SPP OPEN ACCESS TARIFF |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CUSTOMER TARIFF PURCHASES |
|
|
|
2016 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CUSTOMER |
CUSTOMER ID |
January |
February |
March |
April |
May |
June |
July |
August |
September |
October |
November |
December |
Grand Total |
|
|
|
CITY OF MALDEN BOARD OF PUBLIC
WORKS |
1073 |
$
20,146.90 |
$
20,294.63 |
$
20,425.48 |
$
20,397.12 |
$
20,381.86 |
$
20,248.27 |
$
20,353.70 |
$
20,462.67 |
$
4,359.50 |
$
8,986.72 |
$
8,961.56 |
$ 8,797.35 |
$
193,815.76 |
|
|
|
ROYAL BANK OF CANADA |
1RBC |
|
|
|
|
|
|
|
$ (0.89) |
|
|
|
|
$ (0.89) |
|
|
|
ARKANSAS ELECTRIC COOPERATIVE
CORPORATION |
AECC |
$
3,126,253.74 |
$
3,130,332.20 |
$
2,965,333.54 |
$
2,810,752.57 |
$
3,005,994.35 |
$
3,506,597.90 |
$
3,952,738.43 |
$
3,913,170.08 |
$
3,366,595.82 |
$
3,440,969.57 |
$
3,223,809.80 |
$
3,945,403.96 |
$
40,387,951.96 |
|
|
|
ASSOCIATED ELECTRIC COOPERATIVE,
INC. |
AECI |
$
14,401.23 |
$
17,174.82 |
$
17,552.65 |
$
8,743.60 |
$
8,868.58 |
$
9,843.85 |
$
10,780.61 |
$
16,722.01 |
$
17,791.55 |
$
8,851.03 |
$
9,188.04 |
$ 9,072.02 |
$
148,989.99 |
|
|
|
AMERICAN ELECTRIC POWER SERVICE
CORP |
AEPM |
$
21,271,630.97 |
$
21,329,479.97 |
$
20,274,852.60 |
$
20,672,671.82 |
$
23,154,110.01 |
$
25,652,054.73 |
$
28,039,180.01 |
$
29,111,702.88 |
$
27,792,161.47 |
$
27,083,583.26 |
$
25,111,849.96 |
$
27,533,780.80 |
$
297,027,058.48 |
|
|
|
ALLIANT ENERGY CORPORATE SERVICES
INC |
ALTM |
$
10,788.73 |
$
11,450.65 |
$
11,414.69 |
$
11,409.15 |
$
11,694.03 |
$
11,234.60 |
$
11,446.95 |
$
11,434.92 |
$
11,056.70 |
$
12,522.18 |
$
12,813.35 |
$ 11,291.86 |
$
138,557.81 |
|
|
|
ASSOCIATED ELECTRIC COOPERATIVE,
INC. - POWER MARKET |
APM |
$
47,273.28 |
$
44,342.08 |
$
54,014.51 |
$
53,410.65 |
$
42,183.35 |
$
69,056.16 |
$
69,858.97 |
$
14,461.41 |
$
42,205.58 |
$
38,141.74 |
$
68,503.23 |
$ 49,995.35 |
$
593,446.31 |
|
|
|
CITY OF BENTONVILLE |
BENT |
$
383,008.66 |
$
447,805.99 |
$
390,427.49 |
$
421,554.10 |
$
400,198.43 |
$
498,446.78 |
$
622,709.28 |
$
601,306.11 |
$
519,334.76 |
$
517,964.62 |
$
507,254.26 |
$
453,483.68 |
$
5,763,494.16 |
|
|
|
BASIN ELECTRIC POWER COOPERATIVE |
BEPM |
$
14,749,284.21 |
$
15,182,139.60 |
$
15,242,523.44 |
$
15,299,875.86 |
$
15,738,493.70 |
$
17,984,473.30 |
$
15,205,630.45 |
$
15,453,001.52 |
$
15,608,296.63 |
$
15,804,790.64 |
$
15,866,327.48 |
$
15,458,373.82 |
$
187,593,210.65 |
|
|
|
BLACK HILL POWER, INC. |
BHP |
$
(142.52) |
$
13,030.45 |
$
17,221.80 |
$
(2,168.75) |
$ (17.35) |
$
942.25 |
$ 24.58 |
$
894.42 |
$
65,475.36 |
$
(14,761.64) |
$ 84.81 |
$ 857.18 |
$
81,440.59 |
|
|
|
BROOKFIELD ENERGY MARKETING |
BMLP |
$
481.13 |
$ 26.00 |
$
(136.03) |
$
605.59 |
|
$ 0.43 |
|
$ (3.20) |
$ (0.23) |
|
|
|
$ 973.69 |
|
|
|
BP WIND ENERGY NORTH AMERICA, INC. |
BPAE |
|
|
|
|
|
|
|
$
373.36 |
|
|
|
|
$ 373.36 |
|
|
|
BONNEVILLE POWER ADMINISTRATION |
BPAP |
|
|
|
$
1,584.82 |
|
$
1,747.99 |
$ (17.72) |
$
2,588.94 |
$ 7.61 |
$
6,239.16 |
|
$ 8,993.51 |
$
21,144.31 |
|
|
|
CALPINE ENERGY SERVICES |
CALP |
|
$
541.58 |
|
|
|
|
|
$
(60,308.96) |
$
(134.42) |
|
|
|
$
(59,901.80) |
|
|
|
CITY OF CHANUTE |
CHAN |
$
436,706.71 |
$
451,720.96 |
$
451,286.74 |
$
452,371.44 |
$
452,074.90 |
$
287,606.48 |
$
419,404.97 |
$
420,475.82 |
$
423,893.65 |
$
424,846.47 |
$
428,910.73 |
$
425,647.19 |
$
5,074,946.06 |
|
|
|
CITY OF CHETOPA KS |
CHET |
$
8,837.13 |
$
8,511.85 |
$
8,677.50 |
$
8,630.00 |
$
8,668.20 |
$
8,624.63 |
$
9,195.44 |
$
9,219.37 |
$
9,258.71 |
$
9,072.64 |
$
