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-057 | IFS-2015-002-33 | DISIS-2015-002-7 | 04 SOUTHEAST | Grady County | OK | OKGE | 12/1/2016 | 12/22/2018 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | Minco 345kV | 10/6/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-056 | IFS-2015-002-40 | DISIS-2015-002-7 | Roosevelt County | NM | SWPS | 12/1/2017 | 12/1/2020 | 101.2 | 101.2 | 101.2 | ER | 0 | 0 | 0 | WIND | Eddy County-Tolk (Crossroads) 345kV | 10/6/2015 | 4/25/2019 | TERMINATED | N/A | |||||||||
| GEN-2015-055 | IFS-2015-002-25 | DISIS-2015-002-7 | 04 SOUTHEAST | Beckham County | OK | WFEC | 10/30/2016 | 12/1/2023 | 40 | 40 | 40 | ER | 0 | 0 | 0 | Solar | Erick 138kV Substation | 10/6/2015 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2015-054 | Antelope County | NE | NPPD | 12/31/2017 | 74 | 74 | 74 | ER/NR | 0 | 0 | 0 | Wind | Antelope 115kV Substation (Neligh East) | 10/5/2015 | 3/11/2016 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-053 | IFS-2015-002-12 | Antelope County | NE | NPPD | 12/31/2017 | 50 | 50 | 50 | ER | 0 | 0 | 0 | Wind | Antelope 115kV | 10/5/2015 | 12/11/2018 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-052 | IFS-2015-002-03 | DISIS-2015-002-7 | 03 CENTRAL | Sumner | KS | WERE | 12/1/2017 | 12/31/2022 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | Open Sky-Rose Hill 345kV | 10/5/2015 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2015-051 | Lyon County | KS | WERE | 6/1/2019 | 916 | 908.5 | 916 | ER/NR | 0 | 0 | 0 | Thermal | CT | 10/5/2015 | 1/29/2016 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-050 | Lyon County | KS | WERE | 6/1/2019 | 464 | 454.3 | 458 | ER/NR | 0 | 0 | 0 | Thermal | CT | New 345kV Substation on the Emporia-Wichita 345kV line | 10/5/2015 | 4/5/2017 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-049 | Dewey County | OK | OKGE | 12/31/2018 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Primary: Tatonga - Woodward 345kV line | 10/5/2015 | 2/4/2016 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-048 | IFS-2015-002-11 | DISIS-2015-002-7 | 04 SOUTHEAST | Major County, OK | OK | OKGE | 12/1/2017 | 4/14/2021 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Cleo Corner 138kV | 10/5/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-047 | IFS-2015-002-02 | DISIS-2015-002-7 | 04 SOUTHEAST | Noble County | OK | OKGE | 12/1/2017 | 1/1/2018 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | Sooner 345kV | 10/5/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-046 | IFS-2015-002-46 | DISIS-2015-002-7 | 01 NORTH | Williams County | ND | BEPC | 12/1/2017 | 5/27/2021 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | Tande 345kV | 10/5/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-045 | IFS-2015-002-10 | DISIS-2015-002-7 | 04 SOUTHEAST | Grady County | OK | AEPW | 12/1/2017 | 12/12/2019 | 20 | 20 | 20 | ER | 0 | 0 | 0 | Battery/Storage | Lawton East Side-Sunnyside (Terry Road) 345kV | 10/5/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-044 | Caddo and Canadian Counties | OK | OKGE | 12/1/2017 | 20 | 20 | 20 | ER/NR | 0 | 0 | 0 | Battery/Storage | Minco 345kV Substation | 10/5/2015 | 3/17/2016 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-043 | Pratt County | KS | WERE | 12/1/2017 | 20 | 20 | 20 | ER/NR | 0 | 0 | 0 | Battery/Storage | Proposed 345kV Substation on the Wichita to Thistle 345kV line, circuits 1 & 2 | 10/5/2015 | 3/16/2016 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-042 | IFS-2015-002-09 | Dixon County | NE | NPPD | 12/1/2017 | 320 | 320 | 320 | ER/NR | 0 | 0 | 0 | Wind | Hoskins - Twin Church 230kV | 10/5/2015 | 6/13/2016 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-041 | IFS-2015-002-41 | DISIS-2016-001 | 05 SOUTHWEST | Hale County | TX | SWPS | 7/1/2015 | 10/19/2019 | 5 | 5 | 0 | ER | 0 | 0 | 0 | Thermal | CT | TUCO 345kV | 9/30/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||
| GEN-2015-040 | Yoakum County | TX | SWPS | 12/31/2016 | 50.1 | 50.1 | 50.1 | ER/NR | 0 | 0 | 0 | Solar | Mustang 230kV | 9/30/2015 | 7/30/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-039 | Deaf Smith County | TX | SWPS | 12/31/2016 | 50.1 | 50.1 | 50.1 | ER/NR | 0 | 0 | 0 | Solar | Deaf Smith-Plant X 230kV | 9/30/2015 | 7/30/2018 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-038 | Canadian County | OK | OKGE | 12/31/2017 | 303.6 | 303.6 | 303.6 | ER | 0 | 0 | 0 | Wind | Cimarron 345kV Substation | 9/30/2015 | 1/5/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-037 | Hale County | TX | SWPS | 6/1/2018 | 253 | 253 | 253 | ER | 0 | 0 | 0 | Solar | TUCO 345kV substation | 9/23/2015 | 4/19/2016 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-036 | IFS-2016-001-44 | DISIS-2016-001-3 | 04 SOUTHEAST | Johnston County | OK | OKGE | 12/31/2017 | 12/13/2020 | 303.6 | 303.6 | 303.6 | ER | 0 | 0 | 0 | Wind | Johnston County 345kV | 9/10/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-035 | Ponca | OK | OKGE | 9/1/2018 | 22 | 22 | 22 | ER | 0 | 0 | 0 | Thermal | Steam Turbine | Primary - Osage Substation ½ mile south (bus #514742) | 9/10/2015 | 2/4/2016 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-034 | IFS-2015-002-08 | DISIS-2015-002-7 | 04 SOUTHEAST | Kay County | OK | OKGE | 10/31/2017 | 12/10/2020 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Rose Hill (Open Sky)-Sooner (Ranch Road) 345kV | 8/28/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-033 | Floyd | TX | SWPS | 12/31/2017 | 152 | 152 | 152 | ER/NR | 0 | 0 | 0 | Wind | Tap Tuco - Oklaunion 345kV | 6/26/2015 | 3/27/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-032 | Swisher | TX | SWPS | 9/1/2017 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Wind | Tulia 115 kV/Newhart 230 kV | 6/29/2015 | 10/2/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-031 | IFS-2015-002-27 | Swisher | TX | SWPS | 9/1/2017 | 150.5 | 150.5 | 150.5 | ER | 0 | 0 | 0 | Wind | Swisher 230kV | 6/29/2015 | 7/30/2018 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-030 | IFS-2015-001-09 | Noble County | OK | OKGE | 12/1/2017 | 11/1/2017 | 200.1 | 200.1 | 200.1 | ER | 0 | 0 | 0 | Wind | Sooner 345kV | 3/19/2015 | 3/16/2018 | TERMINATED | N/A | ||||||||||
| GEN-2015-029 | IFS-2015-001-12 | DISIS-2015-001-4 | Dewey & Blaine County | OK | OKGE | 12/1/2016 | 12/1/2020 | 161 | 161 | 161 | ER | 0 | 0 | 0 | Wind | Tatonga 345kV | 3/31/2015 | TERMINATED | N/A | ||||||||||
| GEN-2015-028 | IFS-2015-001-10 | Kay | OK | OKGE | 3/1/2016 | 3 | 3 | 3 | ER | 0 | 0 | 0 | Wind | Nardins 69kV | 4/1/2015 | 6/21/2016 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-027 | IFS-2015-001-11 | Gray County | KS | SUNCMKEC | 3/1/2016 | 4.9 | 4.9 | 4.9 | ER | 0 | 0 | 0 | Wind | Crooked Creek 115kV | 4/1/2015 | 8/16/2016 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-026 | Gray County | KS | SUNC | 3/1/2016 | 8.3 | 8.3 | 8.3 | ER | 0 | 0 | 0 | Wind | Buckner 345kV | 4/1/2015 | 8/3/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-025 | IFS-2015-001-03 | DISIS-2015-001-4 | 03 CENTRAL | Pratt | KS | WERE | 12/31/2016 | 12/19/2016 | 220 | 220 | 220 | ER | 0 | 0 | 0 | Wind | Tap Thistle – Wichita 345kV Dbl CKT | 3/26/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-024 | IFS-2015-001-02 | DISIS-2015-001-4 | 03 CENTRAL | Pratt County | KS | WERE | 12/31/2016 | 12/9/2016 | 220 | 220 | 220 | ER | 0 | 0 | 0 | Wind | Thistle-Wichita Dbl Ckt (Buffalo Flats) 345kV | 3/26/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-023 | IFS-2015-001-08 | DISIS-2015-001-4 | 02 NEBRASKA | Antelope & Wheeler County | NE | NPPD | 12/31/2019 | 4/1/2024 | 300.7 | 300.7 | 300.7 | ER/NR | 0 | 0 | 0 | Wind | Grand Prairie-Grand Island (Holt County NE) 345kV | 3/31/2015 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2015-022 | IFS-2015-001-19 | Randall County | TX | SWPS | 12/1/2016 | 112 | 112 | 112 | ER | 0 | 0 | 0 | Solar | Swisher 115kV | 3/30/2015 | 10/12/2018 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-021 | IFS-2015-001-16 | DISIS-2015-001-4 | 03 CENTRAL | Stanton | KS | SUNC | 12/31/2016 | 4/7/2020 | 20 | 20 | 20 | ER/NR | 0 | 0 | 0 | Solar | Johnson Corner 115kV | 4/1/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-020 | IFS-2015-002-07 | DISIS-2015-002-7 | Roosevelt County | NM | SWPS | 12/1/2016 | 12/1/2021 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Solar | Oasis 115kV | 3/31/2015 | 3/11/2020 | TERMINATED | N/A | |||||||||
| GEN-2015-019 | Franklin County | AR | AEPW | 1/1/2017 | 60 | 60 | 60 | ER/NR | 0 | 0 | 0 | Thermal | CT | Fitzhugh 161kV | 3/31/2015 | 8/10/2015 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-018 | Farwell County | NM | SWPS | 12/31/2016 | 80 | 80 | 80 | ER/NR | 0 | 0 | 0 | Wind | Tap Curry County - Bailey 115 kV | 3/31/2015 | 3/30/2017 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-017 | IFS-2015-001-07 | Thomas County | KS | SUNC | 8/1/2018 | 172 | 155 | 172 | ER/NR | 0 | 0 | 0 | Thermal | Gas | Mingo 115kV | 3/31/2015 | 1/21/2016 | WITHDRAWN | N/A | ||||||||||
| GEN-2015-016 | IFS-2015-001-05 | DISIS-2015-001-4 | 03 CENTRAL | Allen County | KS | KCPL | 12/31/2017 | 9/11/2019 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Tap Marmaton - Centerville 161kV | 3/20/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-015 | IFS-2015-001-14 | DISIS-2015-001-4 | 04 SOUTHEAST | Grant County | OK | OKGE | 7/31/2016 | 12/8/2017 | 154.56 | 154.56 | 154.56 | ER/NR | 0 | 0 | 0 | Wind | Tap Medford Tap – Coyote 138kV | 3/27/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-014 | IFS-2015-001-20 | DISIS-2015-001-4 | 05 SOUTHWEST | Cochran County | TX | SWPS | 12/1/2016 | 12/15/2018 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | Tap Cochran - Lehman 115kV substation | 3/31/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-013 | IFS-2015-001-18 | DISIS-2015-001-4 | 04 SOUTHEAST | Kiowa County | OK | WFEC | 12/1/2016 | 12/1/2022 | 120 | 120 | 120 | ER/NR | 0 | 0 | 0 | Solar | Snyder 138kV | 3/31/2015 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2015-012 | Lincoln County | CO | SUNC | 1/1/2017 | 300.13 | 300.13 | 300.13 | ER/NR | 0 | 0 | 0 | Wind | Mingo 345kV | 3/26/2015 | 9/28/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-011 | Thomas County | KS | SUNC | 8/1/2018 | 172 | 155 | 172 | ER/NR | 0 | 0 | 0 | Thermal | Gas | Mingo 115kV | 3/31/2015 | 8/24/2015 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-010 | Roosevelt County | NM | SWPS | 12/1/2017 | 250.7 | 250.7 | 250.7 | ER | 0 | 0 | 0 | Wind | Tap South Roosevelt – Tolk 230kV | 3/31/2015 | 10/22/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-009 | Chaves County | NM | SWPS | 9/1/2020 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Wind | Hobbs 230kV | 3/31/2015 | 9/22/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-008 | Antelope County | NE | NPPD | 12/1/2016 | 150.4 | 150.4 | 150.4 | ER/NR | 0 | 0 | 0 | Wind | Antelope 115kV | 3/30/2015 | 10/1/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2015-007IS | 2 | 2 | 2 | 0 | 0 | 0 | Hydro | 11/25/2015 | 4/18/2016 | WITHDRAWN | N/A | ||||||||||||||||||
| GEN-2015-007 | IFS-2015-001-01 | DISIS-2015-001-4 | 02 NEBRASKA | Wayne County | NE | NPPD | 11/8/2019 | 12/31/2019 | 160 | 160 | 160 | ER | 0 | 0 | 0 | Wind | Hoskins 345kV | 3/25/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-006 | DISIS-2015-001 | Ochiltree County | TX | OKGE | 12/31/2017 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | Beaver County 345 kV | 3/23/2015 | 9/24/2015 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-005 | IFS-2015-001-04 | DISIS-2015-001-4 | 03 CENTRAL | DeKalb County | MO | GMO | 12/31/2017 | 12/16/2016 | 200.1 | 200.1 | 200.1 | ER | 0 | 0 | 0 | Wind | Mullen Creek-Sibley (Ketchum) 345kV | 3/25/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2015-004IS | 8 | 8 | 8 | 0 | 0 | 0 | Hydro | 11/25/2015 | 4/18/2016 | WITHDRAWN | N/A | ||||||||||||||||||
| GEN-2015-004 | IFS-2015-001-13 | DISIS-2015-001-4 | Beckham County | OK | OKGE | 5/15/2017 | 7/31/2020 | 52.9 | 52.9 | 52.9 | ER | 0 | 0 | 0 | Wind | Border 345kV | 3/18/2015 | 8/19/2020 | TERMINATED | N/A | |||||||||
| GEN-2015-003 | DISIS-2015-001 | Grant County | OK | OKGE | 12/31/2017 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Renfrow 345kV | 3/18/2015 | 7/31/2015 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-002 | DISIS-2015-001 | Canadian County | OK | OKGE | 9/29/2018 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Solar | Cimarron 345kV Substation | 3/24/2015 | 5/8/2015 | WITHDRAWN | N/A | |||||||||||
| GEN-2015-001 | IFS-2015-001-15 | DISIS-2015-001-4 | 04 SOUTHEAST | Kay | OK | OKGE | 12/31/2016 | 12/19/2016 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Rose Hill (Open Sky)-Sooner (Ranch Road) 345kV | 3/4/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2014-074 | IFS-2015-001-17 | Floyd | TX | SWPS | 10/31/2017 | 152 | 152 | 152 | ER | 0 | 0 | 0 | Wind | Tap Tuco Interchange - Oklaunion 345kV | 12/17/2014 | 5/26/2017 | WITHDRAWN | N/A | |||||||||||
| GEN-2014-073 | Hale | TX | SWPS | 11/1/2015 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | North Plainview 115 kV/Swisher 230 kV | 12/17/2014 | 4/7/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-072 | Rush | KS | MIDW | 12/31/2017 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Spearville – Post Rock 345 kV | 12/11/2014 | 4/7/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-071 | Stanton | KS | SUNC | 20 | 20 | 20 | ER/NR | 0 | 0 | 0 | Solar | Johnson Corner 115kV | 9/30/2014 | 2/23/2015 | WITHDRAWN | N/A | |||||||||||||
| GEN-2014-070 | IFS-2014-002-26 | Lea | NM | SWPS | 10/1/2016 | 113 | 113 | 113 | ER | 0 | 0 | 0 | Solar | Tap Hobbs - Yoakum 230kV | 9/29/2014 | 6/1/2015 | WITHDRAWN | N/A | |||||||||||
| GEN-2014-069 | Eddy | NM | SWPS | 10/1/2016 | 90 | 90 | 90 | ER/NR | 0 | 0 | 0 | Solar | Tap Potash Junction - Livingston Ridge 115kV | 9/29/2014 | 3/30/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-068 | Deaf Smith | TX | SWPS | 3/1/2019 | 203 | 196 | 203 | ER/NR | 0 | 0 | 0 | Thermal | CT | Tap Deaf Smith - Plant X 230 kV line | 9/30/2014 | 9/1/2015 | WITHDRAWN | N/A | |||||||||||
| GEN-2014-067 | Deaf Smith | TX | SWPS | 3/1/2019 | 356 | 339 | 356 | ER | 0 | 0 | 0 | Thermal | CC | Tap Potter County - New Hart 230kV | 9/30/2014 | 2/27/2015 | WITHDRAWN | N/A | |||||||||||
| GEN-2014-066 | IFS-2014-002-25 | Quay | NM | SWPS | 12/1/2016 | 30 | 30 | 30 | ER/NR | 0 | 0 | 0 | Solar | Norton 115kV | 9/25/2014 | 9/28/2015 | WITHDRAWN | N/A | |||||||||||
| GEN-2014-065 | Lea | NM | SWPS | 12/31/2016 | 99 | 99 | 99 | ER/NR | 0 | 0 | 0 | Solar | Whitten 115kV | 9/30/2014 | 10/22/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-064 | IFS-2014-002-24 | DISIS-2014-002-6 | 04 SOUTHEAST | Garfield | OK | OKGE | 12/1/2016 | 12/21/2018 | 248.4 | 248.4 | 248.4 | ER | 0 | 0 | 0 | Wind | Otter 138kV | 9/30/2014 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2014-063 | IFS-2014-002-23 | Chaves | NM | SWPS | 9/1/2016 | 120 | 120 | 120 | ER/NR | 0 | 0 | 0 | Wind | Hobbs 230kV | 9/30/2014 | 6/4/2015 | WITHDRAWN | N/A | |||||||||||
| GEN-2014-062 | Roosevelt | OK | SWPS | 12/1/2016 | 200.1 | 200.1 | 200.1 | ER | 0 | 0 | 0 | Wind | Tap Tolk - Eddy County (Crossroads) 345kV | 9/30/2014 | 3/30/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-061 | Blaine | OK | OKGE | 12/1/2016 | 161 | 161 | 161 | ER | 0 | 0 | 0 | Wind | Tatonga 345kV | 9/30/2014 | 3/30/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-060 | Webster | NE | NPPD | 12/31/2015 | 125.8 | 125.8 | 125.8 | ER/NR | 0 | 0 | 0 | Wind | Tap Pauline – Hildreth (Rosemont) 115kV | 9/30/2014 | 10/2/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-059 | Keith | NE | NPPD | 9/1/2016 | 160 | 160 | 160 | ER/NR | 0 | 0 | 0 | Wind | Tap Sidney - Ogallala 230kV line | 9/30/2014 | 3/17/2016 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-058 | Blaine | OK | 12/31/2016 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | Tap Tatonga - Mathewson 345kV | 9/29/2014 | 3/2/2015 | WITHDRAWN | N/A | |||||||||||||
| GEN-2014-057 | IFS-2014-002-22 | DISIS-2014-002-6 | 04 SOUTHEAST | Grady | OK | AEPW | 12/31/2016 | 12/1/2016 | 249.9 | 249.9 | 249.9 | ER | 0 | 0 | 0 | Wind | Lawton East Side-Sunnyside (Terry Road) 345kV | 9/29/2014 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2014-056 | IFS-2014-002-21 | DISIS-2014-002-6 | 04 SOUTHEAST | Canadian | OK | OKGE | 12/31/2016 | 12/22/2018 | 250 | 250 | 250 | ER | 0 | 0 | 0 | Wind | Minco 345kV | 9/29/2014 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2014-055 | Wayne | NE | NPPD | 12/31/2016 | 160 | 160 | 160 | ER | 0 | 0 | 0 | Wind | Belden 115kV | 9/29/2014 | 3/2/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-054 | IFS-2014-002-20 | Hockley | TX | SWPS | 12/31/2016 | 120 | 120 | 120 | ER | 0 | 0 | 0 | Wind | Carlisle 230kV | 9/29/2014 | 1/6/2016 | WITHDRAWN | N/A | |||||||||||
| GEN-2014-053 | IFS-2014-002-19 | Hockley | TX | SWPS | 12/31/2016 | 80 | 80 | 80 | ER | 0 | 0 | 0 | Wind | Carlisle 230kV | 9/29/2014 | 1/6/2016 | WITHDRAWN | N/A | |||||||||||
| GEN-2014-052 | Beaver | OK | OKGE | 12/31/2016 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Tap Hitchland - Woodward Dbl Ckt (GEN-2011-014 Tap) 345kV | 9/29/2014 | 3/2/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-051 | IFS-2014-002-18 | Nemaha | KS | WERE | 12/31/2016 | 174 | 174 | 174 | ER | 0 | 0 | 0 | Wind | Jeffrey Energy Center 345kV | 9/29/2014 | 9/24/2015 | WITHDRAWN | N/A | |||||||||||
| GEN-2014-050 | Douglas | KS | WERE | 12/31/2016 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | Swissvale 345kV | 9/29/2014 | 3/2/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-049 | IFS-2014-002-17 | Pratt | KS | MKEC | 12/31/2016 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Thistle 345kV | 9/29/2014 | 11/12/2015 | WITHDRAWN | N/A | |||||||||||
| GEN-2014-048 | Chaves | NM | SWPS | 10/1/2016 | 110 | 110 | 110 | ER/NR | 0 | 0 | 0 | Solar | Tap Eddy County - Tweedy 115kV | 9/30/2014 | 10/24/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-047 | IFS-2014-002-16 | Roosevelt | NM | SWPS | 12/1/2016 | 10/1/2017 | 40 | 40 | 40 | ER | 0 | 0 | 0 | Solar | Tap Tolk - Eddy County (Crossroads) 345kV | 9/30/2014 | 4/6/2018 | WITHDRAWN | N/A | ||||||||||
| GEN-2014-046 | Chaves | NM | SWPS | 5/1/2016 | 125.4 | 125.4 | 125.4 | ER/NR | 0 | 0 | 0 | Solar | Chaves County 115kV | 9/30/2014 | 3/23/2016 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-045 | Grant | KS | SUNC | 12/31/2016 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Solar | Hickok 115kV Sub | 9/29/2014 | 11/6/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-044 | Terry | TX | SWPS | 12/31/2016 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Solar | Terry County 115kV; (Alt. POI) Tap Clauene - Terry County 115kV | 9/29/2014 | 2/9/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-043 | Gaines | TX | SWPS | 12/31/2016 | 80 | 80 | 80 | ER/NR | 0 | 0 | 0 | Solar | Seagraves 115kV Sub | 9/29/2014 | 2/9/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-042 | Hockley | TX | SWPS | 12/31/2016 | 50 | 50 | 50 | ER/NR | 0 | 0 | 0 | Solar | Clauene 115kV; (Alt. POI) Tap Clauene - Terry County 115kV | 9/29/2014 | 2/9/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-041 | IFS-2014-002-15 | Ness | KS | SUNC | 3/31/2016 | 2/27/2018 | 120.8 | 120.8 | 120.8 | ER | 0 | 0 | 0 | Wind | Arnold 115kV | 9/30/2014 | 9/23/2017 | WITHDRAWN | N/A | ||||||||||
| GEN-2014-040 | IFS-2014-002-14 | DISIS-2014-002-6 | 05 SOUTHWEST | Castro | TX | SWPS | 9/1/2016 | 12/30/2016 | 320 | 320 | 320 | ER | 0 | 0 | 0 | Wind | Castro 115kV | 9/26/2014 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2014-039 | IFS-2014-002-13 | DISIS-2014-002-6 | 02 NEBRASKA | Saline | NE | NPPD | 12/1/2016 | 7/1/2021 | 73.4 | 73.4 | 73.4 | ER/NR | 0 | 0 | 0 | Wind | Friend 115kV | 9/29/2014 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2014-038 | Hansford | TX | SWPS | 9/30/2017 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Tap Hitchland – Potter County 345 kV | 9/30/2014 | 3/29/2016 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-037 | IFS-2015-002-24 | Texas | OK | SWPS | 9/30/2017 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Beaver County-Hitchland Dbl Ckt (Optima) 345kV | 9/30/2014 | 1/16/2019 | WITHDRAWN | N/A | |||||||||||
| GEN-2014-036 | Harmon | OK | AEPW | 12/31/2016 | 50 | 0 | 0 | ER | 0 | 0 | 0 | Solar | Hollis 138kV | 9/29/2014 | 3/2/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-035 | IFS-2014-002-12 | DISIS-2014-002-6 | 05 SOUTHWEST | Chaves | NM | SWPS | 12/31/2016 | 6/1/2018 | 30 | 30 | 30 | ER | 0 | 0 | 0 | Solar | Chaves County 115kV | 9/29/2014 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2014-034 | IFS-2014-002-11 | DISIS-2014-002-6 | 05 SOUTHWEST | Chaves | NM | SWPS | 12/31/2016 | 10/21/2016 | 70 | 70 | 70 | ER | 0 | 0 | 0 | Solar | Chaves County 115kV | 9/29/2014 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2014-033 | IFS-2014-002-10 | DISIS-2014-002-6 | 05 SOUTHWEST | Chaves | NM | SWPS | 12/31/2016 | 8/25/2016 | 70 | 70 | 70 | ER | 0 | 0 | 0 | Solar | Chaves County 115kV | 9/29/2014 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2014-032 | IFS-2014-002-09 | DISIS-2014-002-6 | 02 NEBRASKA | Antelope | NE | NPPD | 10/1/2015 | 5/1/2014 | 10.2 | 10.2 | 10.2 | ER/NR | 0 | 0 | 0 | Wind | Meadow Grove 230kV | 9/29/2014 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2014-031 | IFS-2014-002-08 | DISIS-2014-002-6 | 02 NEBRASKA | Antelope County | NE | NPPD | 10/1/2015 | 3/30/2016 | 35.8 | 35.8 | 35.8 | ER/NR | 0 | 0 | 0 | Wind | Meadow Grove 230kV | 9/26/2014 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2014-030 | Lea County | NM | SWPS | 10/1/2016 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Solar | Roadrunner 345kV | 9/25/2014 | 2/5/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-029 | Hale | TX | SWPS | 12/31/2016 | 108.8 | 108.8 | 108.8 | ER/NR | 0 | 0 | 0 | Solar | Cimarron Antelope 230 kV Sub | 9/25/2014 | 10/2/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-028 | IFS-2014-002-07 | DISIS-2014-002-6 | 03 CENTRAL | Cherokee County | KS | EDE | 1/1/2016 | 4/1/2016 | 50 | 0 | 50 | ER | 0 | 0 | 0 | Thermal | CC | Riverton 161kV | 9/25/2014 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||
| GEN-2014-027 | Okfuskee County | OK | AEPW | 6/1/2016 | 60 | 60 | 60 | ER/NR | 0 | 0 | 0 | Thermal | CT | Weleetka 138kV | 9/24/2014 | 2/25/2015 | WITHDRAWN | N/A | |||||||||||
| GEN-2014-026 | IFS-2014-002-06 | Beaver County | OK | OKGE | 12/31/2016 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | Beaver County 345kV | 9/25/2014 | 2/17/2016 | WITHDRAWN | N/A | |||||||||||
