GI Active Requests

Last Updated: 4/23/2024    Download data as CSV

Generation Interconnection NumberIFS Queue NumberCurrent ClusterCluster GroupNearest Town or CountyStateTO at POIIn-Service Date (proposed) Commercial Operation DateCessation DateOriginal Generator Commercial Op. DateCapacity (MW)MAX Summer MWMAX Winter MWService TypeRequested Maximum Injection Capability (MW)Requested Network Resource Deliverability (MW)Nameplate CapacityGeneration TypeFuel Type Substation or LineRequest ReceivedDate WithdrawnStatusCause of DelayAssociated StudiesFacility ReportExecuted GIA
GEN-2022-001DISIS-2022-00104 SOUTHEASTRogersOK9/23/202512/31/2025  100100100ER/NR000Battery/StorageElm Street - Shane Testing12/30/2021 WITHDRAWN / DEFICIENT   
GEN-2021-SR9TEST DATASurplus TEST01 NORTHKansas City TEST DATAMOKCPL12/13/202212/1/202212/7/202212/7/202299999999ER/NR test000Battery/StorageTEST DATAHawthorn Power Plant -DT Testing 8/24/202112/20/2022FEASIBILITY STUDY STAGETESTViewViewView
GEN-2021-SR8Surplus03 CENTRALHarperKSWERE11/1/2023   424242ER000SolarViola 345kV5/13/2021 None   
GEN-2021-108DISIS-2021-00102 NEBRASKACassNE7/31/202312/31/2023  182.25182.25182.25ER/NR000SolarOPPD 345KV Cass County Substation5/20/2021 DISIS STAGE   
GEN-2021-107DISIS-2021-00103 CENTRALPottawatomieKS7/31/202312/31/2023  201.6201.6201.6ER/NR000Battery/StorageEvergy 345kV Jeffrey Energy Center5/20/2021 DISIS STAGE   
GEN-2021-106DISIS-2021-00102 NEBRASKAThayerNE7/31/202312/31/2023  102.06102.06102.06ER/NR000SolarNPPD 161kV Hebron Substation5/20/2021 DISIS STAGE   
GEN-2021-105DISIS-2021-00102 NEBRASKALincolnNE9/5/202612/1/2026  200200200ER/NR000SolarLine side tap using three breaker ring bus on 230kV Feeder from Gerald Gentleman to North Platte5/26/2021 DISIS STAGE   
GEN-2021-104DISIS-2021-00104 SOUTHEASTBossierLA9/5/202612/1/2026  100100100ER/NR000SolarDirect Injection at 138kV buss at Red Point Substation5/26/2021 DISIS STAGE   
GEN-2021-103DISIS-2021-00103 CENTRALJohnsonKS8/1/20259/1/2025  150150150ER/NR000Battery/StorageEvergy's Waverly Substation 115kV bus5/25/2021 DISIS STAGE   
GEN-2021-102DISIS-2021-00103 CENTRALDouglasKS8/1/20259/1/2025  808080ER/NR000Battery/StorageEvergy's Midland Substation 115kV bus5/25/2021 DISIS STAGE   
GEN-2021-101DISIS-2021-00103 CENTRALDouglasKS8/1/20259/1/2025  159159159ER/NR000SolarPOI is Evergy's Midland Station Northeast of Lawrence, KS5/25/2021 DISIS STAGE   
GEN-2021-100DISIS-2021-00102 NEBRASKAMercerNDBEPC9/15/202612/1/2026  504030ER/NR000HybridYourtown 345kV Substation5/24/2021 DISIS STAGE   
GEN-2021-099DISIS-2021-00104 SOUTHEASTEllisOK11/1/20241/1/2025  250260.4260.4ER/NR000WindBobcat 345 kV4/30/2021 DISIS STAGE   
GEN-2021-098DISIS-2021-00104 SOUTHEASTDeweyOK11/1/202512/31/2025  300300300ER/NR000WindDewey District 138 kV Substation5/24/2021 DISIS STAGE   
GEN-2021-097DISIS-2021-00105 SOUTHWESTElida NM11/1/202512/21/2025  300300300ER/NR000WindHisel 230 kV Substation5/24/2021 DISIS STAGE   
GEN-2021-096DISIS-2021-00103 CENTRALCoffeyKS11/1/20235/1/2024  503.5503.5503.5ER/NR000SolarWolf Creek - Benton 345 kV4/29/2021 DISIS STAGE   
GEN-2021-095DISIS-2021-00101 NORTHMercerNDBEPC8/1/20254/1/2026  446.5446.5446.5ER000ThermalCombustion TurbineAVS 345kV substation4/30/2021 DISIS STAGE   
