2014 Impact Studies
The following Generator Interconnection Studies have been requested.

Study Number Date Requested Purpose of Study Remarks Report
DISIS-2014-001 March 31, 2014 Definitive Interconnection System Impact Study DISIS-2014-001 Posted 7/31/2014 Download
DISIS-2014-001-1 March 31, 2014 Definitive Interconnection System Impact Study DISIS-2014-001-1 Posted 10/31/2014 Download
DISIS-2014-002 September 30, 2014 Definitive Interconnection System Impact Study DISIS-2014-002 Posted 1/30/2015 Download
GEN-2014-001 March 12, 2015 Impact Restudy for Generator Modification (Turbine Change) Posted 4/21/2015 Download
GEN-2014-013 September 05, 2014 Limited Operation Impact Study for Generation Interconnection Request Posted 2/17/2015 Download
GEN-2014-013 February 05, 2015 Impact Restudy for Generator Modification (Turbine Change) Posted 2/27/2015 Download
GEN-2014-022 September 05, 2014 Interim Availability Interconnection System Impact Study for Generation Interconnection Request Posted 12/3/2014 Download
GEN-2014-025 September 19, 2014 Interim Availibility Interconnection System Impact Study for Generation Interconnection Request Posted 12/4/2014 Download
PISIS-2014-001 March 31, 2014 Preliminary Interconnection System Impact Study PISIS-2014-001 Posted 8/29/2014 Download
PISIS-2014-002 September 30, 2014 Preliminary Interconnection System Impact Study PISIS-2014-002 Posted 2/27/2015 Download