9,173.94 |
$ 9,196.38 |
$
107,065.79 |
|
|
|
CITY OF COFFEYVILLE |
CMLP |
$
400,580.43 |
$
340,298.66 |
$
346,708.60 |
$
325,589.06 |
$
285,606.73 |
$
332,191.12 |
$
420,178.36 |
$
331,231.52 |
$
329,235.17 |
$
343,960.56 |
$
405,629.93 |
$
405,073.14 |
$
4,266,283.28 |
|
|
|
CIMARRON WIND ENERGY LLC |
CMRN |
$
475,969.38 |
$
479,737.84 |
$
487,031.50 |
$
485,303.28 |
$
454,480.22 |
$
438,752.67 |
$
451,237.04 |
$
543,253.78 |
$
425,159.88 |
$
428,353.13 |
$
474,395.31 |
$
529,000.27 |
$
5,672,674.30 |
|
|
|
CORAL POWER |
CORP |
|
|
|
|
|
|
|
|
$ 31.14 |
|
$ 0.02 |
|
$ 31.16 |
|
|
|
CITY OF WEST PLAINS |
COWP |
$
10,854.98 |
$
4,265.16 |
$
1,257.65 |
$ 4.52 |
$
306.12 |
$
12,775.24 |
$
19,848.19 |
$
19,505.29 |
$
10,779.43 |
$
228.02 |
$ 86.42 |
$ 8,039.92 |
$
87,950.94 |
|
|
|
CLECO POWER GROUP, LLC |
CPWR |
|
|
|
|
|
|
|
$ (17.64) |
$ (0.12) |
|
|
|
$ (17.76) |
|
|
|
CARGILL-ALLIANT, LLC |
CRGL |
$
53,205.85 |
$
60,880.59 |
$
138,169.29 |
$
47,827.41 |
$
780,422.50 |
$
447,027.14 |
$
405,339.96 |
$
409,448.76 |
$
(341,482.30) |
$
29,101.72 |
$
81,662.53 |
$
107,120.54 |
$
2,218,723.99 |
|
|
|
CARTHAGE WATER AND ELECTRIC PLANT |
CWEP |
$
48,376.52 |
$
46,951.30 |
$
41,623.47 |
$
42,146.79 |
$
43,819.49 |
$
82,015.76 |
$
89,071.41 |
$
88,488.92 |
$
68,563.60 |
$
52,385.45 |
$
40,144.39 |
$ 60,979.61 |
$
704,566.71 |
|
|
|
CITY OF COLUMBIA WATER & LIGHT |
CWLD |
|
|
|
$
61,611.48 |
$
58,066.06 |
$
57,138.55 |
$ 59.52 |
$
117,012.93 |
$
59,335.69 |
$
58,258.61 |
$
59,704.32 |
$ 53,140.90 |
$
524,328.06 |
|
|
|
CANADIAN WOOD PRODUCTS |
CWPE |
$
14,389.83 |
$
4,073.66 |
$
27,304.79 |
$
20,799.21 |
$
5,773.68 |
$
26,814.26 |
$
14,605.66 |
$
65,737.22 |
$
78,409.65 |
$
20,660.42 |
$
16,873.19 |
$ 15,573.65 |
$
311,015.22 |
|
|
|
D C TRANSCO |
DCT |
$
1,860,425.35 |
$
1,872,262.28 |
$
1,894,443.34 |
$
1,645,856.00 |
$
1,906,850.98 |
$
1,765,846.16 |
$
947,193.03 |
$
(505,563.30) |
$
3,844,943.67 |
$
1,357,595.75 |
$
2,099,224.80 |
$
2,108,153.32 |
$
20,797,231.38 |
|
|
|
DENVER ENERGY 2 |
DEN2 |
$ 27.13 |
$ (5.66) |
|
|
|
|
$
550.98 |
$
10,806.74 |
$
(321.94) |
$
(983.60) |
$
6,484.11 |
$ (663.81) |
$
15,893.95 |
|
|
|
DENVER ENERGY, LLC |
DENV |
|
|
|
|
|
$ 9.72 |
$
195.89 |
$ (68.06) |
$ (9.36) |
|
$ (0.01) |
$ 0.01 |
$ 128.19 |
|
|
|
DOGWOOD ENERGY, LLC |
DGWD |
$ (7.09) |
$ (30.69) |
|
$ (3.37) |
$ (1.61) |
$ (15.13) |
$ (16.12) |
$ (21.21) |
$ (6.81) |
$ (7.03) |
$ (9.07) |
|
$ (118.13) |
|
|
|
DEMPSEY RIDGE WIND FARM, LLC |
DRDG |
|
|
|
|
|
$
200.00 |
$
(200.00) |
|
|
|
$ 0.01 |
$ (0.01) |
$ - |
|
|
|
DTE ENERGY TRADING INC. |
DTET |
|
|
|
|
|
|
|
|
$ 58.02 |
|
$ 0.05 |
|
$ 58.07 |
|
|
|
DYNASTY POWER |
DYNP |
$
5,863.56 |
$
7,214.33 |
$
7,657.89 |
$ 7.25 |
$
195.55 |
|
$ 0.67 |
$
1,068.33 |
$
(407.78) |
$ 0.54 |
$ 9.46 |
$ (1.00) |
$
21,608.80 |
|
|
|
EMPIRE DISTRICT ELECTRIC CO. |
EDE |
$
3,263,474.00 |
$
3,236,563.10 |
$
3,289,398.55 |
$
3,284,323.75 |
$
3,299,604.00 |
$
3,260,641.97 |
$
3,482,486.31 |
$
3,490,047.17 |
$
3,507,161.82 |
$
3,445,521.33 |
$
3,484,495.80 |
$
3,480,307.38 |
$
40,524,025.18 |
|
|
|
CANEY RIVER WIND PROJECT LLC |
EGP2 |
$
581,684.61 |
$
584,071.98 |
$
593,112.29 |
$
592,410.17 |
$
553,627.83 |
$
534,648.25 |
$
548,034.25 |
$
610,020.83 |
$
516,142.35 |
$
520,091.49 |
$
576,726.98 |
$
579,929.35 |
$
6,790,500.38 |
|
|
|
BOSTON ENERGY TRADING AND MARKETING
LLC |
EMMT |
|
|
|
|
|
|
|
|
$ (0.63) |
|
|
|
$ (0.63) |
|
|
|
ENDURE ENERGY |
ENDU |
$
44,640.98 |
$
68,152.72 |
$
121,145.41 |
$
67,716.38 |
$
25,767.56 |
$
10,123.00 |
$
7,214.53 |
$
2,937.07 |