GEN-2021-094DISIS-2021-00101 NORTHMercerNDBEPC8/1/20244/1/2025  446.5446.5446.5ER000ThermalCombustion TurbineAVS 345kV Substation4/30/2021 DISIS STAGE   
GEN-2021-093DISIS-2021-00104 SOUTHEASTOklahoma OK6/1/20236/1/2025  109109132ER/NR000ThermalGas TurbineTinker4/30/2021 DISIS STAGE   
GEN-2021-092DISIS-2021-00105 SOUTHWESTHansfordTX1/15/20263/15/2026  100100100ER/NR000Battery/StorageXcel Hansford 115kV substation4/30/2021 DISIS STAGE   
GEN-2021-091DISIS-2021-00104 SOUTHEASTPontotocOK10/1/202512/31/2025  150150150ER/NR000HybridSolarOG&E's Blue River 138kV Substation4/29/2021 DISIS STAGE   
GEN-2021-090DISIS-2021-00105 SOUTHWESTYoakumTX6/15/20227/15/2022  400400400ER/NR000SolarYoakum 345kV Substation4/30/2021 DISIS STAGE   
GEN-2021-089DISIS-2021-00105 SOUTHWESTHockleyTX 12/31/2026  400400400ER/NR000HybridSolarTuco-Yoakum-Hobbs 345kV4/29/2021 DISIS STAGE   
GEN-2021-088DISIS-2021-00104 SOUTHEASTClevelandOK9/23/202412/24/2024  100100100ER/NR000Battery/Storage138 kV Canadian SW Substation4/29/2021 DISIS STAGE   
GEN-2021-087DISIS-2021-00103 CENTRALSewardKS10/15/202712/31/2027  185185185ER/NR000HybridSolarWalkemeyer - North Cimarron 115kV4/29/2021 DISIS STAGE   
GEN-2021-086DISIS-2021-00104 SOUTHEASTHowardAR10/15/202712/31/2027  165165165ER/NR000HybridSolarOkay - Turk 138kV4/29/2021 DISIS STAGE   
GEN-2021-085DISIS-2021-00103 CENTRALFordKS12/15/202712/31/2027  200200200ER/NR000HybridSolarCrooked Creek - Fort Dodge 115kV4/29/2021 DISIS STAGE   
GEN-2021-084DISIS-2021-00103 CENTRALKearneyKS10/15/202712/31/2027  200200200ER/NR000HybridSolarWilliamson - Fletcher 115kV4/29/2021 DISIS STAGE   
GEN-2021-083DISIS-2021-00105 SOUTHWESTChavesNM7/1/20249/1/2024  100100100ER/NR000SolarSPP / Central Valley Electric Cooperative (CV) 69 kV transmission line4/26/2021 DISIS STAGE   
GEN-2021-082DISIS-2021-00105 SOUTHWESTLeaNM7/1/20249/1/2024  808080ER/NR000SolarLE 69 kV Lewis substation4/23/2021 DISIS STAGE   
GEN-2021-081DISIS-2021-00105 SOUTHWESTLeaNM4/1/20246/1/2024  555555ER/NR000SolarSPP / Lea County Electric Cooperative (LE) 69 kV transmission line4/26/2021 DISIS STAGE   
GEN-2021-080DISIS-2021-00105 SOUTHWESTLeaNM7/1/20249/1/2024  100100100ER/NR000SolarSPP / Lea County Electric Cooperative (LE) 69 kV4/26/2021 DISIS STAGE   
GEN-2021-079DISIS-2021-00104 SOUTHEASTDelaware (OK) / Benton (AR)OK/AR7/31/20238/31/2023  140140140ER/NR000SolarFlint Creek to Tonnece 345 kV4/30/2021 DISIS STAGE   
GEN-2021-078DISIS-2021-00103 CENTRALFinneyKS10/15/202712/31/2027  160160160ER/NR000HybridSolarEPC - 115kV4/29/2021 DISIS STAGE   
GEN-2021-077DISIS-2021-00103 CENTRALPettisMO7/1/20258/1/2025  150150150ER000SolarWindsor to AEC Sedalia 161 kV4/30/2021 DISIS STAGE   
GEN-2021-076DISIS-2021-00103 CENTRALEllisKS7/31/202312/31/2023  113113113ER/NR000SolarMidwest Energy 161kV Post Rock Substation5/13/2021 DISIS STAGE   
GEN-2021-075DISIS-2021-00103 CENTRALProwersCO9/1/202512/31/2025  300300300ER/NR000WindFinney - Lamar 345 kV5/19/2021 DISIS STAGE   
GEN-2021-074DISIS-2021-00103 CENTRALProwersCO9/1/202512/31/2025  500500500ER/NR000SolarFinney - Lamar 345 kV5/19/2021 DISIS STAGE   