| GEN-2014-025 | IFS-2014-002-05 | DISIS-2014-002-6 | 03 CENTRAL | Rush | KS | MIDW | 10/15/2015 | 12/1/2015 | 2.42 | 2.42 | 2.42 | ER | 0 | 0 | 0 | Wind | Tap Nekoma - Bazine (Walnut Creek) 69kV | 9/25/2014 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2014-024 | Lea | NM | SWPS | 10/1/2016 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Solar | Cunningham 230kV Sub | 9/23/2014 | 2/5/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-023 | Knox | NE | NPPD | 12/31/2015 | 79.9 | 79.9 | 79.9 | ER/NR | 0 | 0 | 0 | Wind | Tap Fort Randall – Meadow Grove 230kV | 9/9/2014 | 9/2/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-022 | Kay | OK | OKGE | 12/31/2015 | 15 | 15 | 15 | ER | 0 | 0 | 0 | Wind | Open Sky 345kV | 9/5/2014 | 2/25/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-021 | IFS-2014-002-04 | DISIS-2014-002-6 | 03 CENTRAL | Atchison | MO | GMO | 12/1/2016 | 11/7/2017 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Wind | Nebraska City-Mullen Creek (Holt County MO) 345kV | 9/2/2014 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2014-020 | IFS-2014-002-03 | DISIS-2014-002-6 | 04 SOUTHEAST | Grady | OK | AEPW | 12/31/2014 | 10/10/2017 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Wind | Tuttle 138kV | 7/14/2014 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2014-019 | Ochiltree | TX | OKGE | 12/31/2014 | 15 | 15 | 15 | ER/NR | 0 | 0 | 0 | Wind | Beaver County 345 kV | 7/8/2014 | 3/2/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-018 | Nacogdoches | TX | AEPW | 6/1/2018 | 756.8 | 704 | 756.8 | ER/NR | 0 | 0 | 0 | Thermal | CT | Tenaska - Crockett 345kV | 6/27/2014 | 4/7/2015 | WITHDRAWN | N/A | |||||||||||
| GEN-2014-017 | Nacogdoches | TX | AEPW | 6/1/2018 | 477 | 477 | 527 | 0 | 0 | 0 | Thermal | CT | Tenaska - Crockett 345kV | 6/27/2014 | 9/26/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-016 | Nacogdoches | TX | AEPW | 6/1/2018 | 227 | 227 | 229 | ER/NR | 0 | 0 | 0 | Thermal | CT | Tenaska - Crockett 345kV | 6/27/2014 | 9/26/2014 | WITHDRAWN | N/A | |||||||||||
| GEN-2014-015 | Lincoln | CO | SUNC | 1/1/2016 | 300.1 | 300.1 | 300.1 | ER/NR | 0 | 0 | 0 | Wind | Mingo 345kV | 6/27/2014 | 10/24/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-014 | Pontotoc | OK | OKGE | 12/31/2017 | 149.5 | 149.5 | 149.5 | ER/NR | 0 | 0 | 0 | Wind | Blue River 138 kV | 6/20/2014 | 9/25/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-013 | IFS-2014-001-07 | DISIS-2014-001-1 | 02 NEBRASKA | Antelope / Boone | NE | NPPD | 12/31/2014 | 12/18/2015 | 73.5 | 73.5 | 73.5 | ER/NR | 0 | 0 | 0 | Wind | Meadow Grove 230kV | 3/31/2014 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2014-012 | IFS-2014-001-06 | Gaines | TX | SWPS | 6/1/2018 | 5/1/2018 | 225 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | Tap Hobbs Interchange - Andrews 230kV | 3/31/2014 | 5/30/2018 | WITHDRAWN | N/A | |||||||||
| GEN-2014-011 | McPherson | KS | WERE | 12/31/2016 | 172 | 172 | 172 | ER/NR | 0 | 0 | 0 | Thermal | Gas | Tap Reno - Summit 345kV | 3/31/2014 | 8/13/2014 | WITHDRAWN | N/A | |||||||||||
| GEN-2014-010 | Deaf Smith | TX | SWPS | 12/31/2016 | 129.6 | 129.6 | 129.6 | ER/NR | 0 | 0 | 0 | Wind | Deaf Smith 115kV | 3/31/2014 | 10/1/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-009 | Bailey | TX | SWPS | 12/31/2016 | 83.7 | 83.7 | 83.7 | ER/NR | 0 | 0 | 0 | Wind | Lariat 69kV | 3/31/2014 | 10/1/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-008 | Lea | NM | SWPS | 11/15/2018 | 300 | 300 | 300 | ER/NR | 0 | 0 | 0 | Wind | Eddy Co. - Tolk 345kV | 3/31/2014 | 4/7/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-007 | Floyd | TX | SWPS | 12/15/2016 | 400 | 400 | 400 | ER | 0 | 0 | 0 | Wind | Tap TUCO Interchange - Border 345kV | 3/31/2014 | 2/18/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-006 | Jefferson | NE | NPPD | 10/31/2016 | 74.9 | 74.9 | 74.9 | ER/NR | 0 | 0 | 0 | Wind | Harbine 115kV | 3/24/2014 | 8/13/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2014-005 | IFS-2014-001-05 | DISIS-2014-001-1 | 04 SOUTHEAST | Caddo | OK | OKGE | 6/1/2015 | 5.7 | 5.7 | 5.7 | ER | 0 | 0 | 0 | Wind | Minco 345kV | 2/19/2014 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2014-004IS | IFS-2015-001-22 | Billings | ND | BEPC | 10/1/2016 | 12/1/2018 | 383 | 383 | 383 | ER | 0 | 0 | 0 | Wind | Charlie Creek 230kV | 11/24/2015 | 8/7/2018 | WITHDRAWN | N/A | ||||||||||
| GEN-2014-004 | IFS-2014-001-04 | DISIS-2014-001-1 | 02 NEBRASKA | Jefferson | NE | NPPD | 10/29/2013 | 4 | 4 | 4 | ER | 0 | 0 | 0 | Wind | Steele City 115kV | 2/19/2014 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2014-003 | IFS-2014-001-03 | DISIS-2014-001-1 | Blaine | OK | OKGE | 12/31/2014 | 12/31/2014 | 15.8 | 15.8 | 15.8 | ER | 0 | 0 | 0 | Wind | Tatonga 345kV | 2/19/2014 | 8/16/2019 | TERMINATED | N/A | |||||||||
| GEN-2014-002 | IFS-2014-001-02 | DISIS-2014-001-1 | 04 SOUTHEAST | Dewey | OK | OKGE | 12/31/2014 | 4/8/2015 | 10.5 | 10.5 | 10.5 | ER | 0 | 0 | 0 | Wind | Tatonga 345kV | 2/18/2014 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2014-001IS | IFS-2015-001-21 | DISIS-2015-002 Prior Queued | 01 NORTH | Butte | SD | WAPA | 12/15/2015 | 9/24/2020 | 103.24 | 103.24 | 103.24 | ER | 0 | 0 | 0 | Wind | Sulphur 115kV | 11/24/2015 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2014-001 | IFS-2014-001-08 | DISIS-2014-001-1 | 03 CENTRAL | Marion | KS | WERE | 7/15/2014 | 10/1/2021 | 200.6 | 200.6 | 200.6 | ER | 0 | 0 | 0 | Wind | Tap Wichita - Emporia Energy Center 345kV | 1/15/2014 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2013-044 | Sumner | KS | WERE | 12/31/2016 | 136 | 136 | 136 | 0 | 0 | 0 | Wind | Wichita 345 | 12/20/2013 | 2/11/2014 | WITHDRAWN | N/A | |||||||||||||
| GEN-2013-043 | Douglas | KS | WERE | 12/31/2016 | 100 | 100 | 100 | 0 | 0 | 0 | Wind | Swissvale 345kV | 12/20/2013 | 2/11/2014 | WITHDRAWN | N/A | |||||||||||||
| GEN-2013-042 | Nemaha | KS | WERE | 12/31/2016 | 173 | 173 | 173 | 0 | 0 | 0 | Wind | Jeffrey Energy Company Sub 345 | 12/20/2013 | 2/11/2014 | WITHDRAWN | N/A | |||||||||||||
| GEN-2013-041 | Rush | KS | MIDW | 12/31/2016 | 100 | 100 | 100 | 0 | 0 | 0 | Wind | Great Bend 230 | 12/20/2013 | 2/11/2014 | WITHDRAWN | N/A | |||||||||||||
| GEN-2013-040 | Butler | NE | NPPD | 12/31/2016 | 200 | 200 | 200 | 0 | 0 | 0 | Wind | Columbus East 345 | 12/20/2013 | 2/11/2014 | WITHDRAWN | N/A | |||||||||||||
| GEN-2013-039 | Wayne | NE | NPPD | 12/31/2016 | 160 | 160 | 160 | 0 | 0 | 0 | Wind | Belden 115kV | 12/20/2013 | 2/11/2014 | WITHDRAWN | N/A | |||||||||||||
| GEN-2013-038 | Canadian | OK | OKGE | 12/31/2016 | 300 | 300 | 300 | 0 | 0 | 0 | Wind | Tatonga Sub 345 | 12/20/2013 | 2/11/2014 | WITHDRAWN | N/A | |||||||||||||
| GEN-2013-037 | Grady | OK | OKGE | 12/31/2016 | 250 | 250 | 250 | 0 | 0 | 0 | Wind | Lawton Sub 345 kV | 12/20/2013 | 2/11/2014 | WITHDRAWN | N/A | |||||||||||||
| GEN-2013-036 | Delaware | OK | OKGE | 12/31/2016 | 250 | 250 | 250 | 0 | 0 | 0 | Wind | Delaware Substation 345 kv | 12/20/2013 | 2/11/2014 | WITHDRAWN | N/A | |||||||||||||
| GEN-2013-035 | IFS-2014-001-01 | Woodward | OK | OKGE | 12/31/2016 | 105.6 | 105.6 | 105.6 | ER | 0 | 0 | 0 | Wind | Tap Woodward - Tatonga 345kV (GEN-2011-051 Tap) | 12/20/2013 | 3/19/2015 | WITHDRAWN | N/A | |||||||||||
| GEN-2013-034 | Ellis | OK | OKGE | 12/31/2014 | 73.6 | 73.6 | 73.6 | ER | 0 | 0 | 0 | Wind | Tap Hitchland - Woodward Dbl Ckt (GEN-2013-034 Tap) 345kV | 9/30/2013 | 8/13/2014 | WITHDRAWN | N/A | View | |||||||||||
| GEN-2013-033 | IFS-2013-002-07 | DISIS-2013-002-2 | 03 CENTRAL | Ellis | KS | MIDW | 12/31/2015 | 2/27/2016 | 28 | 28 | 28 | ER/NR | 0 | 0 | 0 | Thermal | Gas | Goodman Energy Center 115kV | 9/30/2013 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | View | |||||||
| GEN-2013-032 | IFS-2013-002-06 | DISIS-2013-002-2 | 02 NEBRASKA | Antelope | NE | NPPD | 12/31/2016 | 12/20/2018 | 202.5 | 202.5 | 202.5 | ER | 0 | 0 | 0 | Wind | Antelope 115kV | 9/30/2013 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | View | ||||||||
| GEN-2013-031 | Randall | TX | SWPS | 6/1/2016 | 370 | 322 | 370 | ER | 0 | 0 | 0 | Thermal | Gas | Bushland 230kV | 9/30/2013 | 8/13/2014 | WITHDRAWN | N/A | View | ||||||||||
| GEN-2013-030 | IFS-2013-002-05 | DISIS-2013-002-2 | Ochiltree | TX | OKGE | 12/15/2015 | 12/31/2020 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | Hitchland-Woodward EHV Dbl Ckt (Beaver County) 345kV | 9/30/2013 | TERMINATED | N/A | View | |||||||||
| GEN-2013-029 | IFS-2013-002-04 | DISIS-2013-002-2 | 04 SOUTHEAST | Grant | OK | OKGE | 12/15/2015 | 4/8/2016 | 299 | 299 | 299 | ER | 0 | 0 | 0 | Wind | Renfrow 345kV | 9/30/2013 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | View | ||||||||
| GEN-2013-028 | IFS-2013-002-03 | DISIS-2013-002-2 | 04 SOUTHEAST | Mayes | OK | GRDA | 4/16/2016 | 12/23/2017 | 538 | 495 | 538 | ER | 0 | 0 | 0 | Thermal | Gas | Tap N Tulsa - GRDA 1 345kV | 9/30/2013 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | View | |||||||
| GEN-2013-027 | IFS-2014-002-02 | DISIS-2014-002-6 | 05 SOUTHWEST | Bailey | TX | SWPS | 3/31/2016 | 12/10/2018 | 148.4 | 148.4 | 148.4 | ER/NR | 0 | 0 | 0 | Wind | Tolk - Yoakum 230kV | 9/30/2013 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2013-026 | Holt | MO | GMO | 12/1/2015 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Wind | Tap Saint Joseph - Cooper 345kV (GEN-2010-056 Tap) | 9/30/2013 | 8/25/2015 | WITHDRAWN | N/A | View | |||||||||||
| GEN-2013-025 | Canadian | OK | OKGE | 9/30/2015 | 50 | 50 | 50 | ER | 0 | 0 | 0 | Wind | Tap Cimarron - Woodring (Mathewson) 345kV | 9/27/2013 | 8/13/2014 | WITHDRAWN | N/A | View | |||||||||||
| GEN-2013-024 | Cherry | NE | NPPD | 10/1/2018 | 250 | 250 | 250 | ER | 0 | 0 | 0 | Wind | Cherry County 345kV | 9/24/2013 | 10/21/2013 | WITHDRAWN | N/A | View | |||||||||||
| GEN-2013-023 | Greeley | NE | NPPD | 10/1/2014 | 74.8 | 74.8 | 74.8 | ER | 0 | 0 | 0 | Wind | Tap North Loup - Spaling 115kV | 9/23/2013 | 10/21/2013 | WITHDRAWN | N/A | View | |||||||||||
| GEN-2013-022 | IFS-2013-002-02 | DISIS-2013-002-2 | 05 SOUTHWEST | Quay | NM | SWPS | 5/1/2015 | 12/7/2016 | 25 | 25 | 25 | ER/NR | 0 | 0 | 0 | Solar | Norton 115kV Switching Station | 9/5/2013 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | View | ||||||||
| GEN-2013-021 | Keith | NE | NPPD | 12/1/2016 | 229.5 | 229.5 | 229.5 | ER/NR | 0 | 0 | 0 | Wind | Ogallala 230kV | 7/8/2013 | 8/13/2014 | WITHDRAWN | N/A | View | |||||||||||
| GEN-2013-020 | Marion | KS | WERE | 7/15/2014 | 200.1 | 200.1 | 200.1 | ER/NR | 0 | 0 | 0 | Wind | Tap Wichita - Emporia 345kV CKT 1 | 6/28/2013 | 10/23/2013 | WITHDRAWN | N/A | View | |||||||||||
| GEN-2013-019 | IFS-2013-002-01 | DISIS-2013-002-2 | 02 NEBRASKA | Lancaster | NE | NPPD | 6/30/2014 | 11/15/2022 | 73.6 | 73.6 | 73.6 | ER/NR | 0 | 0 | 0 | Wind | Monolith 115kV | 4/17/2013 | IA FULLY EXECUTED/ON SCHEDULE | N/A | View | ||||||||
| GEN-2013-018 | Otoe | NE | OPPD | 10/31/2014 | 51 | 51 | 51 | ER/NR | 0 | 0 | 0 | Wind | Tap S974 - Hydrocarbon Tap 69kV | 4/2/2013 | 10/2/2013 | WITHDRAWN | N/A | View | |||||||||||
| GEN-2013-017 | Crosby | TX | SWPS | 12/31/2014 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Tap TUCO - OKU 345kV | 3/29/2013 | 10/21/2013 | WITHDRAWN | N/A | View | |||||||||||
| GEN-2013-016 | IFS-2013-001-03 | DISIS-2013-001-4 | 05 SOUTHWEST | Hale | TX | SWPS | 12/1/2016 | 10/19/2019 | 203 | 191 | 203 | ER | 0 | 0 | 0 | Thermal | CT | TUCO 345kV | 3/29/2013 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||
| GEN-2013-015 | Webster | NE | NPPD | 12/31/2015 | 125.8 | 125.8 | 125.8 | ER/NR | 0 | 0 | 0 | Wind | Tap Pauline - Hildreth 115kV | 3/29/2013 | 8/13/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2013-014 | Webster | NE | NPPD | 12/31/2014 | 12/30/2015 | 25.5 | 25.5 | 25.5 | ER/NR | 0 | 0 | 0 | Wind | Tap Guide Rock - Pauline (GEN-2008-123N Tap) 115kV | 3/29/2013 | 4/13/2016 | TERMINATED | N/A | |||||||||||
| GEN-2013-013 | Roosevelt | NM | SWPS | 12/1/2014 | 248.4 | 248.4 | 248.4 | ER/NR | 0 | 0 | 0 | Wind | Tap Eddy County - Tolk 345kV | 3/28/2013 | 8/13/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2013-012 | DISIS-2013-001-4 | 04 SOUTHEAST | Logan County | OK | OKGE | 11/30/2014 | 8/11/2014 | 147 | 68 | 147 | ER | 0 | 0 | 0 | Thermal | Gas | Redbud 345kV | 3/28/2013 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2013-011 | IFS-2013-001-02 | DISIS-2013-001-4 | 04 SOUTHEAST | Hempstead | AR | AEPW | 12/18/2012 | 30 | 40 | 30 | ER | 0 | 0 | 0 | Thermal | Coal | Turk 138kV | 3/28/2013 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2013-010 | IFS-2014-002-01 | Rush | KS | SUNC | 12/31/2017 | 11/30/2018 | 99 | 99 | 99 | ER | 0 | 0 | 0 | Wind | Post Rock-Spearville 345kV | 3/25/2013 | 8/8/2018 | WITHDRAWN | N/A | ||||||||||
| GEN-2013-009 | Craig | OK | AEPW | 12/31/2015 | 100.3 | 100.3 | 100.3 | ER | 0 | 0 | 0 | Wind | Tap Alluwe Tap - Vinita Junction 138kV | 3/25/2013 | 8/13/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2013-008 | DISIS-2013-001-4 | 02 NEBRASKA | Jefferson | NE | NPPD | 12/31/2013 | 12/31/2013 | 1.2 | 1.2 | 1.2 | ER | 0 | 0 | 0 | Wind | Steele City 115kV | 3/27/2013 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2013-007 | DISIS-2013-001-4 | 04 SOUTHEAST | Murray | OK | OKGE | 12/31/2014 | 11/23/2015 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Wind | Tap Prices Falls - Carter 138kV | 3/25/2013 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2013-006 | Madison | NE | NPPD | 10/1/2014 | 50.6 | 50.6 | 50.6 | ER | 0 | 0 | 0 | Wind | Tap Fort Randall - Columbus (Meadow Grove) 230kV | 3/25/2013 | 8/1/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2013-005 | Antelope County | NE | NPPD | 12/31/2014 | 73.5 | 73.5 | 73.5 | ER/NR | 0 | 0 | 0 | Wind | Tap Fort Randall - Columbus (Madison County) 230kV | 3/25/2013 | 8/29/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2013-004 | Antelope County | NE | NPPD | 1/1/2014 | 6 | 6 | 6 | ER/NR | 0 | 0 | 0 | Wind | Tap Fort Randall - Columbus (Madison County) 230kV | 3/25/2013 | 8/15/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2013-003 | Mooreland | OK | WFEC | 3/1/2017 | 48 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | CT | Tap Woodward - Thistle 345kV Dbl CKT (GEN-2012-016 Tap) | 3/14/2013 | 3/5/2014 | WITHDRAWN | N/A | |||||||||||
| GEN-2013-002 | IFS-2013-001-01 | DISIS-2013-001-4 | 02 NEBRASKA | Lancaster | NE | NPPD | 12/31/2013 | 11/15/2022 | 50.6 | 50.6 | 50.6 | ER/NR | 0 | 0 | 0 | Wind | Monolith 115kV | 3/1/2013 | IA FULLY EXECUTED/ON SCHEDULE | N/A | |||||||||
| GEN-2013-001 | Sherman | TX | SWPS | 1/12/2014 | 200 | 200 | 200 | 0 | 0 | 0 | Wind | Hitchland - Moore County (North Plains) 230 kv | 12/31/2012 | 10/15/2013 | WITHDRAWN | N/A | |||||||||||||
| GEN-2012-044 | Crawford | KS | WERE | 11/30/2013 | 11/1/2013 | 2 | 2 | 2 | ER | 0 | 0 | 0 | Thermal | Gas | Sheffield 69kV | 12/5/2012 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||
| GEN-2012-043 | Roosevelt | NM | SWPS | 12/1/2015 | 200 | 200 | 200 | 0 | 0 | 0 | Wind | Tap Eddy County - Tolk (North of GEN-2008-022 Tap) | 9/30/2012 | 10/15/2013 | WITHDRAWN | N/A | |||||||||||||
| GEN-2012-042 | Ford | KS | SUNC | 12/31/2014 | 220 | 0 | 0 | ER/NR | 0 | 0 | 0 | Thermal | Gas | Spearville 345kV | 9/28/2012 | 2/28/2013 | WITHDRAWN | N/A | |||||||||||
| GEN-2012-041 | DISIS-2012-002-6 | 04 SOUTHEAST | Kay | OK | OKGE | 4/15/2015 | 4/15/2015 | 121.5 | 85.3 | 121.5 | ER | 0 | 0 | 0 | Thermal | CT | Rose Hill (Open Sky)-Sooner (Ranch Road) 345kV | 9/30/2012 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2012-040 | Kay | OK | WFEC | 12/1/2013 | 6/30/2015 | 76.5 | 76.5 | 76.5 | ER/NR | 0 | 0 | 0 | Wind | Chilocco 138kV | 9/30/2012 | 12/22/2015 | WITHDRAWN | N/A | |||||||||||
| GEN-2012-039 | Custer | NE | NPPD | 12/31/2013 | 74.9 | 74.9 | 74.9 | ER/NR | 0 | 0 | 0 | Wind | Broken Bow 115kV | 9/28/2012 | 12/13/2012 | WITHDRAWN | N/A | ||||||||||||
| GEN-2012-038 | Floyd | TX | SWPS | 3/1/2015 | 203 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | CT | Tap Border - TUCO Interchange 345kV | 9/30/2012 | 5/24/2013 | WITHDRAWN | N/A | |||||||||||
| GEN-2012-037 | DISIS-2012-002-6 | 05 SOUTHWEST | Hale | TX | SWPS | 3/1/2015 | 3/1/2015 | 203 | 196 | 203 | ER | 0 | 0 | 0 | Thermal | CT | TUCO 345kV | 9/30/2012 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2012-036 | DISIS-2012-002-6 | 05 SOUTHWEST | Yoakum | TX | SWPS | 6/1/2013 | 3/1/2013 | 7 | 7 | 7 | ER | 0 | 0 | 0 | Thermal | CT | Mustang 230kV | 9/30/2012 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2012-035 | DISIS-2012-002-6 | 05 SOUTHWEST | Yoakum | TX | SWPS | 6/1/2013 | 4/1/2015 | 7 | 7 | 7 | ER | 0 | 0 | 0 | Thermal | CT | Mustang 230kV | 9/30/2012 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2012-034 | DISIS-2012-002-6 | 05 SOUTHWEST | Yoakum | TX | SWPS | 6/1/2013 | 4/1/2015 | 7 | 7 | 7 | ER | 0 | 0 | 0 | Thermal | CT | Mustang 230kV | 9/30/2012 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2012-033 | DISIS-2012-002-6 | 04 SOUTHEAST | Garfield | OK | OKGE | 12/1/2014 | 9/1/2015 | 98.82 | 98.82 | 98.82 | ER | 0 | 0 | 0 | Wind | Breckinridge 138kV | 9/28/2012 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | View | View | ||||||||
| GEN-2012-032 | DISIS-2012-002-6 | 04 SOUTHEAST | Kay | OK | OKGE | 11/30/2014 | 6/30/2015 | 299 | 299 | 299 | ER | 0 | 0 | 0 | Wind | Rose Hill-(Ranch Road) Sooner (Open Sky) 345kV | 9/28/2012 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2012-031 | Canadian | OK | OKGE | 11/30/2014 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Cimarron 345kV (GEN-2010-040 Sub) | 9/28/2012 | 3/6/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2012-030 | Canadian | OK | OKGE | 11/30/2015 | 200 | 200 | 200 | 0 | 0 | 0 | Wind | Cimarron 345kV (GEN-2010-040 Sub) | 9/28/2012 | 2/8/2013 | WITHDRAWN | N/A | |||||||||||||
| GEN-2012-029 | Kiowa | OK | AEPW | 12/1/2014 | 100.3 | 100.3 | 100.3 | ER | 0 | 0 | 0 | Wind | Tap Little Elk - Hobart 138kV | 9/28/2012 | 3/1/2013 | WITHDRAWN | N/A | ||||||||||||
| GEN-2012-028 | DISIS-2012-002-6 | 04 SOUTHEAST | Washita | OK | WFEC | 12/1/2014 | 12/22/2015 | 74 | 74 | 74 | ER | 0 | 0 | 0 | Wind | Gotebo 69kV | 9/28/2012 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2012-027 | Osage | OK | AEPW | 12/1/2014 | 136 | 136 | 136 | ER | 0 | 0 | 0 | Wind | Shidler 138kV | 9/28/2012 | 3/23/2016 | TERMINATED | N/A | ||||||||||||
| GEN-2012-026 | Thomas | KS | MIDW | 12/31/2014 | 100 | 0 | 0 | ER/NR | 0 | 0 | 0 | Thermal | CT | Colby 115kV | 9/28/2012 | 8/13/2014 | WITHDRAWN | N/A | |||||||||||
| GEN-2012-025 | Ellis | OK | OKGE | 12/31/2014 | 250 | 250 | 250 | 0 | 0 | 0 | Wind | TAP HITCHLAND-WOODWARD 345KV | 9/28/2012 | 10/30/2012 | WITHDRAWN | N/A | |||||||||||||
| GEN-2012-024 | IFS-2012-002-01 | DISIS-2012-002-6 | 03 CENTRAL | Ford | KS | SUNC | 12/31/2015 | 6/1/2017 | 180 | 180 | 180 | ER | 0 | 0 | 0 | Wind | Clark County 345kV | 9/28/2012 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2012-023 | Barber | KS | WERE | 12/31/2014 | 115 | 115 | 115 | ER | 0 | 0 | 0 | Wind | Viola 345kV | 9/27/2012 | 8/4/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2012-022 | Lea | NM | SWPS | 12/1/2014 | 30 | 0 | 0 | 0 | 0 | 0 | Solar | Ochoa 115kV | 9/27/2012 | 2/4/2013 | WITHDRAWN | N/A | |||||||||||||
| GEN-2012-021 | DISIS-2012-002-6 | 02 NEBRASKA | Lincoln | NE | LES | 8/1/2013 | 12/1/2013 | 4.8 | 4.8 | 4.8 | ER | 0 | 0 | 0 | Thermal | Gas | Terry Bundy Generating Station 115kV | 9/26/2012 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2012-020 | DISIS-2012-002-6 | 05 SOUTHWEST | Abernathy County | TX | SWPS | 9/30/2015 | 6/28/2019 | 478 | 478 | 478 | ER | 0 | 0 | 0 | Wind | TUCO 230kV | 9/26/2012 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2012-019 | Lea County | NM | SWPS | 11/29/2014 | 200 | 200 | 200 | 0 | 0 | 0 | Wind | Tap Eddy County - Tolk (GEN-2008-022 Tap) 345kV | 9/24/2012 | 2/5/2013 | WITHDRAWN | N/A | |||||||||||||
| GEN-2012-018 | Dixon County | NE | NPPD | 12/15/2014 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Tap Hoskins - Twin Church 230kV | 9/24/2012 | 1/24/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2012-017 | Brownville | NE | NPPD | 9/1/2018 | 115 | 0 | 0 | ER | 0 | 0 | 0 | Nuclear | Cooper 345kV | 9/20/2012 | 8/20/2013 | WITHDRAWN | N/A | ||||||||||||
| GEN-2012-016 | Mooreland | OK | WFEC | 3/1/2017 | 312 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | CT | Tap Woodward - Thistle 345kV Ckt 1 | 8/24/2012 | 3/5/2014 | WITHDRAWN | N/A | |||||||||||
| GEN-2012-015 | Tucumcari | NM | SWPS | 5/1/2014 | 26 | 0 | 0 | ER/NR | 0 | 0 | 0 | Solar | Caprock 34.5kV | 7/26/2012 | 3/5/2013 | WITHDRAWN | N/A | ||||||||||||
| GEN-2012-014 | Pampa, TX | TX | SWPS | 4/1/2015 | 425 | 0 | 0 | 0 | 0 | 0 | Thermal | CT | Grapevine 230kV | 6/30/2012 | 8/21/2012 | WITHDRAWN | N/A | ||||||||||||
| GEN-2012-013 | Gray County | KS | MKEC | 12/1/2012 | 99 | 99 | 99 | ER | 0 | 0 | 0 | Wind | Gray County Tap 115kV | 4/6/2012 | 12/11/2012 | WITHDRAWN | N/A | ||||||||||||
| GEN-2012-012 | Kiowa County | KS | SUNC | 12/31/2015 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Clark County 345kV | 3/29/2012 | 11/16/2012 | WITHDRAWN | N/A | ||||||||||||
| GEN-2012-011 | Ness County | KS | MIDW | 11/1/2013 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Tap Spearville - Post Rock 345kV | 3/29/2012 | 8/13/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2012-010 | Denver City | TX | SWPS | 4/1/2015 | 6/1/2014 | 15 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | CT | Mustang 230kV | 3/30/2012 | WITHDRAWN | N/A | |||||||||||
| GEN-2012-009 | Denver City | TX | SWPS | 4/1/2015 | 6/1/2014 | 15 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | CT | Mustang 230kV | 3/30/2012 | WITHDRAWN | N/A | |||||||||||
| GEN-2012-008 | Denver City | TX | SWPS | 4/1/2015 | 40 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | CT | Mustang 115kV & Mustang 230kV | 3/30/2012 | 8/20/2013 | WITHDRAWN | N/A | |||||||||||
| GEN-2012-007 | DISIS-2012-001-4 | 03 CENTRAL | Grant County | KS | SUNC | 4/1/2014 | 4/15/2014 | 120 | 120 | 120 | ER/NR | 0 | 0 | 0 | Thermal | Gas | Rubart 115kV | 3/29/2012 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2012-006 | Harper County | KS | 12/31/2014 | 150 | 150 | 150 | 0 | 0 | 0 | Wind | Harper 138 kV | 3/29/2012 | 9/27/2012 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2012-005 | Verdigre | NE | NPPD | 6/1/2015 | 81 | 81 | 81 | ER/NR | 0 | 0 | 0 | Wind | Tap Fort Randall - Columbus (north of Madison County) 230kV | 3/20/2012 | 8/29/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2012-004 | DISIS-2012-001-4 | 04 SOUTHEAST | Carter County | OK | OKGE | 12/31/2013 | 11/21/2014 | 40.8 | 40.8 | 40.8 | ER/NR | 0 | 0 | 0 | Wind | Pooleville-Ratliff (Carter County) 138kV | 3/27/2012 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2012-003 | Hugoton | KS | 12/1/2013 | 22.5 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | ST | Tap Hugoton - Rolla 69kV | 3/22/2012 | WITHDRAWN | N/A | |||||||||||||
| GEN-2012-002 | Scott City | KS | SUNC | 1/1/2014 | 101.2 | 101.2 | 101.2 | ER | 0 | 0 | 0 | Wind | Tap Pile - Scott City 115kV | 3/22/2012 | 12/16/2013 | WITHDRAWN | N/A | ||||||||||||
| GEN-2012-001 | DISIS-2012-001-4 | 05 SOUTHWEST | Lynn County Texas | TX | SWPS | 11/30/2012 | 12/21/2012 | 61.2 | 61.2 | 61.2 | ER | 0 | 0 | 0 | Wind | Tap Grassland - Borden County 230 kv | 3/8/2012 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2011-061 | Dewey County | OK | OKGE | 6/1/2013 | 52 | 52 | 52 | 0 | 0 | 0 | Wind | Putnam 69kV | 12/2/2011 | 4/12/2012 | WITHDRAWN | N/A | |||||||||||||