$
25,923.28 |
$
20,227.52 |
$
20,951.60 |
$ 34,153.96 |
$
448,954.01 |
|
|
|
ENTERGY SERVICES, INC. |
ENTE |
|
|
|
|
|
|
|
$ (29.03) |
$ (0.01) |
|
|
|
$ (29.04) |
|
|
|
EAST TEXAS ELECTRIC COOPERATIVE,
INC. |
ETEC |
$
308,226.40 |
$
307,239.28 |
$
326,571.84 |
$
287,653.34 |
$
288,101.69 |
$
294,020.08 |
$
367,853.12 |
$
365,743.82 |
$
312,307.37 |
$
347,800.25 |
$
1,267,097.42 |
$
3,441,902.77 |
$
7,914,517.38 |
|
|
|
EXELON GENERATION COMPANY, LLC |
EXGN |
$
5,485.93 |
$
123.54 |
$
4,952.48 |
$
14,196.70 |
$
3,364.07 |
$
2,760.99 |
$
2,291.74 |
$
(75,503.81) |
$
(1,206.77) |
$
278.77 |
$
111.82 |
$ 277.58 |
$
(42,866.96) |
|
|
|
NEXTERA ENERGY POWER MARKETING, LLC |
FPLP |
|
$ (13.73) |
|
|
$
306.30 |
$
546.86 |
$ 0.01 |
$
(297.39) |
|
$ (5.09) |
|
$ (24.89) |
$ 512.07 |
|
|
|
FLAT RIDGE 2 WIND ENERGY, LLC |
FR2W |
$
862,945.78 |
$
871,621.58 |
$
885,769.39 |
$
884,491.46 |
$
827,394.88 |
$
799,394.53 |
$
821,129.58 |
$
914,376.25 |
$
774,740.14 |
$
779,487.17 |
$
860,019.89 |
$
865,229.92 |
$
10,146,600.57 |
|
|
|
CITY OF FREMONT |
FREM |
$
23,669.12 |
$
24,684.59 |
$
36,170.84 |
$
53,214.19 |
$
56,901.54 |
$
77,598.18 |
$
36,908.71 |
$
115,029.08 |
$
42,814.51 |
$
26,193.09 |
$
13,217.53 |
$ 30,658.78 |
$
537,060.16 |
|
|
|
GRAND RIVER DAM AUTHORITY |
GRDX |
$
3,015,167.27 |
$
3,132,408.49 |
$
3,132,301.51 |
$
3,137,039.03 |
$
3,162,814.39 |
$
3,146,480.18 |
$
3,171,521.14 |
$
3,220,880.19 |
$
3,256,101.54 |
$
3,264,147.56 |
$
3,241,827.69 |
$
3,243,431.02 |
$
38,124,120.01 |
|
|
|
CITY OF GRAND ISLAND NEBRASKA
UTILITIES DEPARTMENT |
GRIS |
$
7,115.74 |
$
7,155.17 |
$
7,191.88 |
$
7,182.61 |
$
7,177.34 |
$
7,132.76 |
$
7,162.06 |
$
7,187.46 |
$
7,171.93 |
$
7,089.32 |
$
7,177.60 |
$ 7,194.43 |
$
85,938.30 |
|
|
|
GOLDEN SPREAD ELECTRIC COOPERATIVE,
INC. |
GSEC |
$
2,024,177.88 |
$
3,018,640.86 |
$
2,981,477.67 |
$
3,097,571.77 |
$
3,385,606.04 |
$
3,382,000.31 |
$
4,341,974.79 |
$
4,667,892.07 |
$
4,982,669.66 |
$
3,189,151.19 |
$
3,296,881.99 |
$
3,268,935.01 |
$
41,636,979.24 |
|
|
|
HEARTLAND CONSUMERS POWER DISTRICT |
HCPD |
$
401,292.35 |
$
399,561.10 |
$
421,592.92 |
$
427,188.21 |
$
417,697.94 |
$
612,168.13 |
$
466,122.62 |
$
437,099.92 |
$
(139,343.27) |
$
(66,154.94) |
$
400,838.70 |
$
154,240.27 |
$
3,932,303.95 |
|
|
|
HARLAN MUNICIPAL UTILITIES |
HMMU |
$
18,409.00 |
$
17,780.23 |
$
17,550.31 |
$
17,983.16 |
$
18,335.04 |
$
21,893.73 |
$
19,586.52 |
$
19,770.70 |
$
18,727.14 |
$
20,130.46 |
$
21,001.98 |
$ 18,977.56 |
$
230,145.83 |
|
|
|
HIGGINSVILLE MUNICIPAL UTILITIES |
HMU |
|
$ 4.48 |
|
$ 12.22 |
$ (18.90) |
$ (32.36) |
$ (32.93) |
$ (58.22) |
$ (0.23) |
|
|
|
$ (125.94) |
|
|
|
HOPE WATER AND LIGHT COMMISSION |
HOPE |
$
178,010.90 |
$
176,431.62 |
$
168,954.57 |
$
167,937.48 |
$
190,794.54 |
$
214,821.62 |
$
214,267.87 |
$
237,769.65 |
$
204,367.72 |
$
185,044.25 |
$
208,012.34 |
$
211,318.53 |
$
2,357,731.09 |
|
|
|
HQ ENERGY SERVICES |
HQUS |
$
3,745.53 |
$
17,016.37 |
$
31,528.37 |
$
32,247.08 |
$
6,904.54 |
$
8,261.66 |
$
7,022.11 |
$
46,907.26 |
$
32,713.82 |
$
21,966.05 |
$
2,315.52 |
$ 14,702.79 |
$
225,331.10 |
|
|
|
CITY OF INDEPENDENCE - POWER &
LIGHT |
INDP |
$
475,421.73 |
$
460,097.80 |
$
470,000.82 |
$
468,179.86 |
$
449,018.75 |
$
425,298.72 |
$
423,829.87 |
$
452,857.87 |
$
443,457.77 |
$
488,898.80 |
$
416,855.62 |
$
459,001.84 |
$
5,432,919.45 |
|
|
|
J.P. MORGAN VENTURES ENERGY
CORPORATION |
JPMV |
|
|
|
|
|
|
|
$ (37.36) |
$ (0.04) |
|
|
|
$ (37.40) |
|
|
|
KANSAS CITY BOARD OF PUBLIC
UTILITIES |
KBPU |
$
619,227.20 |