GEN-2021-073DISIS-2021-00102 NEBRASKALincolnNE6/1/202412/1/2024  240240240ER/NR000Solar345 kV BUS at Gerald Gentleman Substation5/19/2021 DISIS STAGE   
GEN-2021-072DISIS-2021-00101 NORTHMercerNDBEPC6/1/202412/1/2024  600600600ER/NR000Solar345kV Transmission Line from Antelope Valley to Leland Olds Substation5/19/2021 DISIS STAGE   
GEN-2021-071DISIS-2021-00104 SOUTHEASTNobleOK9/1/202512/1/2025  403.2403.2403.2ER000WindOKGE Spring Creek – Sooner 345kV4/26/2021 DISIS STAGE   
GEN-2021-070DISIS-2021-00103 CENTRALHodgeman and FordKS8/1/202711/1/2027  504504504ER000WindSUNC Spearville - Holcomb 345kV4/26/2021 DISIS STAGE   
GEN-2021-069DISIS-2021-00103 CENTRALHodgeman and FordKS8/1/202711/1/2027  249.6249.6249.6ER000WindSUNC Spearville - Holcomb 345kV4/26/2021 DISIS STAGE   
GEN-2021-068DISIS-2021-00103 CENTRALHodgeman and FordKS9/1/202512/1/2025  249.6249.6249.6ER000WindSUNC Spearville - Holcomb 345kV4/26/2021 DISIS STAGE   
GEN-2021-067DISIS-2021-00104 SOUTHEASTDelawareOK2/15/20256/1/2025  100100100ER/NR000HybridSolarTap Grove - Jay 138kV4/28/2021 DISIS STAGE   
GEN-2021-066DISIS-2021-00104 SOUTHEASTPittsburgOK2/15/20256/1/2025  150150150ER/NR000HybridSolarMcAlester WFEC 138 kV4/28/2021 DISIS STAGE   
GEN-2021-065DISIS-2021-00104 SOUTHEASTPittsburgOK2/15/20256/1/2025  200200200ER/NR000HybridSolarTalawanda to C-River 138kV4/28/2021 DISIS STAGE   
GEN-2021-064DISIS-2021-00104 SOUTHEASTCaddoOK2/15/20256/1/2025  100100100ER/NR000HybridSolarCarnegie South 138kV4/28/2021 DISIS STAGE   
GEN-2021-063DISIS-2021-00104 SOUTHEASTMcCurtainOK2/15/20256/1/2025  200200200ER/NR000HybridSolarCraig JCT 138kV4/28/2021 DISIS STAGE   
GEN-2021-062DISIS-2021-00102 NEBRASKALincoln NE 12/31/2026  108110110ER000SolarCanaday 230 kV Substation4/29/2021 DISIS STAGE   
GEN-2021-061DISIS-2021-00102 NEBRASKAJohnson and Gage KS 12/31/2027  100100100ER000WindBeatrice 115 kV substation4/29/2021 DISIS STAGE   
GEN-2021-060DISIS-2021-00103 CENTRALBarberKS 12/31/2026  300300300ER000SolarPony Meadows 138 kV substation4/29/2021 DISIS STAGE   
GEN-2021-059DISIS-2021-00103 CENTRALNemahaKS 4/30/2021  400400400ER000WindKelley 161 kV substation4/29/2021 DISIS STAGE   
GEN-2021-058DISIS-2021-00101 NORTHMadisonNENPPD 12/31/2027  300300300ER000WindHolt 345kV substation4/29/2021 DISIS STAGE   
GEN-2021-057DISIS-2021-00102 NEBRASKAAntelopeNE 12/31/2027  300300300ER000WindAntelope 345kV substation4/29/2021 DISIS STAGE   
GEN-2021-056DISIS-2021-00104 SOUTHEASTTexas CountyTX 12/31/2027  100010001000ER000WindWelsh 345kV Substation4/29/2021 DISIS STAGE   
GEN-2021-055DISIS-2021-00104 SOUTHEASTRed RiverTX 12/31/2027  250250250ER000SolarWelsh 345kV Substation4/29/2021 DISIS STAGE   
GEN-2021-054DISIS-2021-00104 SOUTHEASTRed RiverTX 12/31/2027  250250250ER000SolarWelsh 345kV Substation4/29/2021 DISIS STAGE   
GEN-2021-053DISIS-2021-00104 SOUTHEASTRed RiverTX 12/31/2027  500500500ER000SolarWelsh 345kV Substation4/29/2021 DISIS STAGE   
GEN-2021-052DISIS-2021-00104 SOUTHEASTMuskogeeOK 12/31/2025  757575ER000Battery/StoragePecan Creek 345kV substation4/29/2021 DISIS STAGE   
GEN-2021-051DISIS-2021-00103 CENTRALHenryMO7/31/202512/31/2025  757575ER/NR000Battery/Storage161kV Stilwell-Clinton Line4/30/2021 DISIS STAGE   