| GEN-2011-060 | Dewey County | OK | OKGE | 6/1/2013 | 80 | 80 | 80 | 0 | 0 | 0 | Wind | Dewey 138kV | 12/2/2011 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2011-059 | Ford /Clark County | KS | SUNC | 2/11/2015 | 201 | 201 | 201 | 0 | 0 | 0 | Wind | Clark County 345kV / Spearville 345 kv | 10/17/2011 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2011-058 | Lynn County | TX | SWPS | 11/30/2012 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Wind | Tap Grassland - Borden 230kV | 9/30/2011 | 3/13/2012 | WITHDRAWN | N/A | ||||||||||||
| GEN-2011-057 | DISIS-2011-002-6 | 03 CENTRAL | Sumner County | KS | WERE | 12/31/2013 | 12/30/2015 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | Creswell 138kV | 9/30/2011 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2011-056B | DISIS-2011-002-6 | 02 NEBRASKA | North Platte - Lexington | NE | NPPD | 6/30/2012 | 10/31/2012 | 4.5 | 4.5 | 4.5 | ER | 0 | 0 | 0 | Hydro | John 2 115kV | 3/8/2012 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2011-056A | DISIS-2011-002-6 | 02 NEBRASKA | North Platte - Lexington | NE | NPPD | 6/30/2012 | 10/31/2012 | 3.6 | 3.6 | 3.6 | ER | 0 | 0 | 0 | Hydro | John 1 115kV | 3/8/2012 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2011-056 | DISIS-2011-002-6 | 02 NEBRASKA | North Platte - Lexington | NE | NPPD | 6/30/2012 | 10/31/2012 | 3.6 | 3.6 | 3.6 | ER | 0 | 0 | 0 | Hydro | Jeffrey 115kV | 9/30/2011 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2011-055 | Johnson County | NE | OPPD | 12/31/2012 | 52.8 | 52.8 | 52.8 | ER/NR | 0 | 0 | 0 | Wind | South Sterling 69kV | 9/30/2011 | 8/15/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2011-054 | DISIS-2011-002-6 | 04 SOUTHEAST | Canadian County | OK | OKGE | 11/30/2013 | 12/31/2014 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | Cimarron 345kV | 9/30/2011 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | View | View | ||||||||
| GEN-2011-053 | Saint Joseph | MO | MIPU | 6/1/2014 | 250 | 0 | 0 | 0 | 0 | 0 | Thermal | Gas | Alabama St Sub 161 kV | 9/30/2011 | 10/19/2011 | WITHDRAWN | N/A | ||||||||||||
| GEN-2011-052 | Jackson County | MO | MIPU | 6/1/2014 | 250 | 0 | 0 | 0 | 0 | 0 | Thermal | Gas | Grain Valley 161 kV Sub | 9/30/2011 | 10/19/2011 | WITHDRAWN | N/A | ||||||||||||
| GEN-2011-051 | Dewey County | OK | OKGE | 12/31/2013 | 12/31/2017 | 104.4 | 104.4 | 104.4 | ER/NR | 0 | 0 | 0 | Wind | Tap Woodward - Tatonga 345kV | 9/30/2011 | 3/5/2017 | WITHDRAWN | N/A | |||||||||||
| GEN-2011-050 | DISIS-2011-002-6 | 04 SOUTHEAST | Grady County | OK | AEPW | 12/31/2013 | 12/13/2016 | 108 | 108 | 108 | ER | 0 | 0 | 0 | Wind | Tap Rush Springs - Marlow 138kV | 9/30/2011 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2011-049 | DISIS-2011-002-6 | Beckham County | OK | OKGE | 12/31/2013 | 7/31/2020 | 250.7 | 250.7 | 250.7 | ER | 0 | 0 | 0 | Wind | Border 345kV | 9/30/2011 | 8/19/2020 | TERMINATED | N/A | ||||||||||
| GEN-2011-048 | DISIS-2011-002-6 | 05 SOUTHWEST | Denver City | TX | SWPS | 3/1/2013 | 3/1/2013 | 175 | 165 | 175 | ER/NR | 0 | 0 | 0 | Thermal | CT | Mustang 230kV | 9/30/2011 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2011-047 | Hugoton | KS | SUNC | 12/1/2013 | 22.5 | 0 | 0 | 0 | 0 | 0 | Thermal | Steam | Hugoton 115 | 9/30/2011 | 12/29/2011 | WITHDRAWN | N/A | ||||||||||||
| GEN-2011-046 | DISIS-2011-002-6 | 05 SOUTHWEST | Quay County | NM | SWPS | 6/1/2013 | 9/5/2013 | 23 | 23 | 23 | ER | 0 | 0 | 0 | Thermal | CT | Tucumcari 115kV | 9/29/2011 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2011-045 | DISIS-2011-002-6 | 05 SOUTHWEST | Lubbock | TX | SWPS | 6/1/2013 | 5/1/2013 | 205 | 180 | 205 | ER | 0 | 0 | 0 | Thermal | NG/CT | Jones 230kV | 9/29/2011 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2011-044 | Barber County | KS | WERE | 12/31/2014 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Wind | Thistle 345kV | 9/28/2011 | 1/8/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2011-043 | Barber County | KS | WERE | 12/31/2013 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | Thistle 345kV | 9/28/2011 | 1/8/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2011-042 | Barber County | KS | WERE | 12/31/2014 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Wind | Tap Wichita - Woodring (Sumner County) 345kV | 9/28/2011 | 3/6/2012 | WITHDRAWN | N/A | ||||||||||||
| GEN-2011-041 | Barber County | KS | WERE | 12/31/2013 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | Tap Wichita - Woodring (Sumner County) 345kV | 9/28/2011 | 3/6/2012 | WITHDRAWN | N/A | ||||||||||||
| GEN-2011-040 | DISIS-2011-002-6 | 04 SOUTHEAST | Murray County | OK | OKGE | 12/31/2012 | 11/21/2014 | 111 | 111 | 111 | ER/NR | 0 | 0 | 0 | Wind | Pooleville-Ratliff (Carter County) 138kV | 9/16/2011 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2011-039 | Cowley County | KS | WERE | 12/14/2014 | 300 | 300 | 300 | 0 | 0 | 0 | Wind | Wichita - Woodring 345 kV line | 9/14/2011 | 10/3/2011 | WITHDRAWN | N/A | |||||||||||||
| GEN-2011-038 | Edwards County | KS | MIDW | 12/31/2013 | 73.8 | 73.8 | 73.8 | 0 | 0 | 0 | Wind | Kinsley 138kV | 9/6/2011 | 2/23/2012 | WITHDRAWN | N/A | |||||||||||||
| GEN-2011-037 | DISIS-2011-002-6 | 04 SOUTHEAST | Apache | OK | WFEC | 1/1/2012 | 2/5/2013 | 6.6 | 6.6 | 6.6 | ER | 0 | 0 | 0 | Wind | Blue Canyon 5 138kV | 7/1/2011 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2011-036 | Swisher County | TX | SWPS | 6/1/2014 | 270 | 0 | 0 | 0 | 0 | 0 | Wind | Tap Amarillo South – Swisher County 230kV | 7/1/2011 | 10/3/2011 | WITHDRAWN | N/A | |||||||||||||
| GEN-2011-035 | Cotton County | OK | WFEC | 12/3/2012 | 20 | 20 | 20 | 0 | 0 | 0 | Wind | Hollister SW- Walters 69 kV | 6/13/2011 | 7/13/2011 | WITHDRAWN | N/A | |||||||||||||
| GEN-2011-034 | Hall County | TX | AEPW | 12/31/2013 | 31 | 31 | 31 | 0 | 0 | 0 | Wind | Windy Buttes - Estelline 69 KV | 6/13/2011 | 8/30/2011 | WITHDRAWN | N/A | |||||||||||||
| GEN-2011-033 | Keithville | LA | AEPW | 7/1/2013 | 10.8 | 0 | 0 | 0 | 0 | 0 | Thermal | Gas | New 138 kV Switching Station at Woolworth Road | 6/3/2011 | 7/13/2011 | WITHDRAWN | N/A | ||||||||||||
| GEN-2011-032 | Clark County | KS | SUNC | 10/1/2014 | 180 | 180 | 180 | 0 | 0 | 0 | Wind | Comanche 345kV | 5/24/2011 | 10/3/2011 | WITHDRAWN | N/A | |||||||||||||
| GEN-2011-031 | Ector County | TX | SWPS | 12/31/2014 | 195.6 | 0 | 0 | 0 | 0 | 0 | Thermal | CT | Midland 230kV | 3/31/2011 | 10/12/2011 | WITHDRAWN | N/A | ||||||||||||
| GEN-2011-030 | Holcomb | KS | SUNC | 6/1/2017 | 1020 | 0 | 0 | 0 | 0 | 0 | Thermal | Coal | Holcomb 345kV | 3/31/2011 | 8/4/2011 | WITHDRAWN | N/A | ||||||||||||
| GEN-2011-029 | Grady County | OK | WFEC | 12/31/2013 | 200 | 200 | 200 | 0 | 0 | 0 | Wind | Tap Rush Springs (Nat. Gas) – Rush Springs (Marlow) 138kV | 3/31/2011 | 8/4/2011 | WITHDRAWN | N/A | |||||||||||||
| GEN-2011-028 | Ellis County | OK | OKGE | 11/1/2014 | 300.8 | 300.8 | 300.8 | 0 | 0 | 0 | Wind | Tap Guymon – Woodward 345kV | 3/31/2011 | 8/4/2011 | WITHDRAWN | N/A | |||||||||||||
| GEN-2011-027 | DISIS-2011-001-8 | 02 NEBRASKA | Winside | NE | NPPD | 12/31/2012 | 12/17/2018 | 120 | 120 | 120 | ER/NR | 0 | 0 | 0 | Wind | Wakefield 230kV | 3/31/2011 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2011-026 | Lorenzo | TX | SWPS | 12/31/2011 | 19.7 | 19.7 | 19.7 | 0 | 0 | 0 | Wind | Pleasant Hill 69 kV | 3/31/2011 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2011-025 | DISIS-2011-001-8 | 05 SOUTHWEST | Lorenzo | TX | SWPS | 6/30/2012 | 12/15/2018 | 79.96 | 79.96 | 79.96 | ER | 0 | 0 | 0 | Wind | Tap Floyd County - Crosby County 115kV | 3/31/2011 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2011-024 | Dewey County | OK | OKGE | 12/31/2012 | 299 | 299 | 299 | ER/NR | 0 | 0 | 0 | Wind | Tatonga 345kV | 3/31/2011 | 8/19/2013 | WITHDRAWN | N/A | ||||||||||||
| GEN-2011-023 | Ford County | KS | SUNC | 12/31/2012 | 299 | 299 | 299 | ER/NR | 0 | 0 | 0 | Wind | Clark County 345kV | 3/31/2011 | 9/20/2013 | WITHDRAWN | N/A | ||||||||||||
| GEN-2011-022 | DISIS-2011-001-8 | 05 SOUTHWEST | Hansford | TX | SWPS | 12/31/2012 | 12/31/2022 | 299 | 299 | 299 | ER | 0 | 0 | 0 | Wind | Hitchland 345kV | 3/31/2011 | IA FULLY EXECUTED/ON SCHEDULE | N/A | ||||||||||
| GEN-2011-021 | Hansford County | TX | OKGE | 12/31/2012 | 299 | 299 | 299 | ER | 0 | 0 | 0 | Wind | Tap Hitchland - Woodward 345 KV | 3/31/2011 | 2/27/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2011-020 | DISIS-2011-001-8 | 04 SOUTHEAST | Ellis | OK | OKGE | 12/31/2012 | 12/31/2020 | 165.6 | 165.6 | 165.6 | ER/NR | 0 | 0 | 0 | Wind | Woodward EHV 345kV | 3/31/2011 | IA FULLY EXECUTED/ON SCHEDULE | N/A | ||||||||||
| GEN-2011-019 | DISIS-2011-001-8 | 04 SOUTHEAST | Woodward County | OK | OKGE | 12/31/2012 | 12/31/2020 | 175 | 175 | 175 | ER/NR | 0 | 0 | 0 | Wind | Woodward EHV 345kV | 3/31/2011 | IA FULLY EXECUTED/ON SCHEDULE | N/A | ||||||||||
| GEN-2011-018 | DISIS-2011-001-8 | 02 NEBRASKA | Jefferson County | NE | NPPD | 12/1/2013 | 12/31/2013 | 73.6 | 73.6 | 73.6 | ER/NR | 0 | 0 | 0 | Wind | Steele City 115kV | 3/31/2011 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2011-017 | Hodgeman County | KS | SUNC | 12/1/2013 | 1/1/2018 | 299 | 299 | 299 | ER | 0 | 0 | 0 | Wind | Tap Spearville - Knoll 345kV | 3/31/2011 | 9/8/2015 | WITHDRAWN | N/A | |||||||||||
| GEN-2011-016 | IFS-2011-001-01 | DISIS-2011-001-8 | Hodgeman County | KS | SUNC | 12/1/2013 | 12/1/2017 | 200.1 | 200.1 | 200.1 | ER | 0 | 0 | 0 | Wind | Clark County-Spearville Ckt 2 345kV | 3/31/2011 | 4/17/2019 | TERMINATED | N/A | |||||||||
| GEN-2011-015 | Dewey County | OK | OKGE | 8/31/2013 | 300.6 | 300.6 | 300.6 | 0 | 0 | 0 | Wind | Tap Tatonga - Woodward 345 KV | 3/31/2011 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2011-014 | DISIS-2011-001-8 | 05 SOUTHWEST | Beaver County | OK | OKGE | 12/31/2013 | 12/20/2016 | 198 | 198 | 198 | ER | 0 | 0 | 0 | Wind | Beaver County-Woodward EHV Dbl Ckt (Badger) 345kV | 3/31/2011 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2011-013 | Murray County | OK | OKGE | 12/31/2012 | 101.7 | 101.7 | 101.7 | 0 | 0 | 0 | Wind | Sunnyside 345kV | 3/31/2011 | 9/14/2011 | WITHDRAWN | N/A | |||||||||||||
| GEN-2011-012 | Sherman County | TX | SWPS | 12/31/2012 | 104.5 | 104.5 | 104.5 | ER | 0 | 0 | 0 | Wind | Tap Moore County - Hitchland 345kV | 3/31/2011 | 9/25/2013 | WITHDRAWN | N/A | ||||||||||||
| GEN-2011-011 | DISIS-2011-001-8 | 03 CENTRAL | Weston | MO | KCPL | 12/31/2010 | 6/5/2012 | 50 | 50 | 50 | ER | 0 | 0 | 0 | Thermal | Coal | Iatan 345kV | 3/31/2011 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2011-010 | DISIS-2011-001-8 | 04 SOUTHEAST | Caddo County | OK | OKGE | 12/1/2012 | 10/1/2012 | 100.8 | 100.8 | 100.8 | ER | 0 | 0 | 0 | Wind | Minco 345kV | 3/30/2011 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2011-009 | Washita County | OK | AEPW | 12/1/2013 | 150.4 | 150.4 | 150.4 | 0 | 0 | 0 | Wind | Hobart 138kV | 3/29/2011 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2011-008 | DISIS-2011-001-8 | 03 CENTRAL | Clark County | KS | SUNC | 12/1/2015 | 12/21/2016 | 600 | 600 | 600 | ER | 0 | 0 | 0 | Wind | Clark County 345kV | 3/29/2011 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2011-007 | Canadian County | OK | OKGE | 11/30/2011 | 250.1 | 250.1 | 250.1 | ER | 0 | 0 | 0 | Wind | Tap Cimarron - Woodring (Mathewson) 345kV | 3/29/2011 | 5/10/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2011-006 | Osage County | OK | AEPW | 6/1/2013 | 200 | 200 | 200 | 0 | 0 | 0 | Wind | Shidler 138kV | 3/29/2011 | 8/4/2011 | WITHDRAWN | N/A | |||||||||||||
| GEN-2011-005 | Butler County | NE | NPPD | 12/15/2013 | 150.4 | 150.4 | 150.4 | 0 | 0 | 0 | Wind | Rising City 115kV | 3/28/2011 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2011-004 | Cowley County | KS | WERE | 12/31/2013 | 150.4 | 150.4 | 150.4 | 0 | 0 | 0 | Wind | Creswell 138kV | 1/28/2011 | 8/4/2011 | WITHDRAWN | N/A | |||||||||||||
| GEN-2011-003 | Gray County | KS | MKEC | 5/29/2012 | 10 | 0 | 0 | 0 | 0 | 0 | Solar | GEN-2008-079 115kV | 1/28/2011 | 8/4/2011 | WITHDRAWN | N/A | |||||||||||||
| GEN-2011-002 | Cowley County | KS | WERE | 12/1/2012 | 300 | 300 | 300 | 0 | 0 | 0 | Wind | Latham Substation 69kV | 1/13/2011 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2011-001 | Smith County | KS | SUNC | 6/30/2013 | 200 | 200 | 200 | 0 | 0 | 0 | Wind | Tap Post Rock – Axtell 345kV | 1/5/2011 | 10/7/2011 | WITHDRAWN | N/A | |||||||||||||
| GEN-2010-062 | Ford County | KS | SUNC | 1/1/2015 | 129 | 129 | 129 | 0 | 0 | 0 | Wind | Tap GEN-2008-079 115kV | 12/30/2010 | 4/5/2011 | WITHDRAWN | N/A | |||||||||||||
| GEN-2010-061 | Pawnee County | KS | SUNC | 12/31/2012 | 180 | 180 | 180 | ER | 0 | 0 | 0 | Wind | Tap Post Rock - Spearville 345kV | 12/30/2010 | WITHDRAWN | N/A | |||||||||||||
| GEN-2010-060 | Ector County | TX | SWPS | 6/1/2014 | 992 | 0 | 0 | 0 | 0 | 0 | Thermal | Gas | Midland 345kV | 12/30/2010 | 4/12/2012 | WITHDRAWN | N/A | ||||||||||||
| GEN-2010-059 | Ector County | TX | SWPS | 4/1/2013 | 516 | 0 | 0 | 0 | 0 | 0 | Thermal | Gas | Midland 345kV | 12/30/2010 | 4/9/2012 | WITHDRAWN | N/A | ||||||||||||
| GEN-2010-058 | Roswell | NM | SWPS | 12/31/2011 | 20 | 20 | 20 | ER | 0 | 0 | 0 | Solar | Chaves County 115kV | 11/3/2010 | WITHDRAWN | N/A | |||||||||||||
| GEN-2010-057 | DISIS-2011-001-8 | 03 CENTRAL | Lincoln County | KS | MIDW | 8/1/2012 | 9/28/2012 | 201 | 201 | 201 | ER/NR | 0 | 0 | 0 | Wind | Rice County 230kV | 10/27/2010 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2010-056 | Holt County | MO | MIPU | 6/1/2012 | 151.2 | 151.2 | 151.2 | ER/NR | 0 | 0 | 0 | Wind | Tap Saint Joseph - Cooper (Mill Creek) 345kV | 10/25/2010 | 9/15/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2010-055 | DISIS-2011-001-8 | 04 SOUTHEAST | Sand Springs | OK | AEPW | 12/31/2011 | 2/27/2013 | 4.5 | 4.5 | 4.5 | ER | 0 | 0 | 0 | Thermal | Gas | Wekiwa 138kV | 9/30/2010 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2010-054 | Hodgeman County | KS | MKEC | 12/31/2014 | 200 | 200 | 200 | 0 | 0 | 0 | Wind | Spearville - Holcomb 345 kV | 9/30/2010 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2010-053 | Ford County | KS | SUNC | 12/31/2014 | 199.8 | 199.8 | 199.8 | ER/NR | 0 | 0 | 0 | Wind | COMANCHE 345kV | 9/30/2010 | 10/1/2012 | WITHDRAWN | N/A | ||||||||||||
| GEN-2010-052 | Haskell County | KS | SWPS | 12/15/2013 | 301.3 | 301.3 | 301.3 | ER | 0 | 0 | 0 | Wind | Finney 345kV | 9/30/2010 | 1/16/2012 | WITHDRAWN | N/A | ||||||||||||
| GEN-2010-051 | DISIS-2010-002-6 | 02 NEBRASKA | Dixon County | NE | NPPD | 12/15/2012 | 12/17/2018 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Wakefield 230kV | 9/30/2010 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2010-050 | Anderson County | KS | MIPU | 12/15/2012 | 150.4 | 150.4 | 150.4 | 0 | 0 | 0 | Wind | 9/30/2010 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2010-049 | Pratt County | KS | MKEC | 9/1/2012 | 49.6 | 49.6 | 49.6 | ER | 0 | 0 | 0 | Wind | Pratt 115kV | 9/30/2010 | 3/22/2012 | WITHDRAWN | N/A | ||||||||||||
| GEN-2010-048 | IFS-2015-001-06 | Graham County | KS | MIDW | 12/30/2017 | 70 | 70 | 70 | ER | 0 | 0 | 0 | Wind | Tap Substation on the Beach Station – Redline 115kV line | 9/30/2010 | 1/10/2017 | WITHDRAWN | N/A | |||||||||||
| GEN-2010-047 | Jefferson County | NE | NPPD | 12/1/2012 | 72 | 72 | 72 | 0 | 0 | 0 | Wind | TAP BEATRICE – HARBINE 115kV | 9/30/2010 | 9/30/2011 | WITHDRAWN | N/A | |||||||||||||
| GEN-2010-046 | DISIS-2010-002-6 | Abernathy | TX | SWPS | 5/1/2013 | 6/1/2016 | 56 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | TUCO 230kV | 9/30/2010 | 6/27/2019 | TERMINATED | N/A | |||||||||
| GEN-2010-045 | Ford County | KS | SUNC | 12/31/2012 | 12/31/2017 | 197.8 | 197.8 | 197.8 | ER | 0 | 0 | 0 | Wind | TAP HOLCOMB – SPEARVILLE 345kV | 9/29/2010 | 4/15/2018 | WITHDRAWN | N/A | |||||||||||
| GEN-2010-044 | Jefferson County | NE | NPPD | 11/1/2012 | 99 | 99 | 99 | ER/NR | 0 | 0 | 0 | Wind | Tap Harbine – Beatrice 115kV | 9/28/2010 | 10/28/2013 | WITHDRAWN | N/A | ||||||||||||
| GEN-2010-043 | Woodward | OK | WFEC | 5/1/2017 | 320 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | CT | Mooreland 138kV | 9/24/2010 | 2/29/2012 | WITHDRAWN | N/A | |||||||||||
| GEN-2010-042 | Ford County | KS | SUNC | 12/31/2012 | 73.6 | 73.6 | 73.6 | 0 | 0 | 0 | Wind | Spearville - Holcomb 345 kV | 9/24/2010 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2010-041 | DISIS-2010-002-6 | Richardson | NE | OPPD | 12/31/2011 | 12/1/2015 | 10.29 | 10.29 | 10.29 | ER | 0 | 0 | 0 | Wind | S1399 161kV | 9/24/2010 | 5/12/2019 | TERMINATED | N/A | ||||||||||
| GEN-2010-040 | DISIS-2010-002-6 | 04 SOUTHEAST | Canadian County | OK | OKGE | 11/30/2011 | 11/23/2012 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | Cimarron 345kV | 8/19/2010 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2010-039 | Holt County | NE | NPPD | 12/31/2012 | 150.4 | 150.4 | 150.4 | 0 | 0 | 0 | Wind | Stuart 115kV | 8/12/2010 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2010-038 | Custer County | NE | NPPD | 12/1/2012 | 74.9 | 74.9 | 74.9 | 0 | 0 | 0 | Wind | Broken Bow 115kV | 8/10/2010 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2010-037 | Ford County | KS | SUNC | 12/31/2011 | 100.8 | 100.8 | 100.8 | 0 | 0 | 0 | Wind | North Fort Dodge 115kV | 7/15/2010 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2010-036 | DISIS-2010-002-6 | 03 CENTRAL | Douglas County | KS | WERE | 8/1/2012 | 8/1/2012 | 4.6 | 4.6 | 4.6 | ER | 0 | 0 | 0 | Hydro | 6th Street 115kV | 6/30/2010 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2010-035 | Richardson County | NE | OPPD | 12/1/2014 | 160 | 160 | 160 | 0 | 0 | 0 | Wind | HUMBOLT 161kV | 6/25/2010 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2010-034 | Crosby County | TX | SWPS | 1/1/2012 | 261 | 261 | 261 | 0 | 0 | 0 | Wind | TUCO 345kV | 6/25/2010 | 10/25/2010 | WITHDRAWN | N/A | |||||||||||||
| GEN-2010-033 | Hale County | TX | SWPS | 1/1/2014 | 230 | 230 | 230 | 0 | 0 | 0 | Wind | TUCO 345kV | 6/25/2010 | 10/25/2010 | WITHDRAWN | N/A | |||||||||||||
| GEN-2010-032 | Hale County | TX | SWPS | 1/1/2014 | 216 | 216 | 216 | 0 | 0 | 0 | Wind | TUCO 345kV | 6/25/2010 | 10/25/2010 | WITHDRAWN | N/A | |||||||||||||
| GEN-2010-031 | Atchison County | MO | KCPL | 12/1/2014 | 200 | 200 | 200 | 0 | 0 | 0 | Wind | Nebraska City - Maryville 345kV | 6/25/2010 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2010-030 | Major County | OK | WFEC | 3/1/2014 | 150 | 150 | 150 | 0 | 0 | 0 | Wind | TAP MOORELAND – GLASS MOUNTAIN 138kV | 5/24/2010 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2010-029 | Ford County | KS | SUNC | 12/31/2013 | 450 | 450 | 450 | ER/NR | 0 | 0 | 0 | Wind | Spearville 345kV | 5/20/2010 | 6/12/2013 | WITHDRAWN | N/A | ||||||||||||
| GEN-2010-028 | Blaine County | OK | OKGE | 12/13/2013 | 335 | 335 | 335 | 0 | 0 | 0 | Wind | TATONGA 345kV | 5/20/2010 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2010-027 | Seward County | KS | SUNC | 12/31/2012 | 900 | 900 | 900 | 0 | 0 | 0 | Wind | COMANCHE 345kV | 3/31/2010 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2010-026 | Wayne County | NE | NPPD | 10/1/2012 | 99 | 99 | 99 | 0 | 0 | 0 | Wind | Hoskins 230kV | 3/31/2010 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2010-025 | Gentry | AR | AEPW | 9/16/2010 | 20 | 20 | 20 | 0 | 0 | 0 | Wind | Decatur South 161kV | 3/31/2010 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2010-024 | Cherry County | NE | NPPD | 12/31/2011 | 100 | 100 | 100 | 0 | 0 | 0 | Wind | Tap Valentine - Mission 115kV | 3/31/2010 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2010-023 | Woodward County | OK | WFEC | 11/1/2012 | 99 | 99 | 99 | 0 | 0 | 0 | Wind | Iodine 138kV | 3/31/2010 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2010-022 | Cass County | MO | MIPU | 12/3/2012 | 75 | 75 | 75 | 0 | 0 | 0 | Wind | Archie 161kV | 3/31/2010 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2010-021 | Eddy County | NM | SWPS | 3/1/2011 | 20 | 0 | 0 | 0 | 0 | 0 | Solar | Atoka 69kV | 3/31/2010 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2010-020 | Chaves County | NM | SWPS | 3/1/2011 | 20 | 20 | 20 | ER | 0 | 0 | 0 | Solar | Roswell 69kV | 3/31/2010 | 3/19/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2010-019 | Carter | OK | WFEC | 12/31/2011 | 52.2 | 52.2 | 52.2 | 0 | 0 | 0 | Wind | Carter Junction 69kV | 3/31/2010 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2010-018 | Erick | OK | WFEC | 12/31/2011 | 100.8 | 100.8 | 100.8 | 0 | 0 | 0 | Wind | Erick 138kV | 3/31/2010 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2010-017 | Coffey County | KS | WERE | 12/31/2015 | 199.8 | 199.8 | 199.8 | 0 | 0 | 0 | Wind | Tap Wolf Creek - LaCygne 345kV | 3/31/2010 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2010-016 | Rush County | KS | SUNC | 12/31/2015 | 199.8 | 199.8 | 199.8 | 0 | 0 | 0 | Wind | 3/31/2010 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2010-015 | Hodgeman County | KS | SUNC | 1/1/2013 | 200.1 | 200.1 | 200.1 | ER | 0 | 0 | 0 | Wind | Spearville 345kV | 3/31/2010 | 9/8/2014 | TERMINATED | N/A | ||||||||||||
| GEN-2010-014 | DISIS-2010-001-8 | 05 SOUTHWEST | Hansford County | TX | SWPS | 12/31/2013 | 12/31/2022 | 358.8 | 358.8 | 358.8 | ER | 0 | 0 | 0 | Wind | Hitchland 345kV | 3/31/2010 | IA FULLY EXECUTED/ON SCHEDULE | N/A | ||||||||||
| GEN-2010-013 | Elk County | KS | WERE | 12/31/2011 | 50.4 | 50.4 | 50.4 | 0 | 0 | 0 | Wind | GEN-2005-013 345KV | 3/31/2010 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2010-012 | Roger Mills County | OK | WFEC | 3/31/2012 | 65 | 65 | 65 | ER | 0 | 0 | 0 | Wind | Brantley 138kV | 3/31/2010 | 11/7/2012 | WITHDRAWN | N/A | ||||||||||||
| GEN-2010-011 | DISIS-2010-001-8 | 04 SOUTHEAST | Dewey County | OK | OKGE | 12/31/2011 | 2/28/2012 | 29.7 | 29.7 | 29.7 | ER | 0 | 0 | 0 | Wind | Tatonga 345kV | 3/31/2010 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2010-010 | Madison County | NE | NPPD | 12/1/2012 | 100.5 | 100.5 | 100.5 | 0 | 0 | 0 | Wind | New Madison Co. Sub on Ft. Randall-Kelly 230 kV | 3/29/2010 | 10/13/2011 | WITHDRAWN | N/A | |||||||||||||
| GEN-2010-009 | DISIS-2010-001-8 | 03 CENTRAL | Gray County | KS | SUNC | 12/1/2011 | 12/31/2012 | 165.6 | 165.6 | 165.6 | ER | 0 | 0 | 0 | Wind | Buckner 345kV | 3/29/2010 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2010-008 | Woodward County | OK | WFEC | 12/22/2011 | 64.4 | 64.4 | 64.4 | ER | 0 | 0 | 0 | Wind | Woodward 69kV | 3/29/2010 | 1/17/2011 | WITHDRAWN | N/A | ||||||||||||
| GEN-2010-007 | Hutchinson County | TX | SWPS | 12/1/2011 | 73.8 | 73.8 | 73.8 | ER | 0 | 0 | 0 | Wind | Tap Pringle - Riverview 115kV | 3/26/2010 | 5/3/2012 | WITHDRAWN | N/A | ||||||||||||
| GEN-2010-006 | DISIS-2010-001-8 | 05 SOUTHWEST | Lubbock | TX | SWPS | 6/1/2012 | 6/30/2011 | 205 | 180 | 205 | ER | 0 | 0 | 0 | Thermal | Gas | Jones 230kV | 3/24/2010 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2010-005 | DISIS-2010-001-8 | 03 CENTRAL | Harper County | KS | WERE | 12/1/2012 | 6/30/2021 | 299.2 | 299.2 | 299.2 | ER | 0 | 0 | 0 | Wind | Viola 345kV | 3/15/2010 | IA FULLY EXECUTED/ON SCHEDULE | N/A | ||||||||||
