2000 Feasibility Studies
The following Generator Interconnection Studies have been requested.

Study Number Date Requested Purpose of Study Remarks Report
GEN-2000-003  July 13, 2000 Request to interconnect 280MW on the SPS transmission system Withdrawn (Completed Feasibility Study - Sep. 2000) Download
GEN-2000-004 August 16, 2000 Request to interconnect 800MW on the AEP West transmission system Withdrawn (Completed Feasibility Study - Oct. 2000) Download
GEN-2000-009 October 02, 2000 Request to interconnect 500MW on the AEP West transmission system Withdrawn (Feasibility Study complete - Oct. 2000) Download
GEN-2000-010 October 25, 2000 Request to interconnect 400MW on the AEP West transmission system Withdrawn (Feasibility Study complete January 2001) Download