GEN-2021-050DISIS-2021-00103 CENTRALHenryMO7/31/202512/31/2025  200200200ER/NR000Solar161kV Stilwell-Clinton Line4/30/2021 DISIS STAGE   
GEN-2021-049DISIS-2021-00102 NEBRASKALancasterNE7/31/202512/31/2025  250250250ER/NR000SolarWagener 115kV Substation4/30/2021 DISIS STAGE   
GEN-2021-048DISIS-2021-00102 NEBRASKALancasterNE7/31/202512/31/2025  757575ER/NR000Battery/StorageWagener 115kV Substation4/30/2021 DISIS STAGE   
GEN-2021-047DISIS-2021-00104 SOUTHEASTMayesOK3/1/202610/1/2026  250250250ER000SolarTulsa North (Bus #509852) - Grand River Energy Center Tap (Bus #512865) #345 kV Line4/29/2021 DISIS STAGE   
GEN-2021-046DISIS-2021-00103 CENTRALProwers, KiowaCO7/1/202512/31/2025  400406.02406.02ER/NR000WindTap 345 kV line between Lamar and Finney4/28/2021 DISIS STAGE   
GEN-2021-045DISIS-2021-00103 CENTRALSherman, WallaceKS7/1/202512/31/2025  300303303ER/NR000WindSunflower Electric Power Corp's 345 kV Mingo substation4/28/2021 DISIS STAGE   
GEN-2021-044DISIS-2021-00102 NEBRASKADundyNE7/1/202512/31/2025  300303303ER/NR000WindNebraska Public Power District's (NPPD) 345 kV Red Willow substation4/28/2021 DISIS STAGE   
GEN-2021-043DISIS-2021-00102 NEBRASKALancasterNE3/31/20246/1/2024  250250250ER/NR000Battery/Storage8000 SW 12th (Rokeby) Station, 115kV Bus4/30/2021 DISIS STAGE   
GEN-2021-042DISIS-2021-00103 CENTRALJackson MO3/31/20236/1/2023  50100100ER/NR000Battery/StorageIndependence Power & Light, Blue Valley Substation, 161kV Bus4/30/2021 DISIS STAGE   
GEN-2021-041DISIS-2021-00104 SOUTHEASTCanadianOK3/31/20246/1/2024  100100.657100.657ER/NR000Battery/StorageOKGE 138 kV Mustang (#514861)4/30/2021 DISIS STAGE   
GEN-2021-040DISIS-2021-00102 NEBRASKACassNE3/31/20246/1/2024  200400400ER/NR000Battery/StorageOPPD District, Cass County Power Plant Substation, 345kV Bus4/30/2021 DISIS STAGE   
GEN-2021-039DISIS-2021-00102 NEBRASKACassNE3/31/20236/1/2023  100200200ER/NR000Battery/StorageOPPD District, North Omaha Power Plant Substation, 161kV Bus (1211 Substation)4/30/2021 DISIS STAGE   
GEN-2021-038DISIS-2021-00104 SOUTHEASTTitusTX3/31/20246/1/2024  200201.32201.32ER/NR000Battery/StorageAEP 345 kV Welsh (#508359) Substation4/30/2021 DISIS STAGE   
GEN-2021-037DISIS-2021-00102 NEBRASKASalineNE7/31/202312/31/2023  244.22244.22244.22ER/NR000SolarNPPD 161kV Sheldon Substation5/14/2021 DISIS STAGE   
GEN-2021-036DISIS-2021-00104 SOUTHEASTLittle RiverAR7/31/202312/31/2023  204.12204.12204.12ER/NR000SolarTap Southwestern Electric Power Co. Craig to Patterson Transmission Line5/14/2021 DISIS STAGE   
GEN-2021-035DISIS-2021-00103 CENTRALGrantKS7/31/202312/31/2023  113113113ER/NR000SolarTap Sunflower Santana 161kV Transmission Line5/14/2021 DISIS STAGE   
GEN-2021-034DISIS-2021-00102 NEBRASKADawsonNE7/31/202312/31/2023  113113113ER/NR000SolarNPPD 230KV Canaday Substation5/13/2021 DISIS STAGE   
GEN-2021-033DISIS-2021-00104 SOUTHEASTFranklinAR7/31/202312/31/2023  204.12204.12204.12ER/NR000Solar161kV Branch substation5/14/2021 DISIS STAGE   
GEN-2021-032DISIS-2021-00104 SOUTHEASTChoctawOK7/31/202312/31/2023  255.15255.15255.15ER/NR000SolarWestern Farmers 345kV Hugo Substation5/14/2021 DISIS STAGE   