| GEN-2010-004 | Murray County | OK | OKGE | 10/31/2011 | 202 | 202 | 202 | 0 | 0 | 0 | Wind | Sunnyside - Lawton Eastside 345kV | 3/8/2010 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2010-003 | DISIS-2010-001-8 | 03 CENTRAL | Coffey County | KS | WERE | 12/31/2011 | 7/31/2014 | 99.5 | 99.5 | 99.5 | ER | 0 | 0 | 0 | Wind | Waverly 345kV | 3/8/2010 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2010-002 | Canadian County | OK | OKGE | 1/1/2012 | 300 | 300 | 300 | 0 | 0 | 0 | Wind | Cimarron - Woodring 345 kV | 3/3/2010 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2010-001 | DISIS-2010-002-6 | 05 SOUTHWEST | Beaver County | OK | OKGE | 1/1/2012 | 5/15/2015 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | Hitchland-Woodward EHV Dbl Ckt (Beaver County) 345kV | 3/3/2010 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2009-073T | Texas County | OK | SWPS | 12/31/2012 | 46.5 | 46.5 | 46.5 | ER | 0 | 0 | 0 | Wind | TC-Eva Texas County 69kV | 7/22/2013 | WITHDRAWN | N/A | |||||||||||||
| GEN-2009-072 | Sherman County | TX | SWPS | 1/1/2014 | 1000 | 1000 | 1000 | 0 | 0 | 0 | Wind | Hitchland 345kV | 12/31/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-071 | Oakwood | OK | OKGE | 12/31/2011 | 200 | 200 | 200 | 0 | 0 | 0 | Wind | Tatonga 345kV | 12/30/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-070 | Erick | OK | AEPW | 12/31/2011 | 150 | 150 | 150 | 0 | 0 | 0 | Wind | Erick 138kV | 12/30/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-069 | Beaver County | OK | SWPS | 12/31/2014 | 400 | 400 | 400 | 0 | 0 | 0 | Wind | Tap Hitchland - Woodward 345kV | 12/30/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-068 | Donley County | TX | AEPW | 3/31/2010 | 60 | 60 | 60 | 0 | 0 | 0 | Wind | Hedley 69kV | 12/30/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-067S | Eddy County | NM | SWPS | 12/1/2010 | 20 | 20 | 20 | ER | 0 | 0 | 0 | Solar | Seven Rivers 69kV | 12/30/2009 | TERMINATED | N/A | |||||||||||||
| GEN-2009-066 | Kiowa County | OK | AEPW | 12/31/2012 | 102 | 102 | 102 | 0 | 0 | 0 | Wind | Tap Blue Canyon - Washita 138kV | 12/30/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-065 | Graham County | KS | MIDW | 1/1/2011 | 100 | 100 | 100 | 0 | 0 | 0 | Wind | Tap Mingo - Setab 345kV | 12/22/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-064 | Ford County | KS | SUNC | 12/31/2015 | 102 | 102 | 102 | 0 | 0 | 0 | Wind | Spearville 345kV Substation | 12/21/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-063 | Dewey County | OK | OKGE | 11/1/2011 | 300.6 | 300.6 | 300.6 | 0 | 0 | 0 | Wind | Tatonga 345kV | 12/21/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-062 | Stevens County | KS | SUNC | 9/30/2012 | 115 | 0 | 0 | 0 | 0 | 0 | Thermal | Steam | Hugoton 115 | 12/18/2009 | WITHDRAWN | N/A | |||||||||||||
| GEN-2009-061 | Haskell County | KS | SUNC | 10/1/2012 | 100.5 | 100.5 | 100.5 | 0 | 0 | 0 | Wind | Tap Pioneer - Pioneer Tap 115kV | 12/18/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-060 | Washita County | OK | WFEC | 12/31/2011 | 84 | 84 | 84 | 0 | 0 | 0 | Wind | Gotebo 69kV | 12/18/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-059 | Clark County | KS | MKEC | 12/31/2011 | 100.5 | 100.5 | 100.5 | 0 | 0 | 0 | Wind | Tap GEN-2008-079 - Cudahy 115KV | 12/18/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-058 | Ford County | KS | SUNC | 12/31/2014 | 102 | 102 | 102 | 0 | 0 | 0 | Wind | Spearville 345kV Substation | 12/11/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-057 | Ford County | KS | SUNC | 12/31/2013 | 102 | 102 | 102 | 0 | 0 | 0 | Wind | Spearville 345kV Substation | 12/11/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-056 | Ford County | KS | SUNC | 12/31/2012 | 102 | 102 | 102 | 0 | 0 | 0 | Wind | Spearville 345kV Substation | 12/11/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-055S | Donley County | TX | AEPW | 12/1/2011 | 19.5 | 19.5 | 19.5 | 0 | 0 | 0 | Wind | Tap Clarendon - Hedley 69kV | 12/9/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-054 | Earth | TX | SWPS | 2/1/2011 | 220 | 220 | 220 | 0 | 0 | 0 | Wind | adjacent to Plant X & Tolk Generating Station | 12/1/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-053 | Ford County | KS | SUNC | 12/31/2011 | 100 | 100 | 100 | 0 | 0 | 0 | Wind | Tap Cudahay - Judson Large 115kV | 12/1/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-052 | Rush County | KS | MIDW | 12/31/2015 | 102 | 102 | 102 | 0 | 0 | 0 | Wind | Tap Knoll - Spearville 345kV | 11/18/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-051 | Rush County | KS | MIDW | 12/31/2014 | 102 | 102 | 102 | 0 | 0 | 0 | Wind | Tap Knoll - Spearville 345kV | 11/18/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-050 | Coffey County | KS | WERE | 12/31/2015 | 102 | 102 | 102 | 0 | 0 | 0 | Wind | Tap Wolf Creek - LaCygne 345kV | 10/26/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-049 | Coffey County | KS | WERE | 12/31/2014 | 102 | 102 | 102 | 0 | 0 | 0 | Wind | Tap Wolf Creek - LaCygne 345kV | 10/26/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-048 | Coffey County | KS | WERE | 12/31/2013 | 102 | 102 | 102 | 0 | 0 | 0 | Wind | Tap Wolf Creek - LaCygne 345kV | 10/26/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-047 | Nowata County | OK | AEPW | 10/31/2012 | 200 | 200 | 200 | 0 | 0 | 0 | Wind | Tap Delaware - Neosho 345kV | 10/20/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-046 | Swisher County | TX | SWPS | 12/31/2012 | 150 | 150 | 150 | 0 | 0 | 0 | Wind | Happy 115kV Substation | 10/9/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-045 | Swisher County | TX | SWPS | 12/13/2012 | 150 | 150 | 150 | 0 | 0 | 0 | Wind | Happy 115kV Substation | 10/9/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-044S | Swisher County | TX | SWPS | 10/1/2011 | 18 | 18 | 18 | 0 | 0 | 0 | Wind | Claytonville 69kV | 9/30/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-043 | Rush County | KS | MIDW | 12/31/2013 | 102 | 102 | 102 | 0 | 0 | 0 | Wind | Spearville - Knoll 345kV | 9/14/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-042 | Roger Mills County | OK | WFEC | 6/30/2012 | 414 | 414 | 414 | 0 | 0 | 0 | Wind | Tuco - Woodward 345kV | 9/14/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-041 | Hansford County | TX | SWPS | 6/30/2011 | 300 | 300 | 300 | 0 | 0 | 0 | Wind | Moore County - Hitchland 230kV | 9/10/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-040 | DISIS-2010-001-8 | 03 CENTRAL | Marshall County | KS | WERE | 12/31/2012 | 9/3/2016 | 72 | 72 | 72 | ER | 0 | 0 | 0 | Wind | Tap Smittyville - Knob Hill 115KV | 8/31/2009 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2009-039 | Lea County | NM | SWPS | 12/31/2012 | 147 | 147 | 147 | 0 | 0 | 0 | Wind | Eddy-Tolk 345 | 8/31/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-038 | Hobbs | NM | SWPS | 9/1/2011 | 99 | 99 | 99 | 0 | 0 | 0 | Wind | Hobbs 230kV | 8/27/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-037 | Murray County | OK | OKGE | 5/31/2011 | 202 | 202 | 202 | 0 | 0 | 0 | Wind | Sunnyside - Lawton Eastside 345kV | 8/27/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-036 | Murray | OK | OKGE | 5/31/2011 | 202 | 202 | 202 | 0 | 0 | 0 | Wind | Sunnyside - Lawton Eastside 345kV | 8/27/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-035 | Grady County | OK | WFEC | 10/31/2012 | 102 | 102 | 102 | 0 | 0 | 0 | Wind | Cimarron - Lawton Eastside 345kV | 8/27/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-034 | Grady County | OK | WFEC | 10/31/2012 | 102 | 102 | 102 | 0 | 0 | 0 | Wind | Cimarron - Lawton Eastside 345kV | 8/27/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-033 | Beaver County | OK | SWPS | 12/31/2012 | 87 | 87 | 87 | 0 | 0 | 0 | Wind | Ochiltree 115kV | 8/21/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-032S | Oklahoma City | OK | OKGE | 8/1/2010 | 6.4 | 0 | 0 | 0 | 0 | 0 | Thermal | Gas | Foster 138kV | 8/18/2009 | 5/16/2011 | WITHDRAWN | N/A | ||||||||||||
| GEN-2009-031 | Holt County | MO | KCPL | 10/31/2011 | 149.5 | 149.5 | 149.5 | 0 | 0 | 0 | Wind | Holt County 69 kV | 8/5/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-030 | Custer County | OK | WFEC | 7/1/2012 | 100.8 | 100.8 | 100.8 | 0 | 0 | 0 | Wind | Weatherford 138kV | 8/3/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-029 | Holt County | MO | KCPL | 12/1/2012 | 300 | 300 | 300 | 0 | 0 | 0 | Wind | Saint Joseph 161kV | 7/18/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-028 | Jasper County | MO | EDE | 12/31/2015 | 150 | 150 | 150 | 0 | 0 | 0 | Wind | Neosho - Morgan 345kV | 7/17/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-027 | Jasper County | MO | EDE | 12/31/2014 | 150 | 150 | 150 | 0 | 0 | 0 | Wind | Neosho - Morgan 345kV | 7/17/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-026 | Rush County | KS | MIDW | 12/31/2012 | 102 | 102 | 102 | 0 | 0 | 0 | Wind | Spearville - Knoll 345kV | 7/14/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-025 | DISIS-2009-001-6 | 04 SOUTHEAST | Kay County | OK | OKGE | 12/31/2011 | 11/1/2012 | 59.8 | 59.8 | 59.8 | ER | 0 | 0 | 0 | Wind | TAP Deer Creek – Sinclair 69kV | 6/19/2009 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2009-024S | Masterson | TX | SWPS | 12/1/2011 | 18 | 18 | 18 | 0 | 0 | 0 | Wind | Exell Substation 115 kV Sub | 6/15/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-023S | Masterson | TX | SWPS | 4/1/2011 | 18 | 18 | 18 | 0 | 0 | 0 | Wind | Exell Substation 115 kV Sub | 6/15/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-022 | Rawlins County | KS | MIDW | 1/1/2011 | 467.5 | 467.5 | 467.5 | 0 | 0 | 0 | Wind | Attwood 115kV Sub | 6/2/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-021 | Holcomb | KS | SUNC | 6/15/2015 | 895 | 0 | 0 | 0 | 0 | 0 | Thermal | Coal | Holcomb 345kV | 5/11/2009 | WITHDRAWN | N/A | |||||||||||||
| GEN-2009-020 | DISIS-2010-001-8 | 03 CENTRAL | Rush County | KS | MIDW | 12/31/2011 | 10/15/2015 | 48.3 | 48.3 | 48.3 | ER | 0 | 0 | 0 | Wind | Tap Nekoma - Bazine (Walnut Creek) 69kV | 4/15/2009 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2009-019S | Rush County | KS | MIDW | 12/31/2011 | 19.5 | 19.5 | 19.5 | 0 | 0 | 0 | Wind | Nekoma - Balzine 69kV | 4/15/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-018 | Hansford County | TX | SWPS | 12/31/2011 | 200.1 | 200.1 | 200.1 | 0 | 0 | 0 | Wind | Moore County - Hitchland 230kV | 4/6/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-017 | Reagan County | TX | SWPS | 6/1/2011 | 60 | 60 | 60 | 0 | 0 | 0 | Wind | TAP PEMBROOK-STILES 138kV | 4/1/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-016 | Elk City | OK | AEPW | 12/1/2011 | 100.3 | 100.3 | 100.3 | ER | 0 | 0 | 0 | Wind | Falcon Road 138kV | 3/31/2009 | 5/10/2011 | WITHDRAWN | N/A | ||||||||||||
| GEN-2009-015 | Pawnee County | KS | MIDW | 12/31/2011 | 72 | 72 | 72 | 0 | 0 | 0 | Wind | Spearville - Mullergren 230kV | 3/26/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-014 | Great Bend | KS | MKEC | 5/1/2011 | 151 | 0 | 0 | 0 | 0 | 0 | Thermal | Gas | Mullergren 115kV | 3/23/2009 | WITHDRAWN | N/A | |||||||||||||
| GEN-2009-013 | Dodge City | KS | MKEC | 5/1/2011 | 151 | 0 | 0 | 0 | 0 | 0 | Thermal | Gas | North Judson Large 115kV | 3/23/2009 | WITHDRAWN | N/A | |||||||||||||
| GEN-2009-012 | Holt County | MO | MIPU | 12/31/2012 | 300 | 300 | 300 | 0 | 0 | 0 | Wind | Cooper - St. Joseph 345kV | 3/20/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-011 | Rooks County | KS | MKEC | 7/31/2011 | 50 | 50 | 50 | ER | 0 | 0 | 0 | Wind | Tap Plainsville - Phillipsburg 115kV | 3/18/2009 | WITHDRAWN | N/A | |||||||||||||
| GEN-2009-010 | Barton County | KS | MKEC | 9/1/2011 | 199.5 | 199.5 | 199.5 | 0 | 0 | 0 | Wind | Mullergreen 230kV | 3/10/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-009 | Barton County | KS | SUNC | 9/1/2011 | 150 | 150 | 150 | 0 | 0 | 0 | Wind | Pioneer Tap 115kV | 3/10/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-008 | DISIS-2010-001-8 | 03 CENTRAL | Ness County | KS | MIDW | 9/1/2011 | 12/1/2015 | 198.69 | 198.69 | 198.69 | ER | 0 | 0 | 0 | Wind | South Hays 230kV | 3/10/2009 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2009-007 | Midland | TX | SWPS | 1/1/2012 | 550 | 0 | 0 | 0 | 0 | 0 | Thermal | Gas | Midland 345kV | 2/20/2009 | WITHDRAWN | N/A | |||||||||||||
| GEN-2009-006 | Washington County | AR | AEPW | 12/31/2010 | 60 | 60 | 60 | 0 | 0 | 0 | Wind | SE FAYETTEVILLE 161kV | 2/18/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-005 | Lyon County | KS | WERE | 12/1/2010 | 200.1 | 200.1 | 200.1 | 0 | 0 | 0 | Wind | 2/13/2009 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2009-004 | Woodward County | OK | WFEC | 10/1/2010 | 161 | 161 | 161 | 0 | 0 | 0 | Wind | 2/12/2009 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2009-003O1 | Cass County | NE | OPPD | 12/31/2011 | 80 | 80 | 80 | 0 | 0 | 0 | Wind | Cass County - Brock 161kV | 2/10/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-003O | Otoe County | NE | OPPD | 12/31/2011 | 80 | 80 | 80 | 0 | 0 | 0 | Wind | S974 69kV | 2/10/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-003 | Pratt County | KS | SUNC | 12/1/2010 | 199.5 | 199.5 | 199.5 | 0 | 0 | 0 | Wind | St John - Pratt 115 kV line | 2/2/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2009-002 | Lubbock County | TX | SWPS | 5/1/2012 | 306 | 0 | 0 | 0 | 0 | 0 | Thermal | Gas | Jones 230kV | 1/9/2009 | WITHDRAWN | N/A | |||||||||||||
| GEN-2009-001 | Lubbock County | TX | SWPS | 5/1/2012 | 128 | 0 | 0 | 0 | 0 | 0 | Thermal | Gas | Jones 230kV | 1/9/2009 | WITHDRAWN | N/A | |||||||||||||
| GEN-2008-136 | Odessa | TX | SWPS | 1/1/2012 | 531 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 12/31/2008 | WITHDRAWN | N/A | |||||||||||||
| GEN-2008-135 | Odessa | TX | SWPS | 1/1/2012 | 531 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 12/31/2008 | WITHDRAWN | N/A | |||||||||||||
| GEN-2008-134 | Kingfisher County | OK | OKGE | 1/1/2012 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | 12/31/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-133 | Seward County | KS | SUNC | 12/31/2012 | 800 | 800 | 800 | ER | 0 | 0 | 0 | Wind | 12/31/2009 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-132 | Lea County | NM | SWPS | 5/1/2013 | 604 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Steam | 12/30/2008 | WITHDRAWN | N/A | |||||||||||||
| GEN-2008-131 | Hockley County | TX | SWPS | 5/1/2012 | 128 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 12/30/2008 | WITHDRAWN | N/A | |||||||||||||
| GEN-2008-130 | Floyd County | TX | SWPS | 12/31/2011 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | 12/19/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-129 | DISIS-2009-001-6 | 03 CENTRAL | Cass County | MO | MIPU | 5/1/2009 | 2/15/2002 | 72 | 643 | 675 | ER | 0 | 0 | 0 | Thermal | CT | Pleasant Hill 161kV | 12/12/2008 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2008-128 | Hale County | TX | SWPS | 5/1/2013 | 330 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 12/9/2008 | WITHDRAWN | N/A | |||||||||||||
| GEN-2008-127 | Sumner County | KS | WERE | 10/31/2011 | 200.1 | 200.1 | 200.1 | ER | 0 | 0 | 0 | Wind | Tap Rosehill - Sooner 345kV | 12/5/2008 | 4/11/2011 | WITHDRAWN | N/A | ||||||||||||
| GEN-2008-126 | Garfield County | OK | OKGE | 12/30/2012 | 240 | 240 | 240 | ER | 0 | 0 | 0 | Wind | 12/5/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-125O | Burt County | NE | OPPD | 12/31/2010 | 80 | 80 | 80 | ER | 0 | 0 | 0 | Wind | 12/2/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-125 | Hale County | TX | SWPS | 5/1/2012 | 330 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 11/25/2008 | WITHDRAWN | N/A | |||||||||||||
| GEN-2008-124T | Keys | OK | SWPS | 42 | 42 | 42 | ER | 0 | 0 | 0 | Wind | TC-Keyes Texas County 69kV | 10/3/2013 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-124N | NE | NPPD | 165 | 0 | 0 | ER | 0 | 0 | 0 | Nuclear | 11/20/2008 | WITHDRAWN | N/A | ||||||||||||||||
| GEN-2008-124 | DISIS-2009-001-6 | 03 CENTRAL | Ford County | KS | SUNC | 1/1/2016 | 2/28/2017 | 200.1 | 200.1 | 200.1 | ER | 0 | 0 | 0 | Wind | Clark County-Spearville Ckt 1 (Ironwood) 345kV | 11/14/2008 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2008-123N | DISIS-2010-001-8 | 02 NEBRASKA | Webster County | NE | NPPD | 12/31/2016 | 11/16/2017 | 89.66 | 89.66 | 89.66 | ER | 0 | 0 | 0 | Wind | Tap Pauline - Hildreth (Rosemont) 115kV | 11/12/2008 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2008-123 | Putnam | OK | OKGE | 12/31/2010 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | 11/5/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-122 | Pawnee County | KS | MIDW | 12/31/2011 | 105 | 105 | 105 | ER | 0 | 0 | 0 | Wind | 11/3/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-121O | Cass County | NE | OPPD | 1/1/2014 | 249 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Steam | 10/9/2008 | WITHDRAWN | N/A | |||||||||||||
| GEN-2008-121N02 | NE | NPPD | 10/31/2008 | 159 | 159 | 159 | ER | 0 | 0 | 0 | Wind | 10/31/2008 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2008-121N01 | Saline County | NE | NPPD | 400 | 400 | 400 | ER | 0 | 0 | 0 | Wind | 10/10/2008 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2008-121 | Motley Co | TX | SWPS | 3/1/2011 | 149.5 | 149.5 | 149.5 | ER | 0 | 0 | 0 | Wind | 10/9/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-120 | Randall Co | TX | SWPS | 3/1/2011 | 239.2 | 239.2 | 239.2 | ER | 0 | 0 | 0 | Wind | 10/9/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-119O | ICS-2008-001 Prior Queued | 02 NEBRASKA | Richardson County | NE | OPPD | 12/31/2009 | 60 | 60 | 60 | ER | 0 | 0 | 0 | Wind | S1399 161kV | 10/8/2008 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||
| GEN-2008-119 | Scott County | KS | SUNC | 12/15/2012 | 179.4 | 179.4 | 179.4 | ER | 0 | 0 | 0 | Wind | 10/2/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-118 | Scott County | KS | SUNC | 12/15/2011 | 161 | 161 | 161 | ER | 0 | 0 | 0 | Wind | 10/2/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-117 | Scott County | KS | SUNC | 12/15/2010 | 161 | 161 | 161 | ER | 0 | 0 | 0 | Wind | 10/2/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-116 | Parmer County | TX | SWPS | 3/1/2011 | 70 | 70 | 70 | ER | 0 | 0 | 0 | Wind | 10/1/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-115 | Woodward County | OK | WFEC | 12/31/2011 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | 9/26/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-114 | Enid | OK | OKGE | 12/31/2015 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 9/25/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-113 | Enid | OK | OKGE | 12/31/2015 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 9/25/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-112 | Harper County | OK | WFEC | 10/1/2011 | 500 | 500 | 500 | ER | 0 | 0 | 0 | Wind | 9/22/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-111 | Noble | OK | OKGE | 7/1/2010 | 400 | 400 | 400 | ER | 0 | 0 | 0 | Wind | 9/18/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-110 | Texas | OK | SWPS | 7/31/2011 | 299.2 | 299.2 | 299.2 | ER | 0 | 0 | 0 | Wind | 9/15/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-109 | Texas | OK | SWPS | 7/31/2011 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 9/15/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-108 | Moore County | TX | SWPS | 10/1/2012 | 198 | 198 | 198 | ER | 0 | 0 | 0 | Wind | 9/9/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-107 | Kingfisher County | OK | OKGE | 12/31/2011 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 9/4/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-106 | Kingfisher County | OK | OKGE | 12/31/2011 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 9/4/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-105 | Noble County | OK | OKGE | 12/31/2011 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 9/4/2011 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-104 | Noble County | OK | OKGE | 12/31/2011 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 9/4/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-103 | Harper County | OK | WFEC | 12/1/2011 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | 9/3/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-102 | Chaves County | NM | SWPS | 12/1/2010 | 34.2 | 0 | 0 | ER | 0 | 0 | 0 | Solar | 8/25/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-101 | Lea County | NM | SWPS | 12/1/2010 | 34.2 | 0 | 0 | ER | 0 | 0 | 0 | Solar | 8/25/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-100 | Lynn County | TX | SWPS | 12/1/2010 | 180 | 180 | 180 | ER | 0 | 0 | 0 | Wind | 8/25/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-099 | Coffey County | KS | WERE | 12/31/2011 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 8/22/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-098 | DISIS-2010-001-8 | 03 CENTRAL | Coffey County | KS | WERE | 12/31/2011 | 11/30/2015 | 99.5 | 99.5 | 99.5 | ER | 0 | 0 | 0 | Wind | Waverly 345kV | 8/22/2008 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2008-097 | Reno County | KS | WERE | 12/31/2011 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 8/22/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-096 | Reno County | KS | WERE | 12/31/2011 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 8/22/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-095 | Wilbarger County | TX | AEPW | 9/1/2011 | 200 | 0 | 0 | 0 | 0 | 0 | Hydro | 8/19/2008 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2008-094 | Wilbarger County | TX | AEPW | 9/1/2011 | 100 | 0 | 0 | 0 | 0 | 0 | Hydro | 8/19/2008 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2008-093 | Roosevelt County | NM | SWPS | 12/31/2012 | 525 | 525 | 525 | ER | 0 | 0 | 0 | Wind | 8/18/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-092 | DISIS-2009-001-6 | 03 CENTRAL | Ellis County | KS | MIDW | 12/1/2011 | 11/30/2015 | 200.5 | 200.5 | 200.5 | ER | 0 | 0 | 0 | Wind | Post Rock 230kV | 8/18/2008 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2008-091 | Grant County | OK | OKGE | 1/1/2011 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | 8/14/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-090 | Beaver County | OK | WFEC | 1/1/2012 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | 8/14/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-089 | Western Ellis County | KS | MIDW | 12/31/2011 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 8/14/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-088 | Oldham County | TX | SWPS | 12/1/2011 | 50.6 | 50.6 | 50.6 | ER | 0 | 0 | 0 | Wind | Vega 69kV | 8/12/2008 | 5/6/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2008-087 | Ford County | KS | SUNC | 12/1/2012 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | 8/12/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-086N02 | DISIS-2009-001-6 | 02 NEBRASKA | Antelope County | NE | NPPD | 12/31/2014 | 201 | 201 | 201 | ER | 0 | 0 | 0 | Wind | Meadow Grove 230kV | 8/8/2008 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||
