| 2013 Impact Studies | |
| The following Generator Interconnection Studies have been requested. | |
| Study Number | Date Requested | Purpose of Study | Remarks | Report |
|---|---|---|---|---|
| January 01, 1900 | ||||
| ASGI-2013-001 LOIS | February 15, 2013 | Limited Operation Impact Study for Generation Interconnection Request | Posted 7/31/2013 | Download |
| ASGI-2013-004 | March 07, 2014 | Modification Request to interconnect 36.6 MW on the SUNC transmission system | Posted 4/10/2014 | Download |
| ASGI-2013-004 LOIS | November 06, 2013 | Limited Operation Impact Study for Generation Interconnection Study | Posted 12/9/2013 | Download |
| DISIS-2013-001 | March 31, 2013 | Definitive Interconnection System Impact Study DISIS-2013-001 | Posted 7/31/2013 | Download |
| DISIS-2013-001-1 | March 31, 2013 | Definitive Interconnection System Impact ReStudy DISIS-2013-001-1 | Posted 8/30/2013 | Download |
| DISIS-2013-001-2 | March 31, 2013 | Definitive Interconnection System Impact ReStudy DISIS-2013-001-2 | Posted 1/31/2014 | Download |
| DISIS-2013-001-3 | March 31, 2013 | Definitive Interconnection System Impact ReStudy DISIS-2013-001-3 | Posted 7/30/2014 | Download |
| DISIS-2013-001-4 | March 31, 2013 | Definitive Interconnection System Impact Restudy DISIS-2013-001-4 | Posted 10/23/2014 | Download |
| DISIS-2013-002 | September 30, 2013 | Definitive Interconnection System Impact Study DISIS-2013-002 | Posted 1/31/2014 | Download |
| DISIS-2013-002-1 | September 30, 2013 | Definitive Interconnection System Impact Restudy DISIS-2013-002-1 | Posted 7/31/2014 | Download |
| DISIS-2013-002-2 | September 30, 2013 | Definitive Interconnection System Impact Restudy DISIS-2013-002-2 | Posted 10/23/2014 | Download |
| GEN-2013-002 | September 27, 2013 | Limited Operation Impact Study for Generation Interconnection Request | Posted 9/25/2014 | Download |
| GEN-2013-008 | September 27, 2013 | Limited Operation Impact Study for Generation Interconnection Request | Posted 10/8/2013 | Download |
| GEN-2013-014 | October 13, 2014 | Modification Request to interconnect 25.5 MW on the NPPD transmission system | Posted 11/19/2014 | Download |
| GEN-2013-019 | September 27, 2013 | Limited Operation Impact Study for Generation Interconnection Request | Posted 9/25/2014 | Download |
| GEN-2013-029 | January 14, 2015 | Impact Restudy for Generator Modification (Turbine Change) | Posted 2/27/2015 | Download |
| GEN-2013-032 | September 27, 2013 | Limited Operation Impact Study for Generation Interconnection Request | Posted 4/8/15 | Download |
| PISIS-2013-001 | June 30, 2013 | Preliminary Interconnection System Impact Study PISIS-2013-001 | Posted 8/30/2013 | Download |
| PISIS-2013-002 | June 30, 2013 | Preliminary Interconnection System Impact Study | Posted 2/28/2014 | Download |
|