GEN-2021-031DISIS-2021-00104 SOUTHEASTChoctawOK7/31/202312/31/2023  201.6201.6201.6ER/NR000Battery/StorageWestern Farmers 345kV Hugo Substation5/14/2021 DISIS STAGE   
GEN-2021-030DISIS-2021-00103 CENTRALLinn KS and Bates MOKS, MO7/31/202312/31/2023  510.3510.3510.3ER/NR000SolarEvergy 345kV La Cygne Substation5/14/2021 DISIS STAGE   
GEN-2021-029DISIS-2021-00103 CENTRALLinn KS and Bates MOKS, MO7/31/202312/31/2023  253.2253.8253.8ER/NR000Battery/StorageEvergy 345kV La Cygne Substation5/14/2021 DISIS STAGE   
GEN-2021-028DISIS-2021-00104 SOUTHEASTWoodwardOK7/31/202312/31/2023  204.12204.12204.12ER/NR000SolarWestern Farmers 161 Mooreland Substation5/14/2021 DISIS STAGE   
GEN-2021-027DISIS-2021-00102 NEBRASKAGageNE7/31/202312/31/2023  102.06102.06102.06ER/NR000SolarNPPD 161kV Sheldon Substation5/14/2021 DISIS STAGE   
GEN-2021-026DISIS-2021-00103 CENTRALNewtonMO7/31/202312/31/2023  204.12204.12204.12ER/NR000SolarTap SWPA 161kV Springfield to La Russel Transmission Line5/14/2021 DISIS STAGE   
GEN-2021-025DISIS-2021-00104 SOUTHEASTWoodwardOK7/31/20237/31/2023  203.04203.04203.04ER/NR000WindWestern Farmers 161kV Mooreland Substation5/14/2021 DISIS STAGE   
GEN-2021-024DISIS-2021-00101 NORTHLaMoureNDWAPA7/31/202312/31/2023  203.04203.04203.04ER/NR000WindWAPA 230kV Jamestown Substation5/14/2021 DISIS STAGE   
GEN-2021-023DISIS-2021-00103 CENTRALSumnerKS7/31/202312/31/2023  306.18306.18306.18ER/NR000Solar138kV Wild Plains Station5/14/2021 DISIS STAGE   
GEN-2021-022DISIS-2021-00104 SOUTHEASTMuskogeeOK9/1/202612/31/2026  470470470ER000SolarNortheastern 345kV Substation4/20/2021 DISIS STAGE   
GEN-2021-021DISIS-2021-00104 SOUTHEASTLemar and Red RiverTX9/1/202612/31/2026  450450450ER000SolarHugo 138kV Substation4/20/2021 DISIS STAGE   
GEN-2021-020DISIS-2021-00105 SOUTHWESTLea CountyNM9/15/202312/15/2023  747474ER/NR000SolarTapping 345 kV line between Potash Junction and Roadrunner5/6/2021 DISIS STAGE   
GEN-2021-019DISIS-2021-00104 SOUTHEASTNobleOK4/1/202712/1/2027  74.991.291.2ER/NR000Battery/StorageSooner 345 kV4/30/2021 DISIS STAGE   
GEN-2021-018DISIS-2021-00104 SOUTHEASTNobleOK4/1/202712/1/2027  231273.6273.6ER/NR000Battery/StorageSooner 345 kV4/30/2021 DISIS STAGE   
GEN-2021-017DISIS-2021-00101 NORTHMcIntoshNDBEPC4/1/202512/1/2025  74.991.291.2ER/NR000Battery/StorageTap Leland Olds – Groton 345 kV4/30/2021 DISIS STAGE   
GEN-2021-016DISIS-2021-00101 NORTHMcIntoshNDBEPC4/1/202512/1/2025  250252252ER/NR000WindTap Leland Olds – Groton 345 kV4/30/2021 DISIS STAGE   
GEN-2021-015DISIS-2021-00103 CENTRALGrant, Haskell, FinneyKS4/1/202712/1/2027  74.991.291.2ER/NR000Battery/StorageFinney 345 kV4/30/2021 DISIS STAGE   
GEN-2021-014DISIS-2021-00103 CENTRALGrant, Haskell, FinneyKS4/1/202712/1/2027  231273.6273.6ER/NR000Battery/StorageFinney 345 kV4/30/2021 DISIS STAGE   
GEN-2021-013DISIS-2021-00104 SOUTHEASTFranklinTX11/15/20237/15/2024  74.991.291.2ER/NR000Battery/StorageChapel Hill 138kV4/30/2021 DISIS STAGE   
GEN-2021-012DISIS-2021-00104 SOUTHEASTFranklinTX11/15/20237/15/2024  225232.32232.32ER/NR000SolarChapel Hill 138kV4/30/2021 DISIS STAGE   
GEN-2021-011DISIS-2021-00101 NORTHWilliams NDBEPC4/1/202712/1/2027  74.991.291.2ER/NR000Battery/StorageWheelock 115 kV4/30/2021 DISIS STAGE   