$
677,171.41 |
$
684,707.59 |
$
718,288.76 |
$
704,983.64 |
$
675,711.33 |
$
682,327.45 |
$
766,702.78 |
$
776,722.28 |
$
637,972.76 |
$
683,318.05 |
$
668,582.51 |
$
8,295,715.76 |
|
|
|
KANSAS CITY POWER & LIGHT, CO. |
KCPS |
$
6,232,761.76 |
$
6,423,632.90 |
$
6,480,894.67 |
$
6,466,118.31 |
$
6,089,266.97 |
$
5,621,638.95 |
$
4,403,296.62 |
$
6,035,760.05 |
$
5,839,440.85 |
$
6,287,174.17 |
$
6,403,496.44 |
$
6,328,079.99 |
$
72,611,561.68 |
|
|
|
TRADEMARK MERCHANT ENERGY, LLC |
KEMG |
|
|
|
|
|
|
|
$ (29.69) |
$ (0.03) |
|
|
|
$ (29.72) |
|
|
|
KANSAS ELECTRIC POWER COOPERATIVE |
KEPC |
$
1,999,325.83 |
$
1,956,860.62 |
$
1,959,443.17 |
$
1,959,953.63 |
$
1,972,971.98 |
$
1,466,484.38 |
$
1,855,835.94 |
$
1,885,782.94 |
$
1,926,608.10 |
$
1,891,426.61 |
$
1,976,527.08 |
$
1,929,371.39 |
$
22,780,591.67 |
|
|
|
KANSAS MUNICIPAL ENERGY AGENCY |
KMEA |
$
1,243,999.93 |
$
1,283,310.82 |
$
1,168,017.11 |
$
1,272,401.56 |
$
1,254,253.42 |
$
1,082,873.49 |
$
1,156,285.09 |
$
1,290,701.74 |
$
1,317,143.50 |
$
1,288,069.68 |
$
1,318,101.03 |
$
1,295,195.32 |
$
14,970,352.69 |
|
|
|
KENNETT BOARD OF PUBLIC WORKS |
KN01 |
$
57,562.66 |
$
57,984.92 |
$
58,358.78 |
$
58,277.53 |
$
58,233.70 |
$
57,851.62 |
$
58,152.80 |
$
58,464.68 |
$
58,286.46 |
$
59,284.96 |
$
60,445.89 |
$ 60,620.65 |
$
703,524.65 |
|
|
|
KANSAS POWER POOL |
KPP |
$
777,087.06 |
$
872,427.35 |
$
873,395.63 |
$
873,564.11 |
$
878,235.24 |
$
583,302.63 |
$
815,710.86 |
$
825,783.53 |
$
834,306.19 |
$
832,438.90 |
$
841,833.62 |
$
833,860.64 |
$
9,841,945.76 |
|
|
|
KAW VALLEY ELECTRIC COOPERATIVE |
KVEC |
$
172,035.84 |
$
181,840.63 |
$
186,232.17 |
$
181,797.12 |
$
181,677.52 |
$
116,779.07 |
$
168,991.98 |
$
169,365.25 |
$
170,474.64 |
$
170,622.71 |
$
172,114.48 |
$
170,888.44 |
$
2,042,819.85 |
|
|
|
LOUISIANA GENERATING LLC |
LAGM |
|
|
|
|
|
|
|
$ (11.02) |
$ (0.03) |
|
|
|
$ (11.05) |
|
|
|
WESTERN AREA POWER ADMINISTRATION-
ROCKY MOUNTAIN REGION |
LAPM |
$
1,289.92 |
$
852.17 |
$
7,834.39 |
$
9,759.71 |
$
1,059.07 |
$ 5.34 |
$
5,872.92 |
$
5,364.32 |
$
12,617.20 |
$
3,029.34 |
$
6,425.10 |
$ 9,183.97 |
$
63,293.45 |
|
|
|
LOUISIANA ENERGY AND POWER
AUTHORITY |
LEPM |
|
|
|
|
|
|
|
$ (1.19) |
|
|
|
|
$ (1.19) |
|
|
|
LINCOLN ELECTRIC SYSTEM MARKETING |
LESM |
$
2,297,076.24 |
$
2,865,457.70 |
$
2,866,507.69 |
$
2,860,512.19 |
$
2,869,483.30 |
$
2,854,708.06 |
$
2,895,701.39 |
$
2,901,465.22 |
$
2,912,628.68 |
$
2,929,546.66 |
$
2,804,005.57 |
$
2,800,170.65 |
$
33,857,263.35 |
|
|
|
CITY OF LOCKWOOD, MO |
LOCK |
$
7,656.04 |
$
7,597.43 |
$
7,728.13 |
$
7,729.15 |
$
7,787.02 |
$
7,728.72 |
$
8,238.87 |
$
8,250.90 |
$
8,291.85 |
$
8,128.34 |
$
8,196.89 |
$ 8,210.15 |
$
95,543.49 |
|
|
|
CITY OF LAFAYETTE |
LUS |
$
22,323.23 |
$
22,484.71 |
$
22,717.37 |
$
22,695.46 |
$
22,884.53 |
$
22,365.99 |
$
24,121.38 |
$
24,767.51 |
$
24,414.52 |
$
24,671.89 |
$
25,188.20 |
$ 25,299.41 |
$
283,934.20 |
|
|
|
MAG EERGY SOLUTIONS, INC. |
MAG |
$
2,284.72 |
$
14,627.96 |
$
34,382.24 |
$
20,734.34 |
$
21,500.36 |
$
20,611.87 |
$
14,693.41 |
$
34,578.64 |
$
91,306.33 |
$
81,515.47 |
$
8,163.61 |
$ 37,355.83 |
$
381,754.78 |
|
|
|
MACQUARIE ENERGY LLC |
MCPI |
$
4,029.23 |
$
9,166.65 |
$
61,117.00 |
$
67,255.02 |
$
51,356.68 |
$
62,014.80 |
$
27,010.95 |
$
(7,636.79) |
$
39,586.61 |
$
16,651.16 |
$
1,608.85 |
$ (1,075.80) |
$
331,084.36 |
|
|
|
MONETT CITY UTILITIES |
MCU |
$
134,387.70 |
$
134,796.82 |
$
136,936.85 |
$
136,979.54 |
$
138,145.15 |
$
136,532.91 |
$
145,513.14 |
$
145,905.33 |
$
146,548.69 |
$
143,832.65 |
