OASIS Apps
- Curtailment Viewer
- DC Tie Viewer
- Price Discounts
- Price Matrix
- Transmission Load Relief
- SPP OASIS Archive Map
> SPP OASIS Archive Page
> Market System Status
> Member Related Postings
> FERC890 Items
- Studies Postings
|
|
|
|
2014 Facility Studies |
The following Generator Interconnection Studies have been requested.
|
Study Number |
Date Requested |
Purpose of Study |
Remarks |
Report |
ASGI-2014-001 |
September 05, 2014 |
Interconnect 2.5 MW to a substation in the SPS Transmission System |
Posted 11/14/2014 |
Download |
GEN-2014-001 |
September 29, 2014 |
Interconnect 200.6 MW to the WERE Transmission System (queued as IFS-2014-001-08) |
Posted 1/9/2015 |
Download |
GEN-2014-001 |
September 29, 2014 |
Interconnect 200.6 MW to the WERE Transmission System (queued as IFS-2014-001-08) |
Reposted 3/5/2015 |
Download |
GEN-2014-002 |
September 08, 2014 |
Interconnect 10.53 MW to the OKGE Transmission System (queued as IFS-2014-001-02 ) |
Posted 12/9/2014 |
Download |
GEN-2014-003 |
September 08, 2014 |
Interconnect 15.84 MW to the OKGE Transmission System (queued as IFS-2014-001-03) |
Posted 1/13/2015 |
Download |
GEN-2014-004 |
September 05, 2014 |
Interconnect 3.96 MW to the NPPD Transmission System (queued as IFS-2014-001-04) |
Posted 2/3/2015 |
Download |
GEN-2014-005 |
September 08, 2014 |
Interconnect 5.7 MW to the OKGE Transmission System (queued as IFS-2014-001-05) |
Posted 1/12/2015 |
Download |
GEN-2014-012 |
August 29, 2014 |
Interconnect 186 MW Summer/225 MW Winter to the SPS Transmission System (queued as IFS-2014-001-06) |
Posted 3/20/2015 |
Download |
GEN-2014-013 |
September 05, 2014 |
Interconnect 73.5 MW to the NPPD Transmission System (queued as IFS-2014-001-07) |
Posted 2/9/2015 |
Download |
Please send your requests to GIStudies@spp.org
If you have any questions, please submit a ticket on RMS.
|
|