GEN-2021-010DISIS-2021-00101 NORTHWilliams CountyNDBEPC4/1/202712/1/2027  231273.6273.6ER/NR000Battery/StorageWheelock 115 kV4/30/2021 DISIS STAGE   
GEN-2021-009DISIS-2021-00101 NORTHBeadleSDWAPA11/1/20253/1/2026  225225225ER/NR000Battery/StorageCarpenter 230kV substation in Clark county, South Dakota5/11/2021 DISIS STAGE   
GEN-2021-008DISIS-2021-00101 NORTHMcKenzieNDBEPC5/9/202612/1/2026  270270270ER/NR000Solar345kV Bus at BEPC Patent Gate Substation, McKenzie County, ND5/10/2021 DISIS STAGE   
GEN-2021-007DISIS-2021-00102 NEBRASKAKnox and CedarNE9/30/202512/31/2025  600600600ER/NR000Wind345kV bus of Turtle Creek Substation5/10/2021 DISIS STAGE   
GEN-2021-006DISIS-2021-00103 CENTRALLabetteKS10/1/20242/1/2025  300300300ER/NR000Battery/StorageNeosho 345kV substation in Labette County, KS5/7/2021 DISIS STAGE   
GEN-2021-005DISIS-2021-00103 CENTRALSalineKS11/1/20233/1/2024  350350350ER/NR000Battery/StorageSummit 230kV substation in Saline County, KS5/7/2021 DISIS STAGE   
GEN-2021-004DISIS-2021-00104 SOUTHEASTCarterOKtbd9/5/202612/1/2026  250250250ER/NR000SolarSunnyside to Poolville 138kV Feeder4/30/2021 DISIS STAGE   
GEN-2021-003DISIS-2021-00101 NORTHRichlandMTWAPA10/15/202312/1/2023  75.575.575.5ER/NR000SolarFairview 115kV Substation12/11/2020 DISIS STAGE   
GEN-2021-002DISIS-2021-00104 SOUTHEASTOkeeneOK9/25/202412/24/2024  100100100ER/NR000Battery/Storage138kV Okeene Substation12/29/2020 DISIS STAGE   
GEN-2021-001DISIS-2021-00104 SOUTHEASTDurantOK9/25/202412/24/2024  100100100ER/NR000Battery/Storage138kV Brown Substation12/29/2020 DISIS STAGE   
GEN-2020-SR3Surplus04 SOUTHEASTJohnstonOKOKGE9/1/20219/1/2021  200200200ER/NR000Battery/StorageHugo-Sunnyside 345 kV8/4/2020 IA PENDING   
GEN-2020-SR2Surplus04 SOUTHEASTJohnstonOKOKGE12/1/202112/1/2021  100100100ER/NR000Battery/StorageBrown 138kV8/4/2020 IA PENDING   
GEN-2020-SR1Surplus04 SOUTHEASTBeckhamOKWFEC12/1/202212/1/2022  404040ER000Battery/StorageErick 138kV Substation8/4/2020 IA PENDING   
GEN-2020-094DISIS-2020-00102 NEBRASKASyracuseNE4/2/20235/1/2023  250250250ER/NR000SolarNeb. City - 103rd & Rokeby 345 kV4/30/2020 DISIS STAGE   
GEN-2020-093DISIS-2020-00101 NORTHPotter CountySDBEPC11/14/202512/1/2024  150150150ER/NR000SolarWhitlock Substation 230 kV4/30/2020 DISIS STAGE   
GEN-2020-092DISIS-2020-00104 SOUTHEASTMayes CountyOK11/2/202512/1/2024  100100100ER/NR000SolarPryor Junction Substation 115 kV4/30/2020 DISIS STAGE   
GEN-2020-091DISIS-2020-00101 NORTHAlexanderNDBEPC11/2/202512/1/2025  150150150ER/NR000SolarPatent Gate Substation 115 kV4/30/2020 DISIS STAGE   
GEN-2020-090DISIS-2020-00103 CENTRALLabette CoKS11/1/202112/1/2021  204.3204.3204.3ER/NR000SolarNeosho 345kV Substation4/27/2020 DISIS STAGE   
GEN-2020-089DISIS-2020-00103 CENTRALLabette CoKS11/1/202112/1/2021  104104104ER/NR000SolarNeosho 345kV Substation4/27/2020 DISIS STAGE   
GEN-2020-088DISIS-2020-00103 CENTRALJasperMO11/30/202212/31/2022  150150150ER/NR000SolarLa Russel 161 kV Substation4/30/2020 DISIS STAGE   
GEN-2020-087DISIS-2020-00104 SOUTHEASTComancheOK5/1/20236/1/2023  500500500ER/NR000SolarCimmarron to Lawton 345 kV Line4/23/2020 DISIS STAGE   