$
145,457.47 |
$
145,589.91 |
$
1,690,626.16 |
|
|
|
MONTANA-DAKOTA UTILITIES CO. |
MDUM |
$
183,307.78 |
$
1,642,999.11 |
$
1,878,686.61 |
$
1,683,587.05 |
$
1,451,511.18 |
$
(3,924,214.51) |
$
566,142.08 |
$
606,757.82 |
$
997,437.79 |
$
798,190.94 |
$
782,383.91 |
$
785,821.01 |
$
7,452,610.77 |
|
|
|
MERCURIA ENERGY AMERICA |
MEAI |
$
8,420.66 |
$
7,513.79 |
$
24,198.96 |
$
10,085.95 |
$
2,290.64 |
$
112.83 |
$
949.75 |
$
1,943.79 |
$
3,061.31 |
$
36,754.09 |
$
72,318.40 |
$ 44,712.52 |
$
212,362.69 |
|
|
|
MUNICIPAL ENERGY AGENCY OF NEBRASKA |
MEAN |
$
429,343.62 |
$
455,660.57 |
$
559,343.84 |
$
452,234.88 |
$
472,620.56 |
$
477,826.29 |
$
489,417.89 |
$
494,142.29 |
$
507,736.46 |
$
488,575.79 |
$
531,010.63 |
$
474,131.77 |
$
5,832,044.59 |
|
|
|
MIDWEST ENERGY |
MIDW |
$
1,316,371.41 |
$
1,352,526.79 |
$
1,354,513.06 |
$
1,449,646.12 |
$
1,359,983.72 |
$
1,344,027.34 |
$
1,346,996.48 |
$
1,361,899.73 |
$
1,367,753.37 |
$
1,455,883.01 |
$
1,492,684.23 |
$
1,479,111.88 |
$
16,681,397.14 |
|
|
|
CITY OF MINDEN |
MIND |
$
86,275.56 |
$
90,847.74 |
$
94,316.98 |
$
96,859.82 |
$
114,780.72 |
$
119,420.87 |
$
144,565.12 |
$
142,033.18 |
$
94,449.41 |
$
123,408.75 |
$
112,229.06 |
$
108,813.57 |
$
1,328,000.78 |
|
|
|
MIDCONTINENT INDEPENDENT SYSTEM
OPERATOR, INC |
MISO |
|
|
|
$
8,723,832.74 |
$
670,437.17 |
$
517,805.53 |
$
517,805.48 |
$
517,805.47 |
$
517,805.47 |
$
517,805.47 |
$
517,780.48 |
$
517,830.46 |
$
13,018,908.27 |
|
|
|
MID-KANSAS ELECTRIC COMPANY |
MKEC |
$
1,923,533.49 |
$
1,425,680.46 |
$
1,422,499.89 |
$
1,412,101.44 |
$
1,424,687.79 |
$
1,408,483.21 |
$
1,477,437.26 |
$
1,503,888.51 |
$
1,506,208.25 |
$
1,498,834.37 |
$
1,632,675.80 |
$
1,533,790.52 |
$
18,169,820.99 |
|
|
|
MERRILL LYNCH COMMODITIES, INC. |
MLCI |
|
|
|
|
|
|
|
$ (2.59) |
|
|
|
|
$ (2.59) |
|
|
|
MINNESOTA MUNICIPAL POWER AGENCY |
MMPA |
$ 72.29 |
$
1,325.58 |
$
1,510.04 |
$
1,165.46 |
$
647.98 |
$
1,708.61 |
$
7,141.32 |
$
(224.84) |
$
(3,320.93) |
$
1,124.35 |
$
1,083.84 |
$ 1,120.88 |
$
13,354.58 |
|
|
|
MONTEREY SW, LLC |
MOSW |
|
|
|
|
|
|
|
|
$ 8.34 |
|
$ 0.01 |
|
$ 8.35 |
|
|
|
MISSOURI JOINT MUNICIPAL EUC |
MOWR |
$
465,964.67 |
$
467,264.07 |
$
471,841.89 |
$
477,043.47 |
$
448,786.90 |
$
354,684.62 |
$
413,188.89 |
$
343,878.83 |
$
439,098.83 |
$
363,986.85 |
$
402,052.89 |
$
450,216.60 |
$
5,098,008.51 |
|
|
|
MINNKOTA POWER COOPERATIVE, INC |
MPCN |
$
47,034.85 |
$
55,371.90 |
$
56,626.62 |
$
56,576.70 |
$
54,867.15 |
$
66,539.30 |
$
58,807.82 |
$
58,417.39 |
$
60,133.52 |
$
61,841.48 |
$
62,367.30 |
$ 60,841.32 |
$
699,425.35 |
|
|
|
MISSOURI RIVER ENERGY SERVICES |
MRES |
$
945,837.72 |
$
1,068,036.32 |
$
1,087,998.02 |
$
1,080,150.93 |
$
1,077,333.83 |
$
1,317,193.04 |
$
1,139,402.37 |
$
1,177,663.50 |
$
1,160,827.54 |
$
1,180,150.78 |
$
1,178,812.06 |
$
1,151,015.84 |
$
13,564,421.95 |
|
|
|
MORGAN STANLEY CAPITAL GROUP INC. |
MSCG |
$
59,545.41 |
$
121,133.70 |
$
67,369.17 |
$
52,690.09 |
$
22,667.07 |
$
48,572.29 |
$
21,320.08 |
$
41,858.78 |
$
52,482.90 |
$
37,622.89 |
$
43,062.19 |
$ 90,512.63 |
$
658,837.20 |
|
|
|
CITY OF MT. VERNON, MO |
MTVN |
$
45,666.44 |
$
45,121.97 |
$
45,919.86 |
$
45,890.48 |
$
46,230.86 |
$
45,810.70 |
$
48,858.08 |
$
48,943.90 |
$
49,119.65 |
$
48,198.97 |
$
48,695.58 |
$ 48,769.48 |
$
567,225.97 |
|
|
|
CITY OF MULVANE, KS |
MULV |
$ (38.67) |
|
|
|
|
|
|
|
|
|
|
|
$ (38.67) |
|
|
|
NOBLE AMERICAS GAS & POWER
CORP. |
NAGP |
|
$ 1.06 |
|
$ (10.17) |
$
(117.21) |
$
1,375.58 |
$
2,488.26 |
$
(4,206.83) |
$
(392.70) |
$
(229.84) |