| GEN-2008-086N01 | NE | NPPD | 1/1/2010 | 99 | 99 | 99 | ER | 0 | 0 | 0 | Wind | 8/8/2008 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2008-086N | NE | NPPD | 99 | 99 | 99 | ER | 0 | 0 | 0 | Wind | 8/8/2008 | WITHDRAWN | N/A | ||||||||||||||||
| GEN-2008-086 | Woodward County | OK | WFEC | 10/1/2011 | 250 | 250 | 250 | ER | 0 | 0 | 0 | Wind | 8/6/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-085 | Lamb County | TX | SWPS | 12/31/2011 | 135 | 135 | 135 | ER | 0 | 0 | 0 | Wind | 8/5/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-084 | Oldham County | TX | SWPS | 6/1/2011 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | 8/1/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-083 | Garza County | TX | SWPS | 6/1/2010 | 99.9 | 99.9 | 99.9 | ER | 0 | 0 | 0 | Wind | 8/1/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-082 | Lipscomb County | TX | SWPS | 12/31/2015 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | 7/31/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-081 | Meade County | KS | SUNC | 12/31/2012 | 110 | 110 | 110 | ER | 0 | 0 | 0 | Wind | 7/30/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-080 | Seward County | KS | SUNC | 12/31/2012 | 80 | 80 | 80 | ER | 0 | 0 | 0 | Wind | 7/30/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-079 | DISIS-2009-001-6 | 03 CENTRAL | Gray County | KS | MKEC | 12/1/2010 | 11/2/2011 | 98.9 | 98.9 | 98.9 | ER | 0 | 0 | 0 | Wind | Crooked Creek 115kV | 7/29/2008 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2008-078 | Woodward County | OK | WFEC | 12/31/2011 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 7/28/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-077 | Roger Mills County | OK | WFEC | 7/31/2011 | 220 | 220 | 220 | ER | 0 | 0 | 0 | Wind | 7/28/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-076 | Barber County | KS | MKEC | 10/1/2011 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | 7/18/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-075 | Barber County | KS | MKEC | 10/1/2011 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | 7/18/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-074 | Barber County | KS | MKEC | 10/1/2010 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | 7/18/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-073 | Barber County | KS | MKEC | 10/1/2010 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | 7/18/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-072 | Lamb County | TX | SWPS | 1/1/2011 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | 7/16/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-071 | Kay County | OK | OKGE | 11/1/2010 | 76.8 | 76.8 | 76.8 | ER | 0 | 0 | 0 | Wind | Newkirk 138kV | 7/14/2008 | WITHDRAWN | N/A | |||||||||||||
| GEN-2008-070S | Tulsa | OK | AEPW | 16.8 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Bio | 7/14/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-069 | Roosevelt County | NM | SWPS | 9/1/2011 | 298.5 | 298.5 | 298.5 | ER | 0 | 0 | 0 | Wind | 7/10/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-068 | Lincoln County | KS | MIDW | 10/1/2011 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 7/2/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-067 | Hereford | TX | SWPS | 12/1/2011 | 160 | 160 | 160 | ER | 0 | 0 | 0 | Wind | 6/30/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-066 | Hamilton County | KS | SUNC | 8/30/2010 | 120 | 120 | 120 | ER | 0 | 0 | 0 | Wind | 6/23/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-065 | Ellis County | OK | OKGE | 12/31/2012 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | 6/18/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-064 | Roosevelt County | NM | SWPS | 10/10/2010 | 201 | 201 | 201 | ER | 0 | 0 | 0 | Wind | 6/17/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-063 | Beaver County | OK | SWPS | 12/1/2012 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 6/16/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-062 | Beaver County | OK | MKEC | 12/1/2012 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 6/16/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-061 | Lincoln County | KS | MIDW | 12/1/2010 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 6/10/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-060 | Edwards County | KS | WPEK | 12/1/2010 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | 6/10/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-059 | Barber County | KS | WPEK | 12/1/2010 | 100.8 | 100.8 | 100.8 | ER | 0 | 0 | 0 | Wind | 6/10/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-058 | Roosevelt County | NM | SWPS | 11/1/2010 | 201 | 201 | 201 | ER | 0 | 0 | 0 | Wind | 6/9/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-057 | Pawnee County | OK | GRDA | 12/31/2011 | 259.5 | 259.5 | 259.5 | ER | 0 | 0 | 0 | Wind | 6/9/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-056S | Carter County | OK | OKGE | 3/1/2009 | 4.8 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 6/6/2008 | WITHDRAWN | N/A | |||||||||||||
| GEN-2008-055 | Smith County | KS | SUNC | 11/1/2011 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | 6/5/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-054 | Woodward County | OK | WFEC | 12/31/2011 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 6/4/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-053 | Gray County | TX | SWPS | 12/31/2009 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 6/2/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-052 | Parmer County | TX | SWPS | 12/31/2009 | 65 | 65 | 65 | ER | 0 | 0 | 0 | Wind | 6/2/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-051 | DISIS-2009-001-6 | 05 SOUTHWEST | Oldham County | TX | SWPS | 12/31/2010 | 12/31/2014 | 161 | 161 | 161 | ER | 0 | 0 | 0 | Wind | Potter County 345kV | 5/30/2008 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2008-050 | Lea County | NM | SWPS | 12/31/2010 | 201 | 201 | 201 | ER | 0 | 0 | 0 | Wind | 5/27/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-049 | Cloud County | KS | WPEK | 12/31/2012 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | 5/23/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-048 | Kiowa County | CO | SWPS | 1/5/2011 | 500 | 500 | 500 | ER | 0 | 0 | 0 | Wind | 5/23/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-047 | DISIS-2010-001-8 | 05 SOUTHWEST | Beaver County | OK | OKGE | 12/31/2012 | 12/31/2014 | 263.13 | 263.13 | 263.13 | ER | 0 | 0 | 0 | Wind | Hitchland-Woodward EHV Dbl Ckt (Beaver County) 345kV | 5/16/2008 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2008-046 | Murray County | OK | OKGE | 12/1/2010 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Sunnyside 345kV | 5/16/2008 | 5/30/2013 | WITHDRAWN | N/A | ||||||||||||
| GEN-2008-045 | Woodward County | OK | OKGE | 12/1/2010 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | 5/15/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-044 | DISIS-2010-001-8 | 04 SOUTHEAST | Dewey County | OK | OKGE | 12/1/2011 | 2/28/2012 | 197.8 | 197.8 | 197.8 | ER | 0 | 0 | 0 | Wind | Tatonga 345kV | 5/15/2008 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2008-043 | Garfied County | OK | OKGE | 12/1/2011 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 5/12/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-042 | Garfield County | OK | OKGE | 12/1/2012 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | 5/12/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-041 | Motley County | TX | SWPS | 12/1/2010 | 135 | 135 | 135 | ER | 0 | 0 | 0 | Wind | 5/12/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-040 | Rogers Mills County | OK | WFEC | 12/1/2010 | 120 | 120 | 120 | ER | 0 | 0 | 0 | Wind | 5/12/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-039 | Beckham County | OK | AEPW | 12/1/2010 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 5/12/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-038 | Osage County | OK | AEPW | 12/1/2010 | 144 | 144 | 144 | ER | 0 | 0 | 0 | Wind | 5/12/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-037 | DISIS-2010-001-8 | 04 SOUTHEAST | Commanche County | OK | WFEC | 11/30/2011 | 12/17/2011 | 99 | 99 | 99 | ER | 0 | 0 | 0 | Wind | Tap Washita - Blue Canyon Wind 138kV | 5/12/2008 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2008-036 | Canadian County | OK | OKGE | 12/31/2011 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 5/12/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-035 | Canadian County | OK | OKGE | 12/31/2011 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 5/12/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-034 | Murray County | OK | OKGE | 12/31/2010 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 5/12/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-033 | Murray County | OK | OKGE | 12/31/2010 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 5/12/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-032 | Swisher County | TX | SWPS | 12/31/2010 | 80 | 80 | 80 | ER | 0 | 0 | 0 | Wind | 5/1/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-031 | Wilbarger County | TX | AEPW | 11/5/2011 | 4000 | 4000 | 4000 | ER | 0 | 0 | 0 | Wind | 4/30/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-030N | Dixon County | NE | NPPD | 201 | 201 | 201 | ER | 0 | 0 | 0 | Wind | 4/29/2008 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2008-030 | LeFlore County | OK | OKGE | 10/1/2013 | 660 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 4/21/2008 | WITHDRAWN | N/A | |||||||||||||
| GEN-2008-029 | Ellis County | OK | OKGE | 1/1/2010 | 250.5 | 250.5 | 250.5 | ER | 0 | 0 | 0 | Wind | Woodward EHV 138kV | 4/17/2008 | 4/12/2011 | WITHDRAWN | N/A | ||||||||||||
| GEN-2008-028 | Texas County | OK | SWPS | 12/31/2012 | 360 | 360 | 360 | ER | 0 | 0 | 0 | Wind | 4/17/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-027 | Morris County | KS | WERE | 12/31/2010 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | 4/16/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-026 | Thomas County | KS | SUNC | 10/15/2009 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | 4/9/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-025 | Sherman County | KS | SUNC | 11/1/2009 | 101.2 | 101.2 | 101.2 | ER | 0 | 0 | 0 | Wind | Ruleton 115kV | 4/4/2008 | 4/25/2011 | WITHDRAWN | N/A | ||||||||||||
| GEN-2008-024 | Clark County | KS | SUNC | 12/1/2012 | 1000 | 1000 | 1000 | ER | 0 | 0 | 0 | Wind | 3/28/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-023 | DISIS-2009-001-6 | 04 SOUTHEAST | Washita County | OK | AEPW | 12/1/2010 | 11/30/2012 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | Hobart Junction 138kV | 3/28/2008 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2008-022 | DISIS-2010-001-8 | 05 SOUTHWEST | Chaves County | NM | SWPS | 9/1/2011 | 11/15/2015 | 299.65 | 299.65 | 299.65 | ER | 0 | 0 | 0 | Wind | Eddy County-Tolk (Crossroads) 345kV | 3/28/2008 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2008-021 | Coffey County | KS | WERE | 5/16/2011 | 5/16/2011 | 42 | 42 | 42 | ER | 0 | 0 | 0 | Nuclear | Wolf Creek 345kV | 3/24/2008 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||
| GEN-2008-020 | Dewey County | OK | AEPW | 12/31/2012 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | 3/17/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-019 | Dewey County | OK | OKGE | 12/31/2012 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | Tatonga 345kV | 3/17/2008 | 3/19/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2008-018 | ICS-2008-001-6 | 03 CENTRAL | Finney County | KS | SWPS | 12/31/2012 | 12/13/2013 | 250 | 250 | 250 | ER | 0 | 0 | 0 | Wind | Finney 345kV | 3/17/2008 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2008-017 | Scott County | KS | SUNC | 3/1/2012 | 10/1/2017 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | Setab 345kV | 3/11/2008 | 1/31/2011 | WITHDRAWN | N/A | |||||||||||
| GEN-2008-016 | Lynn County | TX | SWPS | 5/1/2011 | 248 | 248 | 248 | ER | 0 | 0 | 0 | Wind | Grassland 230kV | 3/5/2008 | 11/5/2012 | WITHDRAWN | N/A | ||||||||||||
| GEN-2008-015 | Floyd County | TX | SWPS | 12/1/2011 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 3/3/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-014 | Floyd County | TX | SWPS | 12/1/2010 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | Tap Tuco - Oklaunion 345kV | 3/3/2008 | 12/7/2010 | WITHDRAWN | N/A | ||||||||||||
| GEN-2008-013 | ICS-2008-001-6 | 04 SOUTHEAST | Garfield County | OK | OKGE | 10/1/2010 | 12/7/2012 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | Hunter 345kV | 2/19/2008 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2008-012 | Benton County | AR | EDE | 10/1/2010 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 2/19/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-011 | Finney County | KS | SUNC | 10/1/2010 | 600 | 600 | 600 | ER | 0 | 0 | 0 | Wind | 2/19/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-010 | Choctaw County | OK | WFEC | 1/1/2013 | 50 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 2/19/2008 | WITHDRAWN | N/A | |||||||||||||
| GEN-2008-009 | Chaves County | NM | SWPS | 3/1/2012 | 60 | 60 | 60 | ER | 0 | 0 | 0 | Wind | San Juan Tap 230kV | 2/18/2008 | 6/30/2011 | WITHDRAWN | N/A | ||||||||||||
| GEN-2008-008 | Garza County | TX | SWPS | 12/31/2010 | 60 | 60 | 60 | ER | 0 | 0 | 0 | Wind | Graham 69kV | 2/13/2008 | 5/19/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2008-007 | Garza County | TX | SWPS | 12/1/2009 | 102 | 102 | 102 | ER | 0 | 0 | 0 | Wind | 2/12/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-006 | Caddo Parish | LA | AEPW | 6/1/2010 | 6/16/2010 | 30 | 30 | 30 | ER | 0 | 0 | 0 | Thermal | Gas | Arsenal Hill 138kV | 1/31/2008 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||
| GEN-2008-005 | Mayes County | OK | GRDA | 1/9/2009 | 9/2/2009 | 16 | 16 | 16 | ER | 0 | 0 | 0 | Hydro | 1/28/2008 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||||
| GEN-2008-004 | Borden County | TX | SWPS | 9/1/2009 | 80 | 80 | 80 | ER | 0 | 0 | 0 | Wind | 1/28/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2008-003 | ICS-2008-001-6 | 04 SOUTHEAST | Woodward | OK | OKGE | 8/31/2009 | 12/14/2009 | 101.2 | 101.2 | 101.2 | ER | 0 | 0 | 0 | Wind | Woodward EHV 138kV | 1/25/2008 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2008-002 | Platte County | MO | KACP | 1/1/2009 | 4/12/2009 | 65 | 65 | 65 | ER | 0 | 0 | 0 | Thermal | Coal | 1/22/2008 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||
| GEN-2008-001 | Ellis County | KS | MIDW | 12/1/2010 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | 1/21/2008 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-065 | Osborne County | KS | MKEC | 12/31/2010 | 50 | 50 | 50 | ER | 0 | 0 | 0 | Wind | 12/28/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-064 | Ness County | KS | MIDW | 12/31/2010 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 12/28/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-063 | Harper | OK | WFEC | 12/31/2011 | 840 | 840 | 840 | ER | 0 | 0 | 0 | Wind | 12/27/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-062 | ICS-2008-001-6 | 04 SOUTHEAST | Harper County | OK | OKGE | 12/31/2011 | 12/21/2016 | 424 | 424 | 424 | ER | 0 | 0 | 0 | Wind | Woodward EHV 345kV | 12/27/2007 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2007-061 | Ellis | OK | OKGE | 12/31/2011 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | 12/19/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-060 | Blaine | OK | OKGE | 12/1/2012 | 202 | 202 | 202 | ER | 0 | 0 | 0 | Wind | 12/18/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-059 | Stevens | KS | SWPS | 12/31/2012 | 202 | 202 | 202 | ER | 0 | 0 | 0 | Wind | 12/18/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-058 | Stevens | KS | SWPS | 12/31/2011 | 202 | 202 | 202 | ER | 0 | 0 | 0 | Wind | 12/18/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-057 | Moore County | TX | SWPS | 5/1/2009 | 34.5 | 34.5 | 34.5 | ER | 0 | 0 | 0 | Wind | Moore County East 115kV | 12/13/2007 | 8/7/2013 | WITHDRAWN | N/A | ||||||||||||
| GEN-2007-056 | Cimarron County | OK | SWPS | 12/1/2009 | 600 | 600 | 600 | ER | 0 | 0 | 0 | Wind | 12/13/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-055 | Lea County | NM | SWPS | 12/30/2010 | 250 | 250 | 250 | ER | 0 | 0 | 0 | Wind | 12/4/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-054 | Lea County | NM | SWPS | 1/1/2013 | 550 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 12/3/2007 | WITHDRAWN | N/A | |||||||||||||
| GEN-2007-053 | Nodaway County | MO | MIPU | 1/10/2010 | 110 | 110 | 110 | ER | 0 | 0 | 0 | Wind | Tap Maryville - Midway (GEN-2006-014 TAP) 161kV | 11/19/2007 | 1/30/2012 | WITHDRAWN | N/A | ||||||||||||
| GEN-2007-052 | ICS-2008-001-6 | 04 SOUTHEAST | Caddo County | OK | WFEC | 5/1/2009 | 7/1/2009 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Thermal | Gas | Anadarko 138kV | 11/9/2007 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2007-051 | Woodward County | OK | WFEC | 12/1/2009 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Mooreland 138kV | 11/7/2007 | 1/14/2013 | WITHDRAWN | N/A | ||||||||||||
| GEN-2007-050 | ICS-2008-001-6 | 04 SOUTHEAST | Woodward County | OK | OKGE | 10/1/2009 | 12/23/2010 | 151.8 | 151.8 | 151.8 | ER | 0 | 0 | 0 | Wind | Woodward EHV 138kV | 10/22/2007 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2007-049 | Beckham County | OK | WFEC | 12/31/2009 | 60 | 60 | 60 | ER | 0 | 0 | 0 | Wind | 10/22/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-048 | Randall County | TX | SWPS | 11/1/2009 | 400 | 400 | 400 | ER | 0 | 0 | 0 | Wind | Tap Amarillo S - Swisher 230kV | 10/17/2007 | 1/15/2014 | WITHDRAWN | N/A | ||||||||||||
| GEN-2007-047 | Thomas County | KS | SUNC | 7/1/2009 | 204 | 204 | 204 | ER | 0 | 0 | 0 | Wind | 10/17/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-046 | ICS-2008-001-6 | 05 SOUTHWEST | Texas County | OK | SWPS | 12/31/2011 | 12/15/2015 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Hitchland 115kV | 10/15/2007 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2007-045 | Carson County | TX | SWPS | 12/31/2011 | 171 | 171 | 171 | ER | 0 | 0 | 0 | Wind | 10/15/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-044 | ICS-2008-001-6 | 04 SOUTHEAST | Blaine County | OK | OKGE | 12/1/2009 | 12/31/2014 | 299.2 | 299.2 | 299.2 | ER | 0 | 0 | 0 | Wind | Tatonga 345kV | 10/2/2007 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2007-043 | ICS-2008-001-6 | 04 SOUTHEAST | Grady County | OK | OKGE | 12/1/2009 | 11/1/2010 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Minco 345kV | 10/2/2007 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2007-042 | Hansford County | TX | SWPS | 9/30/2010 | 360 | 360 | 360 | ER | 0 | 0 | 0 | Wind | 9/28/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-041 | Texas County | OK | SWPS | 12/31/2010 | 600 | 600 | 600 | ER | 0 | 0 | 0 | Wind | 9/27/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-040 | DISIS-2009-001-6 | 03 CENTRAL | Gray County | KS | SUNC | 12/15/2010 | 6/9/2012 | 131.1 | 131.1 | 131.1 | ER | 0 | 0 | 0 | Wind | Buckner 345kV | 9/25/2007 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2007-039 | Hansford County | TX | SWPS | 12/31/2009 | 120 | 120 | 120 | ER | 0 | 0 | 0 | Wind | 9/17/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-038 | Ford County | KS | SUNC | 8/25/2015 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Spearville 345kV | 9/17/2007 | 4/14/2011 | WITHDRAWN | N/A | ||||||||||||
| GEN-2007-037 | Ford County | KS | SUNC | 10/1/2012 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | 9/17/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-036 | Ford County | KS | SUNC | 12/31/2012 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | 9/14/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-035 | Harmon County | OK | AEPW | 12/31/2009 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 9/5/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-034 | Bailey County | TX | SWPS | 8/15/2010 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 8/16/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-033O | Cass County | NE | OPPD | 1/1/2014 | 170 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Steam | 8/10/2007 | 4/1/2009 | WITHDRAWN | N/A | ||||||||||||
| GEN-2007-033 | Hutchinson County | TX | SWPS | 8/1/2009 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | 8/8/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-032 | Custer County | OK | WFEC | 9/15/2013 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | Tap Clinton Junction - Clinton 138kV | 7/25/2007 | 4/4/2011 | WITHDRAWN | N/A | ||||||||||||
| GEN-2007-031 | Lubbock County | TX | SWPS | 12/1/2008 | 51 | 51 | 51 | ER | 0 | 0 | 0 | Wind | 7/20/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-030O | Washington County | NE | OPPD | 11/16/2012 | 67 | 0 | 0 | ER | 0 | 0 | 0 | Nuclear | 7/10/2007 | 4/1/2009 | WITHDRAWN | N/A | |||||||||||||
| GEN-2007-030N | Sheldon | NE | NPPD | 350 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 7/13/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-030 | Gray County | TX | SWPS | 3/1/2009 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | 7/5/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-029 | Caddo | OK | WFEC | 11/1/2010 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | 6/29/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-028 | Cloud | KS | MKEC | 12/1/2010 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | 6/29/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-027 | Curry County | NM | SWPS | 12/1/2009 | 60 | 60 | 60 | ER | 0 | 0 | 0 | Wind | 6/22/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-026 | Deaf Smith County | TX | SWPS | 12/31/2009 | 130.2 | 130.2 | 130.2 | ER | 0 | 0 | 0 | Wind | 5/31/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-025 | ICS-2008-001-6 | 03 CENTRAL | Barber County | KS | WERE | 12/31/2009 | 10/1/2012 | 299.2 | 299.2 | 299.2 | ER | 0 | 0 | 0 | Wind | Viola 345kV | 5/24/2007 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2007-024 | Sherman County | TX | SWPS | 12/31/2009 | 120 | 120 | 120 | ER | 0 | 0 | 0 | Wind | 5/22/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-023 | Pottawatomie | KS | WERE | 5/1/2015 | 800 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 5/18/2007 | WITHDRAWN | N/A | |||||||||||||