GEN-2020-086DISIS-2020-00103 CENTRALEl DoradoKS11/30/202212/31/2022  500500500ER/NR000SolarBenton to Wolf Creek 345 kV Line4/23/2020 DISIS STAGE   
GEN-2020-085DISIS-2020-00104 SOUTHEASTWilsonOKAEPW4/2/20235/1/2023  500500500ER/NR000SolarLawton to Sunnyside 345 kV Line4/23/2020 DISIS STAGE   
GEN-2020-084DISIS-2020-00102 NEBRASKATekamahNE4/1/20225/1/2022  350350350ER/NR000SolarRaun - Fort Calhoun 345 kV4/30/2020 DISIS STAGE   
GEN-2020-083DISIS-2020-00101 NORTHFairviewMTWAPA10/20/202311/21/2023  74.574.574.5ER/NR000SolarFairview 115kV Substation4/30/2020 DISIS STAGE   
GEN-2020-082DISIS-2020-00103 CENTRALSewardKS3/30/20234/30/2023  202020ER/NR000SolarLiberal 115 kV Substation4/30/2020 DISIS STAGE   
GEN-2020-081DISIS-2020-00104 SOUTHEASTTenaskaTXAEPW5/1/20226/1/2022  200200200ER/NR000Battery/StorageMt. Enterprise 345 kV substation4/30/2020 DISIS STAGE   
GEN-2020-080DISIS-2020-00105 SOUTHWESTElk CityNMSPS5/1/20226/1/2022  200200200ER/NR000Battery/StorageTuco Interchange 345 kV Substation4/30/2020 DISIS STAGE   
GEN-2020-079DISIS-2020-00103 CENTRALJasperMO7/1/20259/30/2025  225225225ER/NR000SolarLa Russell 161 kV substation4/30/2020 DISIS STAGE   
GEN-2020-078DISIS-2020-00102 NEBRASKAWashingtonNEOPPD11/30/202212/31/2022  100100100ER/NR000SolarSubstation 1226 to Substation 1237, 161kV Tap4/30/2020 DISIS STAGE   
GEN-2020-077DISIS-2020-00102 NEBRASKAThayerNE11/30/202312/31/2023  151.2151.2151.2ER/NR000WindNorth Hebron to Fairbury 115 kV4/28/2020 DISIS STAGE   
GEN-2020-076DISIS-2020-00103 CENTRALButlerKS11/30/202212/31/2022  200200200ER/NR000Battery/StorageBenton to Wolf Creek 345 kV Line4/28/2020 DISIS STAGE   
GEN-2020-075DISIS-2020-00104 SOUTHEASTComancheOK5/1/20236/1/2023  200200200ER/NR000Battery/StorageCimmarron to Lawton 345 kV Line4/28/2020 DISIS STAGE   
GEN-2020-074DISIS-2020-00104 SOUTHEASTCarterOKAEPW3/31/20235/1/2023  200200200ER/NR000Battery/StorageLawton to Sunnyside 345 kV Line4/28/2020 DISIS STAGE   
GEN-2020-073DISIS-2020-00103 CENTRALFranklinKS7/1/20258/1/2025  190190190ER/NR000SolarS Ottawa to SE Ottawa 161 kV line4/30/2020 DISIS STAGE   
GEN-2020-072DISIS-2020-00103 CENTRALWindsorMO7/1/20258/1/2025  150150150ER/NR000SolarWindsor to AEC Sedalia 161 kV line4/30/2020 DISIS STAGE   
GEN-2020-071DISIS-2020-00103 CENTRALOsageKS9/30/202410/31/2024  252252252ER/NR000WindSwissvale to Morris 230 KV line4/30/2020 DISIS STAGE   
GEN-2020-070DISIS-2020-00103 CENTRALOsborneKS9/30/202410/31/2024  255255255ER/NR000WindPostrock to Axtell 345 KV line4/30/2020 DISIS STAGE   
GEN-2020-069DISIS-2020-00102 NEBRASKACherryNE11/30/202312/31/2023  52.8552.8552.85ER/NR000WindCody to Valentine 115kV line4/24/2020 DISIS STAGE   
GEN-2020-068DISIS-2020-00105 SOUTHWESTHockleyTXSPS11/1/202412/1/2024  400400400ER/NR000SolarTuco to Yoakum 345kV line4/29/2020 DISIS STAGE   
GEN-2020-067DISIS-2020-00105 SOUTHWESTHockleyTXSPS11/1/202412/1/2024  352.5352.5352.5ER/NR000WindTuco to Yoakum 345kV line4/24/2020 DISIS STAGE   
GEN-2020-066DISIS-2020-00105 SOUTHWESTHockleyTXSPS11/1/202412/1/2024  253.8253.8253.8ER/NR000WindTuco to Yoakum 345kV line4/24/2020 DISIS STAGE   
GEN-2020-065DISIS-2020-00105 SOUTHWESTGainesTX/NM12/1/20255/1/2026  1003912.31003ER000ThermalCombined CycleHobbs-Andrews 345 kV Line4/30/2020 DISIS STAGE   