$ (0.12) |
$ (591.41) |
$
(1,683.38) |
|
|
|
NATURENER POWER WATCH, LLC |
NATU |
$
22,942.46 |
$
48,348.65 |
$
36,794.96 |
$
23,840.40 |
$
13,550.42 |
$
21,609.11 |
$
9,881.64 |
$
11,289.04 |
$
23,251.77 |
$
10,587.36 |
$
21,710.15 |
$ 35,442.78 |
$
279,248.74 |
|
|
|
CITY OF NELIGH, NE |
NELI |
$
13,541.51 |
$
13,544.60 |
$
13,577.21 |
$
13,547.05 |
$
13,603.51 |
$
13,394.84 |
$
13,527.20 |
$
13,585.00 |
$
13,606.97 |
$
13,789.34 |
$
13,599.45 |
$ 13,544.76 |
$
162,861.44 |
|
|
|
NORTH IOWA MUNICIPAL ELECTRIC
COOPERATIVE ASSOCIATION |
NMCA |
|
|
|
|
|
|
$
344,317.09 |
$
351,733.60 |
$
346,184.87 |
$
343,727.62 |
$
345,044.90 |
$
343,529.12 |
$
2,074,537.20 |
|
|
|
NEMAHA-MARSHALL ELECTRIC
COOPERATIVE |
NMEC |
$
55,152.37 |
$
58,872.99 |
$
58,710.21 |
$
58,868.10 |
$
58,832.64 |
$
38,570.74 |
$
52,922.76 |
$
55,406.53 |
$
56,826.31 |
$
56,102.48 |
$
56,586.88 |
$ 56,191.95 |
$
663,043.96 |
|
|
|
NEBRASKA PUBLIC POWER DISTRICT |
NPPM |
$
7,390,068.03 |
$
7,492,881.32 |
$
7,500,676.15 |
$
7,496,245.04 |
$
7,541,013.43 |
$
7,428,586.01 |
$
7,045,942.06 |
$
7,538,029.73 |
$
7,546,714.97 |
$
7,643,569.38 |
$
7,538,890.40 |
$
7,507,513.13 |
$
89,670,129.65 |
|
|
|
NRG POWER MARKETING, INC. |
NRG |
|
|
|
$
3,070,629.87 |
$
(28,220.12) |
$
240,690.16 |
$
176,903.05 |
$
176,903.06 |
$
176,903.06 |
$
176,903.06 |
$
176,894.52 |
$
176,911.60 |
$
4,344,518.26 |
|
|
|
NORTHPOINT ENERGY SOLUTIONS |
NRPT |
$
2,477.58 |
$
3,350.46 |
$
13,193.86 |
|
$ (0.01) |
|
$
11,458.71 |
$
27,125.92 |
$
9,613.41 |
$ (1.23) |
$
10,657.60 |
$ 8,728.57 |
$
86,604.87 |
|
|
|
NSP ENERGY MARKETING |
NSPP |
$
3,831.69 |
$
4,576.87 |
$
4,682.94 |
$
4,647.56 |
$
4,645.54 |
$
5,618.28 |
$
4,689.11 |
$
5,041.98 |
$
9,143.67 |
$
5,021.58 |
$
5,093.31 |
$ 7,334.94 |
$
64,327.47 |
|
|
|
NORTHEAST TEXAS ELECTRIC
COOPERATIVE, INC. |
NTEC |
$
2,359,449.25 |
$
2,483,532.92 |
$
2,448,378.84 |
$
2,207,524.87 |
$
2,195,851.32 |
$
2,333,550.04 |
$
2,793,830.10 |
$
2,688,092.06 |
$
2,303,730.38 |
$
2,051,405.68 |
$
1,685,030.04 |
$
(164,498.53) |
$
25,385,876.97 |
|
|
|
NORTHWESTERN ENERGY |
NWDS |
$
102,075.89 |
$
143,517.23 |
$
193,734.94 |
$
143,840.71 |
$
144,215.82 |
$
170,167.99 |
$
149,915.47 |
$
152,675.72 |
$
151,655.03 |
$
153,619.09 |
$
154,333.33 |
$
150,763.36 |
$
1,810,514.58 |
|
|
|
NORTHWESTERN CORPORATION DBA
NORTHWESTERN ENERGY |
NWPS |
$
1,418,661.14 |
$
1,472,420.39 |
$
1,402,755.43 |
$
1,418,487.30 |
$
1,436,836.58 |
$
1,721,751.09 |
$
1,278,358.44 |
$
1,534,783.42 |
$
1,515,312.38 |
$
1,617,756.21 |
$
1,709,992.33 |
$
1,508,042.23 |
$
18,035,156.94 |
|
|
|
OKLAHOMA GAS & ELECTRIC |
OGE |
$
15,555,011.86 |
$
17,004,242.33 |
$
17,044,759.20 |
$
17,024,914.14 |
$
17,159,863.23 |
$
16,943,329.82 |
$
17,207,614.65 |
$
17,282,322.22 |
$
17,315,583.69 |
$
17,638,746.65 |
$
17,660,245.19 |
$
18,077,959.55 |
$
205,914,592.53 |
|
|
|
ONETA POWER |
OLSP |
|
|
|
$ (18.85) |
$ (51.77) |
$ (79.05) |
|
$ (9.69) |
$ (37.17) |
$ (62.77) |
$ (2.44) |
$ (9.14) |
$ (270.88) |
|
|
|
OKLAHOMA MUNICIPAL POWER AUTHORITY |
OMPA |
$
1,447,775.67 |
$
1,807,881.19 |
$
1,762,901.87 |
$
1,734,765.97 |
$
1,831,927.33 |
$
1,861,030.75 |
$
1,785,632.81 |
$
1,906,052.03 |
$
2,060,707.72 |
$
1,800,386.81 |
$
1,984,592.07 |
$
1,940,865.90 |
$
21,924,520.12 |
|
|
|
OMAHA PUBLIC POWER DISTRICT |
OPPM |
$
5,436,683.12 |
$
5,574,465.70 |
$
5,580,981.32 |
$
5,572,264.74 |
$
5,600,579.07 |
$
5,551,660.57 |
$
5,653,912.55 |
$
5,670,406.46 |
$
6,183,016.66 |
$
6,243,421.94 |
$
6,091,337.20 |
$
6,059,317.80 |
$
69,218,047.13 |
|
|
|