| GEN-2007-022 | Anderson County | KS | KCPL | 11/1/2009 | 201 | 201 | 201 | ER | 0 | 0 | 0 | Wind | 5/10/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-021 | ICS-2008-001-6 | 04 SOUTHEAST | Dewey County | OK | OKGE | 8/1/2009 | 12/31/2014 | 198.9 | 198.9 | 198.9 | ER | 0 | 0 | 0 | Wind | Tatonga 345kV | 5/9/2007 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2007-020 | Jackson County | KS | WERE | 6/30/2009 | 50 | 50 | 50 | ER | 0 | 0 | 0 | Wind | 4/24/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-019 | Hamilton | KS | SWPS | 8/30/2009 | 375 | 375 | 375 | ER | 0 | 0 | 0 | Wind | 4/27/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-018 | Pettis County | MO | MIPU | 5/31/2010 | 315 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 4/13/2007 | WITHDRAWN | N/A | |||||||||||||
| GEN-2007-017 | Nodaway | MO | MIPU | 12/31/2009 | 100.5 | 100.5 | 100.5 | ER | 0 | 0 | 0 | Wind | Tap Maryville - Midway (GEN-2006-014 TAP) 161kV | 4/13/2007 | 2/22/2012 | WITHDRAWN | N/A | ||||||||||||
| GEN-2007-016 | Nodaway County | MO | MIPU | 12/31/2009 | 100.5 | 100.5 | 100.5 | ER | 0 | 0 | 0 | Wind | 3/28/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-015 | Nemaha County | KS | WERE | 12/31/2009 | 135 | 135 | 135 | ER | 0 | 0 | 0 | Wind | Tap Kelly(WERE) - S1399(OPPD) 161kV | 3/27/2007 | 7/20/2013 | WITHDRAWN | N/A | ||||||||||||
| GEN-2007-014 | Roger Mills County | OK | WFEC | 12/1/2008 | 135 | 135 | 135 | ER | 0 | 0 | 0 | Wind | 3/27/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-013 | Wichita County | KS | SUNC | 11/30/2009 | 99 | 99 | 99 | ER | 0 | 0 | 0 | Wind | Selkirk 115kV | 3/23/2007 | WITHDRAWN | N/A | |||||||||||||
| GEN-2007-012N | Scottsbluff | NE | NPPD | 8.5 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 3/22/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-012 | Rawlins | KS | SUNC | 10/15/2010 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | 3/20/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-011N09 | Knox County | NE | NPPD | 75 | 75 | 75 | ER | 0 | 0 | 0 | Wind | 3/19/2007 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2007-011N08 | ICS-2008-001 Prior Queued | 02 NEBRASKA | Knox County | NE | NPPD | 1/1/2009 | 81 | 81 | 81 | ER | 0 | 0 | 0 | Wind | Bloomfield 115kV | 3/19/2007 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||
| GEN-2007-011N07 | Boone County | NE | NPPD | 1/1/2010 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 3/19/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-011N06 | Boone County | NE | NPPD | 1/1/2010 | 75 | 75 | 75 | ER | 0 | 0 | 0 | Wind | 3/19/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-011N05 | Springview | NE | NPPD | 10 | 10 | 10 | ER | 0 | 0 | 0 | Wind | 3/15/2007 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2007-011N04 | Holt County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 3/13/2007 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2007-011N03 | Holt County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 3/13/2007 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2007-011N02 | Lancaster County | NE | NPPD | 600 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 3/9/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-011N01 | Lancaster County | NE | NPPD | 400 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 3/9/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-011N | Lancaster County | NE | NPPD | 200 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 3/9/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-011 | Hamilton County | KS | SUNC | 11/1/2008 | 135 | 135 | 135 | ER | 0 | 0 | 0 | Wind | Syracuse 115kV | 3/9/2007 | 4/24/2015 | WITHDRAWN | N/A | ||||||||||||
| GEN-2007-010N05 | Lincoln County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 3/1/2007 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2007-010N04 | Lincoln County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 3/1/2007 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2007-010N03 | Lincoln County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 3/1/2007 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2007-010N02 | Butler County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 3/1/2007 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2007-010N01 | Gage County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 3/1/2007 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2007-010N | Lincoln County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 3/1/2007 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2007-010 | Castro | TX | SWPS | 9/20/2010 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | 2/28/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-009 | Gray County | TX | SWPS | 12/1/2009 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | 2/23/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-008 | Gray County | TX | SWPS | 12/1/2009 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | 2/23/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-007 | Sequoyah | OK | OKGE | 7/31/2011 | 985 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 2/15/2007 | WITHDRAWN | N/A | |||||||||||||
| GEN-2007-006 | Blaine County | OK | OKGE | 12/1/2009 | 160 | 160 | 160 | ER | 0 | 0 | 0 | Wind | Roman Nose 138kV | 2/14/2007 | 6/10/2012 | WITHDRAWN | N/A | ||||||||||||
| GEN-2007-005 | Hutchinson County | TX | SWPS | 12/1/2008 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | 2/5/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-004 | Terry County | TX | SWPS | 5/1/2009 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 2/1/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2007-003 | Sherman County | KS | SUNC | 9/1/2007 | 30 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 1/30/2007 | WITHDRAWN | N/A | |||||||||||||
| GEN-2007-002 | Gray County | TX | SWPS | 9/1/2009 | 160 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | Grapevine 115kV | 1/29/2007 | 1/27/2012 | WITHDRAWN | N/A | |||||||||||
| GEN-2007-001 | Eddy County | NM | SWPS | 12/31/2009 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | 1/19/2007 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2006-049 | Seward County | KS | SWPS | 12/31/2010 | 400 | 400 | 400 | ER | 0 | 0 | 0 | Wind | Tap Finney - Hitchland (Stevens County) 345kV | 12/18/2006 | 10/10/2012 | WITHDRAWN | N/A | ||||||||||||
| GEN-2006-048 | Eddy County | NM | SWPS | 12/31/2010 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 12/8/2006 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2006-047 | Randall County | TX | SWPS | 12/31/2009 | 240 | 240 | 240 | ER | 0 | 0 | 0 | Wind | Tap Bushland - Deaf Smith (Buffalo) 230kV | 12/5/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2006-046 | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Dewey | OK | OKGE | 12/31/2009 | 6/6/2011 | 129.6 | 129.6 | 129.6 | ER | 0 | 0 | 0 | Wind | Dewey 138kV | 12/5/2006 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2006-045 | Randall County | TX | SWPS | 12/31/2008 | 240 | 240 | 240 | ER | 0 | 0 | 0 | Wind | Tap Potter - Plant X 230kV (South Randle County) 230kV | 12/5/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2006-044N02 | Madison County | NE | NPPD | 100.5 | 100.5 | 100.5 | ER | 0 | 0 | 0 | Wind | Tap Ft Randle - Columbus (Madison County) 230kV | 12/4/2006 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2006-044N01 | Petersburg | NE | NPPD | 1/1/2010 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 12/4/2006 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2006-044N | DISIS-2009-001-6 | 02 NEBRASKA | Petersburg | NE | NPPD | 1/1/2010 | 12/31/2011 | 40.5 | 40.5 | 40.5 | ER | 0 | 0 | 0 | Wind | North Petersburg 115kV | 12/4/2006 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2006-044 | ICS-2008-001 Prior Queued | 05 SOUTHWEST | Hansford | TX | SWPS | 10/1/2010 | 12/31/2022 | 370 | 370 | 370 | ER | 0 | 0 | 0 | Wind | Hitchland 345kV | 12/4/2006 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2006-043 | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Beckham County | OK | AEPW | 8/1/2008 | 12/15/2009 | 99 | 99 | 99 | ER | 0 | 0 | 0 | Wind | Sweetwater 230kV | 11/17/2006 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2006-042 | LeFlore Co. | OK | OKGE | 6/1/2012 | 600 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 11/13/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2006-041S | Thomas County | KS | MIDW | 8/31/2008 | 19.8 | 19.8 | 19.8 | ER | 0 | 0 | 0 | Wind | 11/9/2006 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2006-040 | Thomas County | KS | SUNC | 8/31/2008 | 108 | 108 | 108 | ER | 0 | 0 | 0 | Wind | Mingo 115kV | 11/7/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2006-039 | Randall | TX | SWPS | 10/1/2008 | 400 | 400 | 400 | ER | 0 | 0 | 0 | Wind | Tap Potter - Plant X 230kV (South Randle County) 230kV | 10/30/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2006-038N024 | Kearney County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 10/26/2006 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2006-038N023 | Greeley County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 10/26/2006 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2006-038N022 | Antelope County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 10/26/2006 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2006-038N021 | Brown County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 10/26/2006 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2006-038N020 | Antelope County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 10/26/2006 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2006-038N019 | ICS-2008-001 Prior Queued | 02 NEBRASKA | Boone County | NE | NPPD | 5/1/2011 | 10/31/2011 | 80 | 80 | 80 | ER | 0 | 0 | 0 | Wind | Petersburg North 115kV | 10/26/2006 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2006-038N018 | Clay County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 10/26/2006 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2006-038N017 | Filmore County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 10/26/2006 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2006-038N016 | Hamilton County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 10/26/2006 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2006-038N015 | York County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 10/26/2006 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2006-038N014 | Madison County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 10/26/2006 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2006-038N013 | Sioux County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 10/17/2006 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2006-038N012 | Lincoln | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 10/17/2006 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2006-038N011 | Wayne County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 10/17/2006 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2006-038N010 | Cedar County | NE | NPPD | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | 10/17/2006 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2006-038N009 | Knox County | NE | NPPD | 250 | 250 | 250 | ER | 0 | 0 | 0 | Wind | 10/17/2006 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2006-038N008 | Brown County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 10/17/2006 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2006-038N007 | Custer County | NE | NPPD | 1/1/2010 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 10/17/2006 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2006-038N006 | Custer County | NE | NPPD | 1/1/2010 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 10/17/2006 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2006-038N005 | ICS-2008-001 Prior Queued | 02 NEBRASKA | Custer County | NE | NPPD | 12/1/2010 | 12/31/2012 | 80 | 80 | 80 | ER | 0 | 0 | 0 | Wind | Broken Bow 115kV | 10/17/2006 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2006-038N004 | Jefferson County | NE | NPPD | 10/17/2006 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 10/17/2006 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2006-038N003 | Platte County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 10/17/2006 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2006-038N002 | Nuckolls County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 10/17/2006 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2006-038N001 | Butler County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 10/17/2006 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2006-038N | Cherry County | NE | NPPD | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 10/16/2006 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2006-038 | Choctaw | OK | WFEC | 1/1/2011 | 750 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 10/16/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2006-037N1 | DISIS-2009-001-6 | 02 NEBRASKA | Custer County | NE | NPPD | 1/1/2010 | 12/31/2014 | 75 | 75 | 75 | ER | 0 | 0 | 0 | Wind | Broken Bow 115kV | 10/3/2006 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2006-037N | Cherry County | NE | NPPD | 100.5 | 100.5 | 100.5 | ER | 0 | 0 | 0 | Wind | 9/15/2006 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2006-037 | Noble County | OK | OKGE | 6/1/2011 | 900 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 9/15/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2006-036 | Donley County | TX | SWPS | 7/1/2007 | 85.5 | 85.5 | 85.5 | ER | 0 | 0 | 0 | Wind | 9/13/2006 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2006-035 | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Beckham County | OK | AEPW | 12/1/2008 | 4/27/2012 | 132 | 132 | 132 | ER | 0 | 0 | 0 | Wind | Sweetwater 230kV | 8/29/2006 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2006-034 | Sherman County | KS | SUNC | 8/30/2008 | 81 | 81 | 81 | ER | 0 | 0 | 0 | Wind | Kanarado 115kV | 8/23/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2006-033 | Geary County | KS | WERE | 12/1/2008 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 8/22/2006 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2006-032 | Ellis County | KS | MIDW | 12/1/2007 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | South Hays 230kV | 8/21/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2006-031 | 03 CENTRAL | Ellis County | KS | MIDW | 6/1/2008 | 6/1/2008 | 75.6 | 75.6 | 75.6 | ER | 0 | 0 | 0 | Thermal | Gas | Knoll 115kV | 8/16/2006 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2006-030 | Terry County | TX | SWPS | 5/1/2008 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 8/15/2006 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2006-029 | Sedgewick | KS | WERE | 5/1/2008 | 300 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 8/11/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2006-028 | Lyon | KS | WERE | 5/1/2009 | 6/1/2009 | 360 | 300 | 360 | ER | 0 | 0 | 0 | Thermal | Gas | Emporia 345kV | 8/11/2006 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||
| GEN-2006-027 | Lyon | KS | WERE | 5/1/2008 | 6/1/2008 | 380 | 310 | 380 | ER | 0 | 0 | 0 | Thermal | Gas | Emporia 345kV | 8/11/2006 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||
| GEN-2006-026 | ICS-2008-001 Prior Queued | 05 SOUTHWEST | Lea | NM | SWPS | 6/1/2008 | 6/1/2008 | 604 | 604 | 604 | ER | 0 | 0 | 0 | Thermal | Gas | Hobbs 230kV & Hobbs 115kV | 7/26/2006 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2006-025 | Motley | TX | SWPS | 10/1/2007 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 7/7/2006 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2006-024S | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Harper | OK | WFEC | 12/31/2007 | 12/31/2008 | 18.9 | 18.9 | 18.9 | ER | 0 | 0 | 0 | Wind | Buffalo Bear Tap 69kV | 7/7/2006 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2006-023 | Lea County | NM | SWPS | 5/1/2008 | 549 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 6/23/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2006-022 | Pratt County | KS | MKEC | 5/31/2008 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | RV Road 115kV | 6/21/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2006-021 | ICS-2008-001 Prior Queued | 03 CENTRAL | Barber County | KS | ITPGP | 5/31/2008 | 12/1/2008 | 94 | 94 | 94 | ER | 0 | 0 | 0 | Wind | Flat Ridge Tap 138kV | 6/21/2006 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2006-020S | ICS-2008-001 Prior Queued | 05 SOUTHWEST | Hansford | TX | SWPS | 9/1/2007 | 3/1/2012 | 20 | 20 | 20 | ER | 0 | 0 | 0 | Wind | DWS Frisco 115kV | 12/31/2010 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2006-020N | ICS-2008-001 Prior Queued | 02 NEBRASKA | Bloomfield | NE | NPPD | 1/1/2009 | 42 | 42 | 42 | ER | 0 | 0 | 0 | Wind | Bloomfield 115kV | 6/20/2006 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||
| GEN-2006-019 | Greene | MO | SPRM | 6/1/2010 | 1/1/2011 | 275 | 275 | 275 | ER | 0 | 0 | 0 | Thermal | Coal | 6/19/2006 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||
| GEN-2006-018 | ICS-2008-001 Prior Queued | 05 SOUTHWEST | Hale | TX | SWPS | 6/1/2007 | 3/22/2011 | 168.1 | 168.1 | 168.1 | ER | 0 | 0 | 0 | Thermal | CT | TUCO 230kV | 6/1/2010 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||
| GEN-2006-017 | Nodaway | MO | MIPU | 4/30/2008 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | Tap Maryville - Midway 161kV (GEN-2006-014 TAP) | 6/2/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2006-016 | Beaver | OK | SWPS | 12/31/2008 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 5/8/2006 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2006-015 | 05 SOUTHWEST | Denver City | TX | SWPS | 4/1/2007 | 6/1/2007 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Thermal | Gas | Mustang 230kV | 4/24/2006 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2006-014 | Atchison | MO | MIPU | 5/31/2008 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | Tap Maryville - Midway (Nodway Co) 161kV | 3/2/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2006-013 | Harrison Co. | TX | AEPW | 6/1/2011 | 575 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 2/27/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2006-012 | Harrison Co. | TX | AEPW | 6/1/2011 | 610 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 2/27/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2006-011 | Hempstead Co. | AR | AEPW | 6/1/2011 | 605 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 2/27/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2006-010 | 04 SOUTHEAST | Hempstead Co. | AR | AEPW | 6/1/2011 | 12/20/2012 | 620 | 610 | 620 | ER | 0 | 0 | 0 | Thermal | Coal | Turk 138kV | 2/27/2006 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2006-009 | Caddo Prsh. | LA | AEPW | 6/1/2008 | 550 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 2/27/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2006-008 | Caddo Prsh. | LA | AEPW | 6/1/2008 | 6/26/2010 | 550 | 490 | 550 | ER | 0 | 0 | 0 | Thermal | Gas | Arsenal Hill 138kV | 2/27/2006 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||
| GEN-2006-007 | Washington Co. | AR | AEPW | 6/1/2007 | 530 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 2/27/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2006-006 | Ford Co. | KS | SUNC | 12/1/2008 | 205.5 | 205.5 | 205.5 | ER | 0 | 0 | 0 | Wind | Spearville 345kV | 2/16/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2006-005 | Rogers Co. | OK | AEPW | 6/1/2011 | 580 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 2/14/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2006-004 | Rogers Co. | OK | AEPW | 6/1/2011 | 620 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 2/14/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2006-003 | Atchison | MO | MIPU | 12/31/2007 | 50 | 50 | 50 | ER | 0 | 0 | 0 | Wind | 2/7/2006 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2006-002 | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Beckham | OK | AEPW | 12/31/2006 | 12/28/2010 | 100.8 | 100.8 | 100.8 | ER | 0 | 0 | 0 | Wind | Sweetwater 230kV | 1/9/2006 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2006-001 | Ellis County | OK | WFEC | 12/31/2006 | 45 | 45 | 45 | ER | 0 | 0 | 0 | Wind | 1/9/2006 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2005-024 | Tulsa County | OK | AEPW | 6/1/2007 | 11/30/2007 | 181 | 172 | 181 | ER | 0 | 0 | 0 | Thermal | Gas | 12/13/2005 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||
| GEN-2005-023 | Tulsa County | OK | AEPW | 6/1/2007 | 172 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 12/13/2005 | WITHDRAWN | N/A | |||||||||||||
| GEN-2005-022 | Caddo County | OK | AEPW | 6/1/2007 | 12/27/2007 | 177 | 168 | 177 | ER | 0 | 0 | 0 | Thermal | Gas | 12/13/2005 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||
| GEN-2005-021 | Gray County | TX | SWPS | 7/1/2007 | 85.5 | 85.5 | 85.5 | ER | 0 | 0 | 0 | Wind | 10/24/2005 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2005-020 | Ellis County | KS | MIDW | 10/1/2006 | 50 | 50 | 50 | ER | 0 | 0 | 0 | Wind | 10/3/2005 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2005-019 | Noble County | OK | OKGE | 3/31/2007 | 32 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 9/29/2005 | WITHDRAWN | N/A | |||||||||||||
| GEN-2005-018 | Muskogee Co. | OK | OKGE | 3/31/2007 | 32 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 9/29/2005 | WITHDRAWN | N/A | |||||||||||||
| GEN-2005-017 | Sherman county | TX | SWPS | 12/30/2007 | 340 | 340 | 340 | ER | 0 | 0 | 0 | Wind | 9/26/2005 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2005-016 | Elk County | KS | WERE | 12/31/2006 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 9/14/2005 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2005-015 | Motley County | TX | SWPS | 12/31/2006 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 9/14/2005 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2005-014 | Anderson County | KS | KCPL | 11/1/2007 | 201 | 201 | 201 | ER | 0 | 0 | 0 | Wind | 8/22/2005 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2005-013 | ICS-2008-001 Prior Queued | 03 CENTRAL | Elk County | KS | WERE | 11/1/2007 | 7/5/2011 | 199.8 | 199.8 | 199.8 | ER | 0 | 0 | 0 | Wind | Caney River 345kV | 8/22/2005 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2005-012 | ICS-2008-001 Prior Queued | 03 CENTRAL | Ford County | KS | SUNC | 12/31/2015 | 9/1/2012 | 248.4 | 248.4 | 248.4 | ER | 0 | 0 | 0 | Wind | Clark County-Spearville Ckt 1 (Ironwood) 345kV | 8/8/2005 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2005-011 | Chaves County | NM | SWPS | 12/31/2006 | 160 | 160 | 160 | ER | 0 | 0 | 0 | Wind | 8/2/2005 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2005-010 | Bailey County | TX | SWPS | 12/31/2006 | 160 | 160 | 160 | ER | 0 | 0 | 0 | Wind | 7/28/2005 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2005-009N | O'Neill | NE | NPPD | 50 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 5/12/2005 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2005-009A | Cloud County | KS | WEPL | 12/1/2007 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | 5/31/2005 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2005-009 | Dewey County | OK | OKGE | 10/31/2006 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 4/25/2005 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2005-008 | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Harper County | OK | OKGE | 7/31/2007 | 6/30/2007 | 120 | 120 | 120 | ER | 0 | 0 | 0 | Wind | Woodward 138kV | 4/1/2005 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2005-007 | Hutchinson County | TX | SWPS | 6/1/2009 | 260 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 3/23/2005 | WITHDRAWN | N/A | |||||||||||||
| GEN-2005-006 | Ellis County | OK | OKGE | 12/31/2006 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 3/22/2005 | 3/22/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2005-005 | Woodward County | OK | OKGE | 5/1/2006 | 18 | 18 | 18 | ER | 0 | 0 | 0 | Wind | FPL Moreland Tap 138kV | 3/22/2005 | WITHDRAWN | N/A | |||||||||||||
| GEN-2005-004 | Roosevelt Co. | NM | SWPS | 2/15/2009 | 250 | 250 | 250 | ER | 0 | 0 | 0 | Wind | 2/16/2005 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2005-003 | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Caddo & Kiowa Counties | OK | WFEC | 12/1/2005 | 12/15/2005 | 30.6 | 30.6 | 30.6 | ER | 0 | 0 | 0 | Wind | Washita 138kV | 1/21/2005 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2005-002 | Hutchison County | TX | SWPS | 9/1/2006 | 80 | 80 | 80 | ER | 0 | 0 | 0 | Wind | 1/18/2005 | 6/26/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2005-001 | Anderson County | KS | KCPL | 11/1/2006 | 201 | 201 | 201 | ER | 0 | 0 | 0 | Wind | 1/13/2005 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2004-024 | Elk County (Grenola) | KS | WERE | 11/1/2006 | 201 | 201 | 201 | ER | 0 | 0 | 0 | Wind | 12/13/2004 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2004-023N | ICS-2008-001 Prior Queued | 02 NEBRASKA | Columbus | NE | NPPD | 1/1/2009 | 75 | 75 | 75 | ER | 0 | 0 | 0 | Thermal | Coal | Columbus Co 115kV | 11/29/2004 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2004-023 | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Apache | OK | WFEC | 12/1/2005 | 12/15/2005 | 20.6 | 20.6 | 20.6 | ER | 0 | 0 | 0 | Wind | Washita 138kV | 10/26/2004 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2004-022N | Hastings | NE | NPPD | 1/1/2005 | 11 | 11 | 11 | ER | 0 | 0 | 0 | Thermal | 10/20/2004 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||||
| GEN-2004-022 | Custer County | OK | AEPW | 12/1/2005 | 60 | 60 | 60 | ER | 0 | 0 | 0 | Wind | 10/8/2004 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2004-021 | Custer County | OK | WFEC | 12/1/2005 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 10/8/2004 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2004-020 | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Custer County | OK | AEPW | 12/31/2005 | 1/1/2006 | 27 | 27 | 27 | ER | 0 | 0 | 0 | Wind | Clinton Junction-Weatherford Southeast 138kV | 10/8/2004 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2004-019N | Colfax County | NE | NPPD | 1/1/2005 | 0.1 | 0.1 | 0.1 | ER | 0 | 0 | 0 | Thermal | Gas | 10/4/2004 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||||
| GEN-2004-019 | Harper Co. | OK | WFEC | 6/30/2007 | 40.5 | 40.5 | 40.5 | ER | 0 | 0 | 0 | Wind | 9/22/2004 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2004-018N1 | Brownsville | NE | NPPD | 1/1/2005 | 22 | 22 | 22 | ER | 0 | 0 | 0 | Nuclear | 9/20/2004 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||||
| GEN-2004-018N | Hastings | NE | NPPD | 1/1/2011 | 220 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 9/17/2004 | WITHDRAWN | N/A | |||||||||||||
| GEN-2004-018 | Choctaw County | OK | WFEC | 5/1/2010 | 900 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 9/15/2004 | WITHDRAWN | N/A | |||||||||||||
| GEN-2004-017N | Columbus | NE | NPPD | 1/1/2007 | 5 | 5 | 5 | ER | 0 | 0 | 0 | Hydro | 9/13/2004 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||||
| GEN-2004-017 | 03 CENTRAL | Riverton SE Cherokee Cnty | KS | EDE | 1/1/2007 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Thermal | CT/ST | Riverton 161kV | 8/23/2004 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||
| GEN-2004-016 | Salina NE McPherson Cnty | KS | WERE | 12/31/2005 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 7/15/2004 | 1/14/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2004-015 | 05 SOUTHWEST | Denver City/Yoakum | TX | SWPS | 4/1/2006 | 4/1/2006 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Thermal | CT | 7/12/2004 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||
| GEN-2004-014 | ICS-2008-001 Prior Queued | 03 CENTRAL | Edwards | KS | MKEC | 11/15/2005 | 12/31/2012 | 152 | 152 | 152 | ER | 0 | 0 | 0 | Wind | Spearville 230kV | 4/22/2004 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2004-013 | Atchison | KS | KCPL | 6/1/2010 | 900 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 4/20/2004 | WITHDRAWN | N/A | |||||||||||||
| GEN-2004-012 | Iatan | KS | KCPL | 6/1/2009 | 900 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 4/20/2004 | WITHDRAWN | N/A | |||||||||||||
| GEN-2004-011 | Anderson County | KS | KCPL | 11/1/2006 | 201 | 201 | 201 | ER | 0 | 0 | 0 | Wind | 4/16/2004 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2004-010 | Latham NE Cowley Cnty | KS | WERE | 11/1/2006 | 300 | 300 | 300 | ER | 0 | 0 | 0 | Wind | 4/7/2004 | 10/4/2005 | WITHDRAWN | N/A | |||||||||||||
| GEN-2004-009 | Carson County | TX | SWPS | 5/1/2006 | 80 | 80 | 80 | ER | 0 | 0 | 0 | Wind | 3/30/2004 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2004-008 | 03 CENTRAL | Platte County | MO | KCPL | 6/1/2009 | 6/5/2012 | 850 | 850 | 850 | ER | 0 | 0 | 0 | Thermal | Coal | 3/26/2004 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||
| GEN-2004-007 | Salina | KS | WERE | 12/31/2005 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 3/25/2004 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2004-006 | Junction City | KS | WERE | 12/31/2005 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 3/25/2004 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2004-005N | Rosebud | SD | NPPD | 30 | 30 | 30 | ER | 0 | 0 | 0 | Wind | St Francis 115kV | 3/9/2004 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2004-005 | Springfield | MO | SPRM | 3/1/2009 | 275 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 2/9/2004 | WITHDRAWN | N/A | |||||||||||||
| GEN-2004-004 | Cuyler | TX | SWPS | 4/1/2005 | 240 | 240 | 240 | ER | 0 | 0 | 0 | Wind | 2/4/2004 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2004-003 | White Deer/ Carson County | TX | SWPS | 3/1/2005 | 240 | 240 | 240 | ER | 0 | 0 | 0 | Wind | 2/4/2004 | 1/31/2006 | WITHDRAWN | N/A | |||||||||||||
| GEN-2004-002O | Washington County | NE | OPPD | 1/1/2007 | 48 | 48 | 48 | ER | 0 | 0 | 0 | Nuclear | 1/21/2004 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||||
| GEN-2004-002 | Elk County (Grenola) | KS | WERE | 11/1/2005 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | 1/16/2004 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2004-001 | Grapevine | TX | SWPS | 12/31/2005 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | 1/6/2004 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2003-024 | Council Grove | KS | WERE | 12/31/2005 | 201 | 201 | 201 | ER | 0 | 0 | 0 | Wind | 12/31/2003 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2003-023 | Butler/Chase | KS | WERE | 12/31/2004 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 12/31/2003 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2003-022 | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Custer/Wasita | OK | AEPW | 12/31/2004 | 1/1/2006 | 120 | 120 | 120 | ER | 0 | 0 | 0 | Wind | Clinton Junction-Weatherford Southeast 138kV | 12/31/2003 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2003-021N | ICS-2008-001 Prior Queued | 02 NEBRASKA | Ainsworth | NE | NPPD | 10/1/2005 | 75 | 75 | 75 | ER | 0 | 0 | 0 | Wind | Ainsworth Wind Tap 115kV | 12/29/2003 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||
| GEN-2003-021 | Carson County | TX | SWPS | 12/31/2004 | 400 | 400 | 400 | ER | 0 | 0 | 0 | Wind | 12/29/2003 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2003-020 | ICS-2008-001 Prior Queued | 05 SOUTHWEST | Carson County | TX | SWPS | 6/1/2007 | 8/1/2012 | 159.1 | 159.1 | 159.1 | ER | 0 | 0 | 0 | Wind | Martin 115kV | 12/29/2003 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2003-019 | ICS-2008-001 Prior Queued | 03 CENTRAL | Salina NC Ellsworth Cnty | KS | MIDW | 11/1/2006 | 11/1/2006 | 249.3 | 249.3 | 249.3 | ER | 0 | 0 | 0 | Wind | Smoky Hills Tap 230kV | 11/24/2003 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2003-018 | Roswell/ Chaves Co. | NM | SWPS | 10/1/2005 | 298.5 | 298.5 | 298.5 | ER | 0 | 0 | 0 | Wind | 10/22/2003 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2003-017N | Brownsville | NE | NPPD | 1/1/2007 | 50 | 50 | 50 | ER | 0 | 0 | 0 | Nuclear | 10/15/2003 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||||
| GEN-2003-017 | Dallam County (Dalhart) | TX | SWPS | 12/15/2005 | 80 | 80 | 80 | ER | 0 | 0 | 0 | Wind | 10/15/2003 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2003-016 | Hutchinson County | TX | SWPS | 12/1/2005 | 100.5 | 100.5 | 100.5 | ER | 0 | 0 | 0 | Wind | 10/13/2003 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2003-015 | White Deer/ Carson County | TX | SWPS | 12/1/2004 | 240 | 240 | 240 | ER | 0 | 0 | 0 | Wind | 8/6/2003 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2003-014 | Lawrence County | MO | EDE | 6/1/2009 | 550 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 7/29/2003 | WITHDRAWN | N/A | |||||||||||||
| GEN-2003-013 | Hugoton/Stevens County | KS | SWPS | 11/15/2007 | 198 | 198 | 198 | ER | 0 | 0 | 0 | Wind | 7/29/2003 | 10/5/2005 | WITHDRAWN | N/A | |||||||||||||
| GEN-2003-012 | Pittsburg/Jasper county | KS | EDE | 6/1/2010 | 350 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Steam | 7/24/2003 | WITHDRAWN | N/A | |||||||||||||
| GEN-2003-011 | Sarcoxie/Jasper County | MO | EDE | 6/1/2010 | 600 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Steam | 7/24/2003 | WITHDRAWN | N/A | |||||||||||||
| GEN-2003-010 | Riverton | MO | EDE | 3/1/2007 | 50 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | CT | 7/24/2003 | WITHDRAWN | N/A | |||||||||||||
| GEN-2003-009 | Carson County | TX | SWPS | 10/1/2004 | 81 | 81 | 81 | ER | 0 | 0 | 0 | Wind | 7/16/2003 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2003-008O | Otoe County | NE | OPPD | 5/1/2009 | 700 | 700 | 700 | ER | 0 | 0 | 0 | Thermal | Coal | 7/15/2003 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||||
| GEN-2003-008 | Carson County | TX | SWPS | 12/31/2004 | 240 | 240 | 240 | ER | 0 | 0 | 0 | Wind | 7/15/2003 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2003-007 | LaRussel Energy Ctr. | MO | EDE | 6/1/2009 | 550 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 7/14/2003 | WITHDRAWN | N/A | |||||||||||||
| GEN-2003-006A | ICS-2008-001 Prior Queued | 03 CENTRAL | Cloud County | KS | MKEC | 201 | 201 | 201 | ER | 0 | 0 | 0 | Wind | Elm Creek 230kV | 7/9/2003 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||
| GEN-2003-006 | Apache | OK | WFEC | 12/1/2006 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 6/5/2003 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2003-005 | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Apache | OK | WFEC | 12/1/2006 | 99 | 99 | 99 | ER | 0 | 0 | 0 | Wind | Anadarko - Paradise (Blue Canyon) 138kV | 6/5/2003 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||
| GEN-2003-004 | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Apache | OK | WFEC | 12/1/2005 | 12/15/2005 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | Washita 138kV | 6/5/2003 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2003-003 | Tucumcari | NM | SWPS | 6/1/2004 | 80 | 80 | 80 | ER | 0 | 0 | 0 | Wind | 5/23/2003 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2003-002 | Teterville | KS | WERE | 7/31/2004 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | 3/11/2003 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2003-001 | Leedy | OK | WFEC | 6/1/2004 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 3/5/2003 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2002-026N | Ainsworth | NE | NPPD | 1/14/2003 | 50 | 50 | 50 | ER | 0 | 0 | 0 | Wind | 1/14/2003 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2002-026 | Webaunsee County | KS | WERE | 12/5/2005 | 121 | 121 | 121 | ER | 0 | 0 | 0 | Wind | 11/13/2002 | 9/17/2004 | WITHDRAWN | N/A | |||||||||||||
| GEN-2002-025A | ICS-2008-001 Prior Queued | 03 CENTRAL | Spearville | KS | MKEC | 6/1/2006 | 100.5 | 100.5 | 100.5 | ER | 0 | 0 | 0 | Wind | Spearville 230kV | 10/31/2002 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||
| GEN-2002-025 | Hammon | OK | WFEC | 40 | 40 | 40 | ER | 0 | 0 | 0 | Wind | 10/28/2002 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2002-024 | Woodward County | OK | WFEC | 5/1/2003 | 50 | 50 | 50 | ER | 0 | 0 | 0 | Wind | 10/25/2002 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2002-023N | Harmony | NE | NPPD | 0.8 | 0.8 | 0.8 | ER | 0 | 0 | 0 | Wind | Harmony 115kV | 9/28/2002 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||||
| GEN-2002-023 | Carson County | TX | SWPS | 11/1/2003 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 9/24/2002 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2002-022 | ICS-2008-001 Prior Queued | 05 SOUTHWEST | Oldham County (Wildorado) | TX | SWPS | 12/15/2006 | 239.2 | 239.2 | 239.2 | ER | 0 | 0 | 0 | Wind | Bushland 230kV | 9/12/2002 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||
| GEN-2002-021 | Gray County (Red River) | TX | SWPS | 11/30/2005 | 160 | 160 | 160 | ER | 0 | 0 | 0 | Wind | 9/12/2002 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2002-020 | Gray County (Salt Fork) | TX | SWPS | 11/30/2005 | 75 | 75 | 75 | ER | 0 | 0 | 0 | Wind | 9/12/2002 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2002-019 | Carson County (Panhandle) | TX | SWPS | 11/30/2003 | 160 | 160 | 160 | ER | 0 | 0 | 0 | Wind | 9/12/2002 | 6/23/2005 | WITHDRAWN | N/A | |||||||||||||
| GEN-2002-018 | Hugoton | KS | SWPS | 3/31/2004 | 100.8 | 100.8 | 100.8 | ER | 0 | 0 | 0 | Wind | 8/23/2002 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2002-017 | Leedy | OK | WFEC | 99 | 99 | 99 | ER | 0 | 0 | 0 | Wind | 8/14/2002 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2002-016 | Lawton | OK | AEPW | 1/1/2005 | 354 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | CT | 8/12/2002 | WITHDRAWN | N/A | |||||||||||||
| GEN-2002-015 | Weatherford | OK | AEPW | 130 | 130 | 130 | ER | 0 | 0 | 0 | Wind | 9/23/2002 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2002-014 | Cement | OK | AEPW | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | 9/23/2002 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2002-013 | Teeterville | KS | WERE | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | 9/23/2002 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2002-012 | Beaumont | KS | WERE | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 9/23/2002 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2002-011 | Woodward County | OK | OKGE | 11/30/2003 | 160 | 160 | 160 | ER | 0 | 0 | 0 | Wind | 7/30/2002 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2002-010 | Woodward County | OK | WFEC | 11/30/2003 | 240 | 240 | 240 | ER | 0 | 0 | 0 | Wind | 7/30/2002 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2002-009 | ICS-2008-001 Prior Queued | 05 SOUTHWEST | Hansford County | TX | SWPS | 9/30/2006 | 79.8 | 79.8 | 79.8 | ER | 0 | 0 | 0 | Wind | Hansford 115kV | 7/19/2002 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||
| GEN-2002-008 | ICS-2008-001 Prior Queued | 05 SOUTHWEST | Hansford County | TX | SWPS | 11/1/2007 | 12/30/2008 | 240 | 240 | 240 | ER | 0 | 0 | 0 | Wind | Hitchland 345kV | 7/19/2002 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2002-007 | Dumas | TX | SWPS | 1100 | 1100 | 1100 | ER | 0 | 0 | 0 | Wind | 5/14/2002 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2002-006 | Texas County | OK | SWPS | 12/1/2005 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Wind | 4/30/2002 | 8/19/2004 | WITHDRAWN | N/A | |||||||||||||
| GEN-2002-005 | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Hammon | OK | WFEC | 12/31/2006 | 12/31/2008 | 123 | 123 | 123 | ER | 0 | 0 | 0 | Wind | Red Hills Tap 138kV | 4/28/2002 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2002-004N | Grand Island | NE | NPPD | 12/1/2003 | 80 | 80 | 80 | ER | 0 | 0 | 0 | Thermal | Gas | 4/16/2002 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||||
| GEN-2002-004 | ICS-2008-001 Prior Queued | 03 CENTRAL | Beaumont SE Butler Cnty | KS | WERE | 9/30/2003 | 12/15/2005 | 153 | 153 | 153 | ER | 0 | 0 | 0 | Wind | Latham 345kV | 4/12/2002 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2002-003 | Butler County | KS | WERE | 120 | 120 | 120 | ER | 0 | 0 | 0 | Wind | 2/19/2002 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2002-002 | Lovington Central Lea Cnty | NM | SWPS | 7/1/2002 | 50 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | CT | 1/22/2002 | WITHDRAWN | N/A | |||||||||||||
| GEN-2002-001 | Winnsboro | TX | AEPW | 50 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 1/14/2002 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2001-040N | 8 Sites | NE | NPPD | 400 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 1/4/2002 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2001-040 | 03 CENTRAL | LaRussell Energy Ctr. | MO | EDE | 6/1/2003 | 4/24/2003 | 50 | 50 | 50 | ER | 0 | 0 | 0 | Thermal | CT | LaRussell Energy Center 161kV | 11/27/2001 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2001-039N1 | Springview | NE | NPPD | 5 | 5 | 5 | ER | 0 | 0 | 0 | Wind | 11/7/2001 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2001-039N | Grand Island | NE | NPPD | 400 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 11/3/2001 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2001-039M | ICS-2008-001 Prior Queued | 03 CENTRAL | Wichita County | KS | SUNC | 12/1/2008 | 100 | 100 | 100 | ER | 0 | 0 | 0 | Wind | Central Plains Tap 115kV | 11/1/2001 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||
| GEN-2001-039A | ICS-2008-001 Prior Queued | 03 CENTRAL | Kiowa County | KS | MKEC | 104 | 104 | 104 | ER | 0 | 0 | 0 | Wind | Shooting Star Tap 115kV | 10/30/2001 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||
| GEN-2001-038 | Shreveport | LA | AEPW | 900 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 10/26/2001 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2001-037 | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Woodward | OK | OKGE | 10/1/2002 | 11/12/2003 | 102 | 102 | 102 | ER | 0 | 0 | 0 | Wind | FPL Moreland Tap 138kV | 10/18/2001 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2001-036 | ICS-2008-001 Prior Queued | 05 SOUTHWEST | Tucumcari | NM | SWPS | 10/1/2002 | 12/31/2004 | 80 | 80 | 80 | ER | 0 | 0 | 0 | Wind | Norton 115kV Switching Station | 10/15/2001 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2001-035 | Apache | OK | AEPW | 10/1/2002 | 149 | 149 | 149 | ER | 0 | 0 | 0 | Wind | 10/8/2001 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2001-034 | Nacogdoches | TX | AEPW | 100 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 9/21/2001 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2001-033 | ICS-2008-001 Prior Queued | 05 SOUTHWEST | Chaves County (Melrose) | NM | SWPS | 10/1/2002 | 12/22/2005 | 180 | 180 | 180 | ER | 0 | 0 | 0 | Wind | San Juan Tap 230kV | 9/17/2001 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2001-032 | Cooper County | MO | 528 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 9/4/2001 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2001-031 | Cooper County | MO | 596 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 9/4/2001 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2001-030 | 03 CENTRAL | LaRussell Energy Center | MO | EDE | 6/1/2003 | 4/25/2003 | 50 | 50 | 50 | ER | 0 | 0 | 0 | Thermal | CT | LaRussell Energy Center 161kV | 9/4/2001 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2001-029N1 | Hastings | NE | NPPD | 250 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 9/3/2001 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2001-029N | Beatrice | NE | NPPD | 1/1/2005 | 1/1/2005 | 250 | 250 | 250 | ER | 0 | 0 | 0 | Thermal | Gas | 8/15/2001 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||
| GEN-2001-029 | Cooper County | MO | 540 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 8/8/2001 | WITHDRAWN | N/A | |||||||||||||||
| GEN-2001-028 | Paola | KS | KCPL | 6/1/2004 | 520 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | CT | 8/7/2001 | 3/10/2004 | WITHDRAWN | N/A | ||||||||||||
| GEN-2001-027 | Paola | KS | KCPL | 520 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 8/7/2001 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2001-026 | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Meers | OK | WFEC | 10/1/2003 | 10/1/2003 | 74.25 | 74.25 | 74.25 | ER | 0 | 0 | 0 | Wind | Washita 138kV | 7/24/2001 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2001-025 | Grady County | OK | AEPW | 5/1/2004 | 580 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | CT | 7/9/2001 | 5/3/2004 | WITHDRAWN | N/A | ||||||||||||
| GEN-2001-024 | Washington County | AR | AEPW | 5/1/2007 | 7/1/2007 | 630 | 580 | 630 | ER | 0 | 0 | 0 | Thermal | CT | SWEPCO Tontitown 161kV Substation | 7/9/2001 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||
| GEN-2001-023 | Horseshoe | OK | OKGE | 180 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 6/18/2001 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2001-022 | Pittsburgh | OK | AEPW | 550 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 6/15/2001 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2001-021 | Eddy County | NM | SWPS | 200 | 0 | 0 | 0 | 0 | 0 | VFT | 6/4/2001 | WITHDRAWN | N/A | ||||||||||||||||
| GEN-2001-020 | Blackwater | NM | SWPS | 200 | 0 | 0 | 0 | 0 | 0 | VFT | 6/4/2001 | WITHDRAWN | N/A | ||||||||||||||||
| GEN-2001-019 | Longwood(Caddo Parish) | LA | AEPW | 4/1/2004 | 750 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | CT | 5/29/2001 | 5/3/2004 | WITHDRAWN | N/A | ||||||||||||
| GEN-2001-018 | Neosho County | KS | WERE | 1/1/2002 | 1/1/2002 | 47 | 47 | 47 | ER | 0 | 0 | 0 | Thermal | Gas | Chanute NW Neosho Cnty By Tioga Sub | 5/15/2001 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||
| GEN-2001-017 | Shreveport | LA | AEPW | 557 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 5/11/2001 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2001-016 | Shreveport | LA | AEPW | 1115 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 5/11/2001 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2001-015 | Mustang | OK | OKGE | 180 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 5/17/2001 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2001-014 | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Sleeping Bear | OK | WFEC | 6/30/2007 | 4/15/2007 | 94.5 | 94.5 | 94.5 | ER | 0 | 0 | 0 | Wind | Ft Supply 138kV | 4/24/2001 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| GEN-2001-013 | South Buffalo | OK | WFEC | 8/31/2002 | 26 | 26 | 26 | ER | 0 | 0 | 0 | Wind | 4/24/2001 | 3/10/2004 | WITHDRAWN | N/A | |||||||||||||