OTTER TAIL POWER COMPANY |
OTPW |
|
|
|
$
175,493.01 |
$
525,450.59 |
$
238,057.24 |
$
184,233.61 |
$
188,693.75 |
$
188,203.00 |
$
187,250.87 |
$
190,387.33 |
$
191,500.75 |
$
2,069,270.15 |
|
|
|
CITY OF PIGGOTT AR MUNICIPAL LIGHT
WATER AND SEWER |
PARL |
$
23,025.25 |
$
23,194.20 |
$
23,343.76 |
$
23,310.88 |
$
23,293.78 |
$
23,140.85 |
$
23,261.07 |
$ (88.08) |
$
15,657.08 |
$
7,643.12 |
$
7,520.50 |
$ 7,277.88 |
$
200,580.29 |
|
|
|
CITY OF POPLAR BLUFF MUNICIPAL
UTILITIES |
PBEL |
$
57,562.66 |
$
57,984.92 |
$
58,358.78 |
$
58,277.53 |
$
58,233.70 |
$
57,851.62 |
$
58,152.80 |
$
58,464.68 |
$
58,286.46 |
$
59,284.96 |
$
60,445.89 |
$ 60,620.65 |
$
703,524.65 |
|
|
|
PEC |
PEC |
|
|
|
|
|
$
24,268.92 |
$
124,563.96 |
$
143,663.65 |
$
172,492.08 |
$
155,788.50 |
$
168,472.67 |
$
166,182.95 |
$
955,432.73 |
|
|
|
PARAGOULD LIGHT & WATER
COMMISSION |
PLWC |
$
57,562.66 |
$
58,026.64 |
$
58,358.78 |
$
58,277.52 |
$
58,233.70 |
$
57,853.17 |
$
58,152.80 |
$
58,053.79 |
$
58,283.82 |
$
59,284.96 |
$
60,445.89 |
$ 60,620.65 |
$
703,154.38 |
|
|
|
CITY OF PRESCOTT |
PRES |
$
45,341.76 |
$
51,324.31 |
$
47,718.82 |
$
44,198.79 |
$
48,965.07 |
$
52,185.00 |
$
60,331.73 |
$
60,940.34 |
$
50,967.88 |
$
57,857.93 |
$
61,097.48 |
$ 53,778.42 |
$
634,707.53 |
|
|
|
PUBLIC SERVICE COMPANY OF COLORADO |
PSCM |
|
$
654.25 |
$
1,118.09 |
$
(381.42) |
$ 0.44 |
|
|
$ (0.01) |
$ (31.33) |
|
|
|
$ 1,360.02 |
|
|
|
UNION POWER PARTNERS |
PUPP |
|
$ 0.79 |
|
|
|
|
|
$ (1.03) |
|
|
|
|
$ (0.24) |
|
|
|
PURE ENERGY, INC. |
PURE |
|
|
$
8,777.95 |
$
28,745.02 |
$ 7.52 |
$ 19.92 |
|
$ (0.30) |
|
|
|
|
$
37,550.11 |
|
|
|
POWEREX CORP. |
PWX |
$
900.64 |
$
1,787.70 |
$
2,413.33 |
$
5,130.75 |
$
(145.15) |
$
182.02 |
$ 66.26 |
$
326.30 |
$
3,242.65 |
$
1,908.19 |
$
473.88 |
$ (334.58) |
$
15,951.99 |
|
|
|
RAINBOW ENERGY MARKETING
CORPORATION |
REMC |
$
1,330.51 |
$
217.70 |
$
14,695.32 |
$
17,584.31 |
$
287.57 |
$
790.64 |
$
4,098.66 |
$
2,957.39 |
$
7,427.18 |
$
17,817.20 |
$
945.87 |
$ 11,606.15 |
$
79,758.50 |
|
|
|
RESALE POWER GROUP IOWA |
RPGI |
$
4,481.13 |
$
4,315.01 |
$
4,659.19 |
$
4,711.46 |
$
4,587.11 |
$
5,930.91 |
$
5,013.04 |
$
5,035.12 |
$
5,572.50 |
$
(2,279.22) |
$
13,195.07 |
$ 5,231.84 |
$
60,453.16 |
|
|
|
SUNFLOWER ELECTRIC POWER
CORPORATION-PM |
SEPC |
$
1,922,842.52 |
$
2,406,485.68 |
$
2,405,532.43 |
$
2,411,026.54 |
$
2,426,670.57 |
$
2,392,979.11 |
$
2,467,203.15 |
$
2,489,448.17 |
$
2,493,347.28 |
$
2,466,298.30 |
$
2,544,177.84 |
$
2,491,146.18 |
$
28,917,157.77 |
|
|
|
SEMPRA GENERATION |
SGEN |
$
197.29 |
$ 3.71 |
|
|
$ (0.01) |
|
$
2,842.95 |
$
2,622.71 |
$
39,827.15 |
$
44,544.38 |
$
58,457.86 |
$ 31,407.93 |
$
179,903.97 |
|
|
|
SEMPRA GAS AND POWER MARKETING, LLC |
SGPM |
|
|
|
|
|
|
|
|
|
|
|
$ 415.83 |
$ 415.83 |
|
|
|
SHDY |
SHDY |
|
|
|
|
|
|
|
$ - |
$ - |
|
|
|
$ - |
|
|
|
SOUTH MISS. ELECTRIC POWER ASSOC. |
SMEP |
|
|
|
|
|
|
|
$ (17.41) |
$ (0.04) |
|
|
|
$ (17.45) |
|
|
|
SOUTHERN MONTANA ELEC GEN AND TRANS
COOP |
SMGT |
$
32,722.73 |
$
19,060.32 |
$
20,216.07 |
$
18,933.00 |
$
18,558.43 |
$
23,337.33 |
$
20,901.28 |
$
22,023.33 |
$
20,567.00 |
$
12,060.92 |
$
3,281.83 |
$ 19,802.85 |
$
231,465.09 |
|
|
|
CITY UTILITIES OF SPRINGFIELD |
SPRM |
$
1,549,362.56 |
$
1,564,782.62 |
$
1,562,703.89 |
$
1,724,745.44 |
$
1,748,781.07 |
$
1,760,406.51 |
$
1,734,753.96 |
$
1,785,783.27 |
$
1,792,990.39 |
$
1,714,578.25 |
$
1,723,148.08 |
$
1,730,982.63 |
$
20,393,018.67 |
|
|
|
SOUTHWEST PUBLIC SERVICE COMPANY |
SPSM |
$
7,458,693.75 |
$
10,940,479.86 |
$