| GEN-2001-012 | Commanche | OK | AEPW | 600 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 3/16/2001 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2001-011 | Lawton | OK | AEPW | 900 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 3/16/2001 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2001-010 | Leavenworth | KS | WERE | 640 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 3/14/2001 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2001-009 | Leavenworth | KS | WERE | 6/1/2003 | 640 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 3/15/2001 | WITHDRAWN | N/A | |||||||||||||
| GEN-2001-008 | Odessa | TX | SWPS | 500 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 3/5/2001 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2001-007 | Iatan | KS | KCPL | 6/1/2005 | 900 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 2/19/2001 | WITHDRAWN | N/A | |||||||||||||
| GEN-2001-006 | Iatan | KS | KCPL | 700 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Coal | 2/19/2001 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2001-005 | Clovis | NM | SWPS | 640 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 1/28/2001 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2001-004 | Clovis | NM | SWPS | 500 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 1/24/2001 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2001-003 | Stephens County Duncan | OK | AEPW | 6/1/2003 | 620 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | CT | 2/5/2001 | 4/30/2004 | WITHDRAWN | N/A | ||||||||||||
| GEN-2001-002 | West Gardner | KS | KCPL | 640 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 1/15/2001 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2001-001 | West Gardner | KS | KCPL | 620 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 1/15/2001 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2000-015 | Lake Thunderbird | OK | WFEC | 180 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 12/20/2000 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2000-014 | Seminole | OK | OKGE | 1300 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 12/11/2000 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2000-012 | Fort Smith | AR | OKGE | 660 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 11/30/2000 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2000-011 | Webbers Falls | OK | OKGE | 825 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 11/3/2000 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2000-010 | Jacksonville | AEPW | 340 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | WITHDRAWN | N/A | ||||||||||||||||
| GEN-2000-009 | Valliant | OK | AEPW | 500 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | WITHDRAWN | N/A | |||||||||||||||
| GEN-2000-008 | Kansas City | KCPL | 560 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | WITHDRAWN | N/A | ||||||||||||||||
| GEN-2000-007 | Pittsburgh | OK | AEPW | 560 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 9/25/2000 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2000-006 | Fort Smith | AR | OKGE | 660 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | WITHDRAWN | N/A | |||||||||||||||
| GEN-2000-005 | Lake Thunderbird | OK | OKGE | 825 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | WITHDRAWN | N/A | |||||||||||||||
| GEN-2000-004 | Valliant | OK | AEPW | 800 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 8/24/2000 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2000-003 | Moore County | TX | SWPS | 280 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 5/31/2000 | WITHDRAWN | N/A | ||||||||||||||
| GEN-2000-001 | Newport | 100 | 0 | 0 | ER | 0 | 0 | 0 | Thermal | Gas | 4/5/2016 | WITHDRAWN | N/A | ||||||||||||||||
| GEN-1999-099 | Hugo | TX | WFEC | 60 | 0 | 0 | ER/NR | 0 | 0 | 0 | Thermal | Gas | 9/20/1999 | 12/6/2018 | WITHDRAWN | N/A | |||||||||||||
| FEUS-5 | RTOE Transitional Cluster | La Plata | NM | FEUS | 12/1/2028 | 12/1/2028 | 85 | 85 | 85 | NR | 0 | 0 | 0 | Thermal | Gas | Glade to El Paso 115 T-Line (south of Switch 2165) | 9/15/2025 | FACILITY STUDY STAGE | |||||||||||
| FEUS-4 | RTOE Transitional Cluster | Bloomfield | NM | FEUS | 12/1/2028 | 12/1/2028 | 60 | 60 | 60 | NR | 0 | 0 | 0 | Thermal | Gas | West Fork Substation 115 | 6/15/2025 | FACILITY STUDY STAGE | |||||||||||
| FEUS-3 | RTOE Transitional Cluster | Kirtland | NM | FEUS | 10/1/2030 | 10/1/2030 | 180 | 180 | 180 | NR | 0 | 0 | 0 | Thermal | Gas | Hogback to West Loop 115 T-Line | 6/6/2025 | FACILITY STUDY STAGE | |||||||||||
| FEUS-2 | RTOE Transitional Cluster | Kirtland | NM | FEUS | 10/1/2026 | 10/1/2026 | 60 | 60 | 60 | NR | 0 | 0 | 0 | Thermal | Gas | Hood Mesa to Fruitland Tap 115 T-Line | 2/21/2025 | IA FULLY EXECUTED/ON SCHEDULE | |||||||||||
| FEUS-1 | RTOE Transitional Cluster | Bloomfield | NM | FEUS | 6/1/2027 | 6/1/2027 | 60 | 60 | 60 | NR | 0 | 0 | 0 | Thermal | Gas | Hare Switching Station 115 | 5/27/2024 | FACILITY STUDY STAGE | |||||||||||
| ERAS-2255 | 333 | 0 | 0 | 0 | 0 | 0 | ERAS | N/A | |||||||||||||||||||||
| ERAS-2025-TEST2 | ERAS-2025 | 01 NORTH | 200 | 0 | 0 | 0 | 0 | 0 | Hydro | ERAS | N/A | ||||||||||||||||||
| ERAS-2025-TEST | 150 | 0 | 0 | 0 | 0 | 0 | ERAS | N/A | |||||||||||||||||||||
| CSUT-2025-8 | RTOE Transitional Cluster | El Paso | CO | CSU | 1/29/2028 | 1/29/2028 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Battery/Storage | Horizon Substation 230 | 3/3/2025 | DISIS STAGE | ||||||||||||
| CSUT-2025-7 | RTOE Transitional Cluster | El Paso | CO | CSU | 3/15/2028 | 3/15/2028 | 412 | 412 | 412 | ER/NR | 0 | 0 | 0 | Thermal | Gas | Horizon Substation 230 | 3/3/2025 | DISIS STAGE | |||||||||||
| CSUT-2025-6 | RTOE Transitional Cluster | El Paso | CO | CSU | 12/31/2027 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Battery/Storage | South Plant Substation 115 via 34.5 Feeders | 3/3/2025 | DISIS STAGE | |||||||||||||
| CSUT-2025-2 | RTOE Transitional Cluster | El Paso | CO | CSU | 12/1/2028 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Solar | Photovoltaic | Nixon Substation 230 | 3/3/2025 | DISIS STAGE | ||||||||||||
| CSUT-2025-1 | RTOE Transitional Cluster | Lincoln | CO | CSU | 12/31/2027 | 500 | 500 | 500 | ER/NR | 0 | 0 | 0 | wind | wind | Williams Creek Substation 230 | 3/3/2025 | DISIS STAGE | ||||||||||||
| CSU-2023-002 | RTOE Transitional Cluster | El Paso | CO | CSU | 7/1/2025 | 100 | 100 | 100 | ER/NR | 0 | 0 | 0 | Battery/Storage | Fuller Substation 230 | 4/21/2023 | IA FULLY EXECUTED/COMMERCIAL OPERATION | |||||||||||||
| CSU-2020-3 | RTOE Transitional Cluster | El Paso | CO | CSU | 9/1/2025 | 200 | 200 | 200 | ER/NR | 0 | 0 | 0 | Hybrid | Solar/Storage | Williams Creek Substation 230 | 6/20/2020 | FACILITY STUDY STAGE | ||||||||||||
| CSU-2020-002 | RTOE Transitional Cluster | El Paso | CO | CSU | 6/7/2023 | 178 | 178 | 178 | ER/NR | 0 | 0 | 0 | Thermal | Gas | South Plant Substation 115 | 7/8/2020 | IA FULLY EXECUTED/COMMERCIAL OPERATION | ||||||||||||
| CSU-2020-001 | RTOE Transitional Cluster | El Paso | CO | CSU | 10/31/2023 | 175 | 175 | 175 | ER/NR | 0 | 0 | 0 | Solar | Photovoltaic | Williams Creek Substation 230 | 7/6/2020 | IA FULLY EXECUTED/COMMERCIAL OPERATION | ||||||||||||
| CSU-2018-001 | RTOE Transitional Cluster | El Paso | CO | CSU | 12/31/2019 | 60 | 60 | 60 | ER/NR | 0 | 0 | 0 | Solar | Photovoltaic | Williams Creek Substation 230 | 4/4/2018 | IA FULLY EXECUTED/COMMERCIAL OPERATION | ||||||||||||
| ASGI-2020-003 | DISIS-2020-001 | 45 | 45 | 45 | ER | 0 | 0 | 0 | Solar | 4/30/2020 | DISIS STAGE | N/A | |||||||||||||||||
| ASGI-2020-002 | DISIS-2020-001 | 45 | 45 | 45 | ER | 0 | 0 | 0 | Solar | 4/30/2020 | DISIS STAGE | N/A | |||||||||||||||||
| ASGI-2020-001 | DISIS-2020-001 | 45 | 45 | 45 | ER | 0 | 0 | 0 | Solar | 4/30/2020 | DISIS STAGE | N/A | |||||||||||||||||
| ASGI-2019-003 | DISIS-2019-001 | Lubbock | TX | SWPS | 3 | 3 | 3 | ER | 0 | 0 | 0 | Wind | Distribution line feeding Hurlwood substation | 4/23/2019 | 10/22/2020 | WITHDRAWN | N/A | ||||||||||||
| ASGI-2019-002 | DISIS-2019-001 | Lubbock County | TX | 4.5 | 4.5 | 4.5 | ER | 0 | 0 | 0 | Wind | Distribution line feeding Wolfforth substation | 4/23/2019 | WITHDRAWN | N/A | ||||||||||||||
| ASGI-2019-001 | Teton | MN | WAPA | 20 | 20 | 20 | ER | 0 | 0 | 0 | Wind | new substation along existing NWE-Conteau Pondera Oil 69kV circuit | 2/1/2019 | None | N/A | ||||||||||||||
| ASGI-2018-012 | DISIS-2018-001 | Franklin | KS | GMO | 35 | 35 | 35 | ER | 0 | 0 | 0 | Solar | Tap Rock Creek-Lane 34.5kV | 7/26/2018 | 5/7/2021 | WITHDRAWN | N/A | ||||||||||||
| ASGI-2018-011 | DISIS-2018-001 | 03 CENTRAL | Franklin | KS | GMO | 35 | 35 | 35 | ER | 0 | 0 | 0 | Solar | Tap Rock Creek-Lane 34.5kV | 7/26/2018 | DISIS STAGE | N/A | ||||||||||||
| ASGI-2018-010 | DISIS-2018-001 | 03 CENTRAL | Franklin | KS | GMO | 35 | 35 | 35 | ER | 0 | 0 | 0 | Solar | Tap Wal-Mart-Rock Creek 34.5kV | 7/26/2018 | DISIS STAGE | N/A | ||||||||||||
| ASGI-2018-009 | DISIS-2018-001 | 03 CENTRAL | Miami | KS | GMO | 35 | 35 | 35 | ER | 0 | 0 | 0 | Solar | Tap Paola-Drexel Corners 34.5kV | 7/26/2018 | DISIS STAGE | N/A | ||||||||||||
| ASGI-2018-008 | DISIS-2018-001 | Linn | KS | GMO | 20 | 20 | 20 | ER | 0 | 0 | 0 | Solar | Tap Bush City-Centerville 34.5kV | 7/26/2018 | 5/7/2021 | WITHDRAWN | N/A | ||||||||||||
| ASGI-2018-007 | DISIS-2018-001 | 03 CENTRAL | Chariton County | MO | GMO | 20 | 20 | 20 | ER | 0 | 0 | 0 | Solar | Tap Salisbury - Glasgow 34.5kV | 7/26/2018 | DISIS STAGE | N/A | ||||||||||||
| ASGI-2018-006 | DISIS-2018-001 | 03 CENTRAL | Vernon County | MO | GMO | 20 | 20 | 20 | ER | 0 | 0 | 0 | Solar | Tap Metz-Dederick Junction 34.5kV | 7/26/2018 | DISIS STAGE | N/A | ||||||||||||
| ASGI-2018-003 | DISIS-2018-001 | 03 CENTRAL | Appleton City | MO | GMO | 20 | 20 | 20 | ER | 0 | 0 | 0 | Solar | Tap Appleton - Rockbille 34.5kV | 7/26/2018 | DISIS STAGE | N/A | ||||||||||||
| ASGI-2018-002 | PQ | 0 | 0 | 0 | ER | 0 | 0 | 0 | WITHDRAWN | N/A | |||||||||||||||||||
| ASGI-2018-001 | DIS-17-1-PQ | 03 CENTRAL | Nodaway | MO | AECI | 12/31/2019 | 5/4/2020 | 230 | 230 | 230 | ER | 0 | 0 | 0 | Wind | Maryville 161kV | 1/22/2018 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||
| ASGI-2017-014 | DISIS-2017-002 | 03 CENTRAL | Post Oak | MO | KCPL | 9/1/2023 | 40 | 40 | 40 | ER/NR | 0 | 0 | 0 | Solar | Post Oak 34.5kV | 6/5/2017 | DISIS STAGE | N/A | |||||||||||
| ASGI-2017-013 | DISIS-2018-001 | 01 NORTH | Beadle County | SD | EREPC | 40 | 40 | 40 | ER | 0 | 0 | 0 | Wind | Wosley Substation 69kV | 2/13/2018 | DISIS STAGE | N/A | ||||||||||||
| ASGI-2017-012 | Kiowa and PRowers County, CO | CO | SWPS | 12/1/2019 | 12/1/2019 | 200 | 200 | 200 | ER | 0 | 0 | 0 | Wind | Finney – Lamar 345 kV line | 4/28/2017 | 3/4/2002 | WITHDRAWN | N/A | |||||||||||
| ASGI-2017-011 | PQ | 0 | 0 | 0 | ER | 0 | 0 | 0 | WITHDRAWN | N/A | |||||||||||||||||||
| ASGI-2017-007 | DISIS-2017-001 | SWPS | 1/31/2019 | 1/31/2019 | 4.2 | 4.2 | 4.2 | ER | 0 | 0 | 0 | Wind | SPS Erskine Substation 115 kV | 6/2/2017 | 10/22/2020 | WITHDRAWN | N/A | ||||||||||||
| ASGI-2017-006 | 02 NEBRASKA | Nodaway | MO | AECI | 238 | 238 | 238 | ER/NR | 0 | 0 | 0 | Wind | Maryville 161kV | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | Cuase of delay | |||||||||||||
| ASGI-2017-001 | Alta | IA | WAPA | 12/31/2017 | 4 | 4 | 4 | ER | 0 | 0 | 0 | Thermal | Sac County – Buena Vista 69 kV line | 4/28/2017 | DISIS STAGE | N/A | |||||||||||||
| ASGI-2016-013 | DIS-16-2-PQ | 04 SOUTHEAST | Ashland | OK | 4.938 | 4.938 | 4.938 | ER | 0 | 0 | 0 | Thermal | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||||||
| ASGI-2016-012 | DIS-16-2-PQ | 04 SOUTHEAST | Centrahoma | OK | 61.725 | 61.725 | 61.725 | ER | 0 | 0 | 0 | Thermal | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||||||
| ASGI-2016-011 | DIS-16-2-PQ | 04 SOUTHEAST | Gerty | OK | 7.407 | 7.407 | 7.407 | ER | 0 | 0 | 0 | Thermal | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||||||
| ASGI-2016-010 | DISIS-2016-002 | 05 SOUTHWEST | Powell Corner 115kV Substation | TCEC | 12/31/2019 | 90 | 90 | 90 | ER | 0 | 0 | 0 | Wind | Powell Corner 115kV Substation | 12/6/2016 | IA FULLY EXECUTED/ON SUSPENSION | N/A | ||||||||||||
| ASGI-2016-009 | SPEC | 12/31/2019 | 3 | 3 | 3 | ER | 0 | 0 | 0 | Wind | Wolfforth 12.47 kV Substation | 9/5/2017 | 9/16/2020 | WITHDRAWN | N/A | ||||||||||||||
| ASGI-2016-004 | DISIS-2016-001 | 05 SOUTHWEST | Canyon | TX | SWPS | 10 | 10 | 10 | ER | 0 | 0 | 0 | Wind | Palo Buro 115kV substation | 1/1/2016 | IA FULLY EXECUTED/ON SCHEDULE | N/A | ||||||||||||
| ASGI-2016-003 | DISIS-2016-001 | 03 CENTRAL | Osawatomie | KS | KCPL | 12 | 12 | 12 | ER | 0 | 0 | 0 | Thermal | Paola 161kV | 8/25/2016 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||
| ASGI-2016-002 | DISIS-2016-001 | Lubbock County | TX | 0.35 | 0.35 | 0.35 | ER | 0 | 0 | 0 | Wind | 4/11/2016 | 10/22/2020 | WITHDRAWN | N/A | ||||||||||||||
| ASGI-2016-001 | DISIS-2017-001 | Lubbock County | TX | SPEC | 2.5 | 2.5 | 2.5 | ER/NR | 0 | 0 | 0 | Wind | Wolfforth 115kV substation #526524 | 4/4/2016 | 10/22/2020 | WITHDRAWN | N/A | ||||||||||||
| ASGI-2015-006 | DISIS-2015-002 | Coal County | OK | SWPA | 3/3/2016 | 9 | 9 | 9 | ER | 0 | 0 | 0 | Solar | Tupelo 138kV substation | 9/29/2015 | 4/23/2020 | TERMINATED | N/A | |||||||||||
| ASGI-2015-004 | DISIS-2015-001 | 03 CENTRAL | Nowata | OK | GRDA | 1/1/2017 | 56.4 | 54.3 | 56.37 | ER | 0 | 0 | 0 | Reciprocating Combustion Engine | Coffeyville City 69kV | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||
| ASGI-2015-003 | DISIS-2015-001 | Quay County | NM | FECNM | 30 | 30 | 30 | ER | 0 | 0 | 0 | Solar | FE-Tucumcari 115kV | WITHDRAWN | N/A | ||||||||||||||
| ASGI-2015-002 | DISIS-2015-001 | Lubbock County | TX | SPEC | 2 | 2 | 2 | ER | 0 | 0 | 0 | Wind | Yuma Delivery Point | 6/3/2015 | 1/26/2021 | WITHDRAWN | N/A | ||||||||||||
| ASGI-2015-001 | DISIS-2015-001 | 03 CENTRAL | Pratt County | KS | SUNC | 2/28/2008 | 6.13 | 4.27 | 6.13 | ER | 0 | 0 | 0 | Thermal | Ninnescah 115kV | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||
| ASGI-2014-015 | PQ | SWPS | 0 | 0 | 0 | ER | 0 | 0 | 0 | Brasher 115kV, bus 527536 | WITHDRAWN | N/A | |||||||||||||||||
| ASGI-2014-014 | DISIS-2014-002 | 04 SOUTHEAST | Payne County | OK | GRDA | 56.4 | 56.4 | 56.4 | ER | 0 | 0 | 0 | Thermal | Ferguson 69kV | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||||
| ASGI-2014-013 | DISIS-2014-002 | Lubbock County | TX | SPEC | 2 | 2 | 2 | ER | 0 | 0 | 0 | Wind | Erskine 115kV bus | WITHDRAWN | N/A | ||||||||||||||
| ASGI-2014-012 | DISIS-2014-002 | Lea County | NM | SWPS | 10 | 10 | 10 | ER | 0 | 0 | 0 | Solar | Cooper Ranch 115kV, bus 528554 | WITHDRAWN | N/A | ||||||||||||||
| ASGI-2014-011 | DISIS-2014-002 | Lea County | NM | SWPS | 10 | 10 | 10 | ER | 0 | 0 | 0 | Solar | Zia 115kV, bus 528420 | WITHDRAWN | N/A | ||||||||||||||
| ASGI-2014-010 | DISIS-2014-002 | Lea County | NM | SWPS | 10 | 10 | 10 | ER | 0 | 0 | 0 | Solar | Ochoa 115kV, bus 528232 | WITHDRAWN | N/A | ||||||||||||||
| ASGI-2014-009 | DISIS-2014-002 | Eddy County | NM | SWPS | 10 | 10 | 10 | ER | 0 | 0 | 0 | Solar | Wood Draw 115kV, bus 528228 | WITHDRAWN | N/A | ||||||||||||||
| ASGI-2014-008 | DISIS-2014-002 | Eddy County | NM | SWPS | 10 | 10 | 10 | ER | 0 | 0 | 0 | Solar | South Loving 69kV, bus 528218 | WITHDRAWN | N/A | ||||||||||||||
| ASGI-2014-007 | PQ | SWPS | 0 | 0 | 0 | ER | 0 | 0 | 0 | Fiesta 115kV, bus 528151 | WITHDRAWN | N/A | |||||||||||||||||
| ASGI-2014-006 | PQ | SWPS | 0 | 0 | 0 | ER | 0 | 0 | 0 | North Canal 115kV, bus 528137 | WITHDRAWN | N/A | |||||||||||||||||
| ASGI-2014-005 | DISIS-2014-002 | Eddy County | NM | SWPS | 0 | 0 | 0 | ER | 0 | 0 | 0 | Solar | Strata 69kV bus 528046 | WITHDRAWN | N/A | ||||||||||||||
| ASGI-2014-004 | DISIS-2014-002 | Eddy County | NM | SWPS | 10 | 10 | 10 | ER | 0 | 0 | 0 | Solar | Livingston Ridge 69kV bus 527952 | WITHDRAWN | N/A | ||||||||||||||
| ASGI-2014-002 | DISIS-2014-002 | Santa Rosa | NM | 0 | 0 | 0 | ER | 0 | 0 | 0 | Solar | WITHDRAWN | N/A | ||||||||||||||||
| ASGI-2014-001 | DISIS-2014-001 | Lubbock County | TX | 0 | 0 | 0 | ER | 0 | 0 | 0 | Wind | WITHDRAWN | N/A | ||||||||||||||||
| ASGI-2013-006 | PQ | Lubbock County | TX | 2 | 2 | 2 | ER | 0 | 0 | 0 | Wind | WITHDRAWN | N/A | ||||||||||||||||
| ASGI-2013-005 | DISIS-2013-002 | 05 SOUTHWEST | Curry County | NM | 12/31/2014 | 1.65 | 1.65 | 1.65 | ER | 0 | 0 | 0 | Wind | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||||
| ASGI-2013-004 | DISIS-2013-002 | 03 CENTRAL | Finney County | KS | SUNC | 12/31/2014 | 36.6 | 27.6 | 36.6 | ER | 0 | 0 | 0 | Thermal | Garden City 115kV substation, bus 531445 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||
| ASGI-2013-003 | DISIS-2013-001 | 05 SOUTHWEST | Quay County | NM | 12/31/2014 | 18.4 | 18.4 | 18.4 | ER | 0 | 0 | 0 | Wind | N/A | |||||||||||||||
| ASGI-2013-002 | DISIS-2013-001 | 05 SOUTHWEST | Quay County | NM | 12/31/2014 | 18.4 | 18.4 | 18.4 | ER | 0 | 0 | 0 | Wind | N/A | |||||||||||||||
| ASGI-2013-001 | DISIS-2013-001 | 05 SOUTHWEST | Carson County | TX | 11.5 | 11.5 | 11.5 | ER | 0 | 0 | 0 | Wind | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||||||
| ASGI-2012-008 | PQ | 03 CENTRAL | Arcadia | KS | 12/31/2013 | 3.55 | 3.55 | 3.55 | ER | 0 | 0 | 0 | Thermal | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||||
| ASGI-2012-007 | DISIS-2013-001 | 0 | 0 | 0 | ER | 0 | 0 | 0 | Wind | WITHDRAWN | N/A | ||||||||||||||||||
| ASGI-2012-006 | DISIS-2012-001 | 03 CENTRAL | Hugoton | KS | 22.5 | 22.5 | 22.5 | ER | 0 | 0 | 0 | Thermal | None | N/A | |||||||||||||||
| ASGI-2012-002 | DISIS-2012-002 | 05 SOUTHWEST | Grady | NM | FECNM | 12/31/2014 | 18.15 | 18.15 | 18.15 | ER | 0 | 0 | 0 | Wind | FEC 69kV line | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||
| ASGI-2011-004 | DISIS-2011-002 | 05 SOUTHWEST | Crosby County | TX | 9/29/2015 | 19.8 | 19.8 | 19.8 | ER | 0 | 0 | 0 | Wind | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||||
| ASGI-2011-003 | DISIS-2011-001 | 05 SOUTHWEST | Crosby | TX | 6/29/2011 | 10 | 10 | 10 | ER | 0 | 0 | 0 | Wind | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||||
| ASGI-2011-002 | DISIS-2011-001 | 05 SOUTHWEST | Hutchinson | TX | 12/31/2010 | 20 | 20 | 20 | ER | 0 | 0 | 0 | Wind | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||||
| ASGI-2011-001 | DISIS-2010-002 | 02 NEBRASKA | Lovington | NM | 27.3 | 27.3 | 27.3 | ER | 0 | 0 | 0 | Wind | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | |||||||||||||||
| ASGI-2010-021 | DISIS-2010-002 | 05 SOUTHWEST | Lovington | NM | 12/30/2015 | 15 | 15 | 15 | ER | 0 | 0 | 0 | Wind | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||||
| ASGI-2010-020 | DISIS-2010-002 | 05 SOUTHWEST | Lovington | NM | 6/1/2017 | 30 | 30 | 30 | ER | 0 | 0 | 0 | Wind | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||||
| ASGI-2010-010 | DISIS-2010-001 | 05 SOUTHWEST | Lovington | NM | SPS | 1/4/2012 | 42.195 | 42.195 | 42.195 | ER | 0 | 0 | 0 | Thermal | 1/1/2010 | IA FULLY EXECUTED/COMMERCIAL OPERATION | N/A | ||||||||||||
| 24-03011 | RTOE Transitional Cluster | Loveland | AN | PRPA | 1/1/2027 | 1/1/2027 | 130 | 130 | 130 | ER | 0 | 0 | 0 | Battery/Storage | Crossroads 115 | 3/1/2024 | DISIS STAGE | ||||||||||||
| 23-05032 | RTOE Transitional Cluster | Fort Collins | CO | PRPA | 1/1/2026 | 1/1/2026 | 50 | 50 | 50 | ER | 0 | 0 | 0 | Battery/Storage | Ault-Carey 230 | 5/3/2023 | DISIS STAGE | ||||||||||||
| 22-07251 | RTOE Transitional Cluster | Wellington | TO | PRPA | 3/1/2028 | 3/1/2028 | 250 | 250 | 250 | ER | 0 | 0 | 0 | Thermal | Gas | Rawhide 230 | 7/25/2022 | DISIS STAGE | |||||||||||
| 21-11157 | RTOE Transitional Cluster | Fort Collins | CO | PRPA | 12/1/2026 | 12/1/2026 | 125 | 125 | 125 | ER | 0 | 0 | 0 | Battery/Storage | Ault-Carey 230 | 11/15/2021 | DISIS STAGE | ||||||||||||
| 21-11121 | RTOE Transitional Cluster | Mead | EA | PRPA | 12/31/2025 | 12/31/2025 | 150 | 150 | 150 | ER | 0 | 0 | 0 | Hybrid | Solar/Storage | Longs Peak 230 | 11/12/2021 | FACILITY STUDY STAGE | |||||||||||
| 21-08242 | RTOE Transitional Cluster | Cheyenne | NN | PRPA | 12/31/2025 | 12/31/2025 | 350 | 350 | 350 | ER | 0 | 0 | 0 | Wind | Wind | Rawhide-Roundhouse 230 | 8/24/2021 | IA PENDING | |||||||||||
| 2025-G1 | RTOE Transitional Cluster | Weld County, | CO | LAPT | 1/1/2028 | 250 | 250 | 250 | ER/NR | 0 | 0 | 0 | Hybrid | Solar/Storage | Ault 345 station | 1/14/2025 | DISIS STAGE | ||||||||||||
| 2023-G5.2 | RTOE Transitional Cluster | Coconino County | AZ | CRCM | 12/1/2028 | 500 | 500 | 500 | ER/NR | 0 | 0 | 0 | Hybrid | Solar/Storage | Flagstaff - Glen Canyon 345 | 6/21/2023 | DISIS STAGE | ||||||||||||
| 2023-G3 | RTOE Transitional Cluster | Albany County | WY | LAPT | 12/1/2026 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Solar | Photovoltaic | Northpark - Terry Ranch 230- | 11/18/2022 | FACILITY STUDY STAGE | ||||||||||||
| 2023-G2 | RTOE Transitional Cluster | Albany County | WY | LAPT | 12/1/2026 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Hybrid | Solar/Storage | Northpark - Terry Ranch 230- | 11/18/2022 | FACILITY STUDY STAGE | ||||||||||||
| 2023-G1 | RTOE Transitional Cluster | Scotts Bluff County | NE | LAPT | 12/1/2025 | 400 | 400 | 400 | ER/NR | 0 | 0 | 0 | Hybrid | Solar/Storage | Archer - Stegall 230- | 10/7/2022 | FACILITY STUDY STAGE | ||||||||||||
| 2022-G7 | RTOE Transitional Cluster | Weld County | CO | LAPT | 5/28/2025 | 80 | 80 | 80 | ER/NR | 0 | 0 | 0 | Solar | Photovoltaic | Sand Creek 115- Switching Station | 5/26/2022 | IA FULLY EXECUTED/ON SCHEDULE | ||||||||||||
| 2022-4444 | test 4444 | 01 NORTH | 0 | 2 | 2 | 0 | 0 | 0 | FEASIBILITY STUDY STAGE | N/A | |||||||||||||||||||
| 2019-G3 | RTOE Transitional Cluster | Weld County | CO | CRCM | 12/1/2021 | 150 | 150 | 150 | ER/NR | 0 | 0 | 0 | Solar | Photovoltaic | Ault 345- | 12/12/2018 | IA FULLY EXECUTED/ON SCHEDULE | ||||||||||||
| 2019-G2 | RTOE Transitional Cluster | Jackson County | CO | CRCM | 12/31/2028 | 252 | 252 | 252 | ER/NR | 0 | 0 | 0 | Wind | Wind | Craig - Ault 345- | 11/7/2018 | IA FULLY EXECUTED/ON SCHEDULE | ||||||||||||
| 2019-G1 | RTOE Transitional Cluster | Jackson County | CO | CRCM | 12/31/2028 | 252 | 252 | 252 | ER/NR | 0 | 0 | 0 | Wind | Wind | Craig - Ault 345- | 11/7/2018 | IA FULLY EXECUTED/ON SCHEDULE | ||||||||||||
| 2018-G6 | RTOE Transitional Cluster | San Juan County | NM | CRCM | 12/31/2022 | 360 | 360 | 360 | ER/NR | 0 | 0 | 0 | Hybrid | Solar/Storage | Shiprock 345- Sub | 9/10/2018 | IA PENDING | ||||||||||||
| 2017-G2 | RTOE Transitional Cluster | Banner County | NE | LAPT | 9/15/2020 | 130 | 130 | 130 | ER/NR | 0 | 0 | 0 | Wind | Wind | Roundtop - Stegall 115- | 1/17/2017 | IA PENDING |