10,857,502.48 |
$
10,831,523.21 |
$
11,149,447.44 |
$
11,275,861.86 |
$
11,782,079.90 |
$
9,931,501.30 |
$
11,952,922.99 |
$
11,688,984.95 |
$
11,745,405.88 |
$
11,483,473.04 |
$
131,097,876.66 |
|
|
|
SUSTAINING POWER SOLUTIONS |
SUSP |
$
325,228.06 |
$
328,027.69 |
$
332,973.19 |
$
332,429.23 |
$
332,423.46 |
$
328,953.50 |
$
332,292.35 |
$
337,908.53 |
$
337,063.57 |
$
341,987.42 |
$
348,081.01 |
$
350,375.90 |
$
4,027,743.91 |
|
|
|
SOUTHERN COMPANY SERVICES, INC |
SWE |
$
1,312,547.25 |
$
1,319,713.11 |
$
1,337,054.96 |
$
1,336,417.28 |
$
1,335,602.99 |
$
1,299,663.02 |
$
1,327,077.64 |
$
1,371,722.87 |
$
1,346,145.12 |
$
1,366,495.56 |
$
1,402,004.69 |
$
1,407,850.06 |
$
16,162,294.55 |
|
|
|
SOUTHWESTERN POWER ADMINISTRATION |
SWPA |
$
(23,191.94) |
$
49,733.15 |
$
33,003.30 |
$
39,003.90 |
$
38,226.74 |
$
166,054.50 |
$
156,448.22 |
$
133,432.63 |
$
183,425.80 |
$
150,298.17 |
$
113,440.81 |
$ 39,825.71 |
$
1,079,700.99 |
|
|
|
THE ENERGY AUTHORITY |
TEA |
$
71,670.50 |
$
80,178.88 |
$
80,922.11 |
$
73,062.90 |
$
68,335.53 |
$
67,917.54 |
$
68,953.92 |
$
51,503.78 |
$
63,929.25 |
$
64,283.28 |
$
71,165.87 |
$ 69,534.87 |
$
831,458.43 |
|
|
|
TEC ENERGY INC. |
TECX |
$ 27.78 |
$ 0.04 |
$ 0.01 |
|
|
|
|
$
8,990.86 |
$
1,522.18 |
$ (19.48) |
$
433.58 |
$ 1,967.63 |
$
12,922.60 |
|
|
|
TRANSALTA ENERGY MARKETING (U.S.)
INC. |
TEMU |
$
637.88 |
$
5,273.31 |
$
21,277.98 |
$
8,512.14 |
$
10,098.10 |
$
2,218.27 |
$
1,886.02 |
$
26,359.60 |
$
17,885.10 |
$
4,747.41 |
$
3,559.85 |
$ 2,621.93 |
$
105,077.59 |
|
|
|
TWIN EAGLE RESOURCE MANAGEMENT, LLC |
TERM |
|
|
|
|
|
|
|
$ (0.08) |
|
|
|
|
$ (0.08) |
|
|
|
TEX-LA ELECTRIC COOPERATIVE OF
TEXAS, INC. |
TEXL |
$
487,827.55 |
$
504,105.16 |
$
526,029.91 |
$
470,527.63 |
$
512,705.84 |
$
512,644.90 |
$
502,135.50 |
$
530,629.44 |
$
556,347.14 |
$
462,145.04 |
$
418,882.30 |
$
146,521.41 |
$
5,630,501.82 |
|
|
|
TENASKA POWER SERVICE CO. |
TNSK |
$
257,495.91 |
$
256,715.16 |
$
293,764.69 |
$
605,244.86 |
$
437,664.40 |
$
284,587.31 |
$
250,148.75 |
$
211,401.57 |
$
414,751.98 |
$
362,342.15 |
$
330,587.74 |
$
335,947.82 |
$
4,040,652.34 |
|
|
|
UTILICORP UNITED INC. |
UCU |
$
1,838,754.55 |
$
1,957,712.23 |
$
1,977,185.69 |
$
1,966,936.47 |
$
1,993,707.15 |
$
1,928,152.94 |
$
1,961,501.67 |
$
1,991,125.63 |
$
2,023,990.04 |
$
2,086,367.97 |
$
2,153,670.50 |
$
2,143,007.63 |
$
24,022,112.47 |
|
|
|
WESTERN AREA POWER ADMINISTRATION -
UGP MARKETING |
UGPM |
$
5,805,490.08 |
$
6,286,649.16 |
$
6,499,274.79 |
$
6,514,029.04 |
$
6,586,836.35 |
$
8,172,154.35 |
$
6,524,700.52 |
$
6,032,106.84 |
$
7,844,470.67 |
$
6,431,183.08 |
$
7,660,752.96 |
$
6,853,455.50 |
$
81,211,103.34 |
|
|
|
WESTERN FARMERS ENERGY SERVICES |
WFES |
$
4,657,974.04 |
$
3,604,308.27 |
$
4,768,669.81 |
$
4,733,982.44 |
$
4,795,614.91 |
$
4,761,733.34 |
$
4,726,666.50 |
$
5,527,371.27 |
$
8,406,223.38 |
$
6,526,515.15 |
$
7,023,076.70 |
$
6,969,179.95 |
$
66,501,315.76 |
|
|
|
WESTAR ENERGY-GENERATION SERVICES |
WRGS |
$
20,330,619.97 |
$
22,455,984.24 |
$
22,561,547.88 |
$
22,488,544.46 |
$
22,599,087.28 |
$
14,621,840.19 |
$
20,889,449.44 |
$
21,246,251.87 |
$
21,417,385.24 |
$
21,410,212.01 |
$
21,096,591.61 |
$
21,234,432.67 |
$
252,351,946.86 |
|
|
Grand Total |
|
$ 153,260,981.58 |
$ 165,120,085.34 |
$ 166,056,857.66 |
$ 177,866,071.69 |
$ 171,215,455.84 |
$ 162,888,011.64 |
$ 172,918,837.58 |
$ 175,180,639.26 |
$ 184,414,233.06 |
$ 176,299,694.65 |
$ 178,294,362.26 |
$
179,659,048.34 |
$ 2,063,174,278.90 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|