GEN-2020-064DISIS-2020-00103 CENTRALJoplinMO10/1/202010/31/2020  643664ER/NR000ThermalCT4544 Stateline CC 161kV Substation4/22/2020 DISIS STAGE   
GEN-2020-063DISIS-2020-00105 SOUTHWESTElidaNMRCEC11/1/202312/1/2023  305.8305.8305.8ER/NR000SolarOasis - San Juan Mesa 230 kV Line4/29/2020 DISIS STAGE   
GEN-2020-062DISIS-2020-00105 SOUTHWESTClovisNMRCEC11/1/202312/1/2023  409.8409.8409.8ER/NR000SolarOASIS 230/115 kV Substation4/29/2020 DISIS STAGE   
GEN-2020-061DISIS-2020-00103 CENTRALPleasant HillMO5/1/20215/1/2021  292921ER/NR000ThermalGasPleasant Hill 345/161/69 kV Substation4/28/2020 DISIS STAGE   
GEN-2020-060DISIS-2020-00105 SOUTHWESTLubbockTX5/1/20266/1/2026  200200200ER/NR000Battery/StorageLubbock East Substation 230 kV4/30/2020 DISIS STAGE   
GEN-2020-059DISIS-2020-00105 SOUTHWESTLovingtonNM3/2/20254/1/2025  500500500ER/NR000SolarTuco-Yoakum-Hobbs 345 kV4/29/2020 DISIS STAGE   
GEN-2020-058DISIS-2020-00103 CENTRALGarnerKS11/1/202612/1/2026  433.2433.2433.2ER/NR000SolarCraig-West Gardner 345 kV4/30/2020 DISIS STAGE   
GEN-2020-057DISIS-2020-00103 CENTRALGarnerKS11/1/202612/1/2026  433.2433.2433.2ER/NR000SolarEast Waverly Substation 115 kV4/30/2020 DISIS STAGE   
GEN-2020-056DISIS-2020-00103 CENTRALRussell CountyKSSUNC3/30/20234/30/2023  202020ER/NR000SolarRussell 115 kV Substation4/30/2020 DISIS STAGE   
GEN-2020-055DISIS-2020-00104 SOUTHEASTBowie CountyTX8/1/202312/15/2023  717171ER/NR000Battery/StorageLydia 345 kV Station4/27/2020 DISIS STAGE   
GEN-2020-054DISIS-2020-00104 SOUTHEASTBowie CountyTX8/1/202312/15/2023  298298298ER/NR000SolarLydia 345 kV Station4/27/2020 DISIS STAGE   
GEN-2020-053DISIS-2020-00103 CENTRALNewton CoMO8/1/202312/15/2023  240240240ER/NR000WindMonette-Flint Creek 345 kV4/29/2020 DISIS STAGE   
GEN-2020-052DISIS-2020-00103 CENTRALLabette CoKS8/1/202312/15/2023  251251251ER/NR000WindNeosho-Delware 345 kV4/29/2020 DISIS STAGE   
GEN-2020-051DISIS-2020-00102 NEBRASKASutherlandNE11/30/202312/31/2023  250250250ER/NR000SolarGerald Gentleman Substation 345 kV4/29/2020 DISIS STAGE   
GEN-2020-050DISIS-2020-00102 NEBRASKAOmahaNE4/30/20235/31/2023  56.5256.5256.52ER/NR000ThermalReciprocating EngineSubstation 1211; 161kV4/29/2020 DISIS STAGE   
GEN-2020-049DISIS-2020-00102 NEBRASKAOmahaNE4/30/20235/31/2023  56.5256.5256.52ER/NR000ThermalReciprocating EngineSubstation 1211; 161kV4/29/2020 DISIS STAGE   
GEN-2020-048DISIS-2020-00102 NEBRASKAOmahaNE4/30/20235/31/2023  56.5256.5256.52ER/NR000ThermalReciprocating EngineSubstation 1211; 161kV4/29/2020 DISIS STAGE   
GEN-2020-047DISIS-2020-00102 NEBRASKAOmahaNE4/30/20235/31/2023  56.5256.5256.52ER/NR000ThermalReciprocating EngineSubstation 911; 69 kV4/29/2020 DISIS STAGE   
GEN-2020-046DISIS-2020-00102 NEBRASKADouglas CountyNE4/30/20235/31/2023  56.5256.5256.52ER/NR000ThermalReciprocating EngineBetween Substation 1209 and 1252; 161kV4/29/2020 DISIS STAGE   
GEN-2020-045DISIS-2020-00102 NEBRASKADouglas CountyNE4/30/20235/31/2023  56.5256.5256.52ER/NR000ThermalReciprocating EngineBetween Substation 1209 and 1252; 161kV4/29/2020 DISIS STAGE   
GEN-2020-044DISIS-2020-00102 NEBRASKADouglas CountyNE4/30/20235/31/2023  56.5256.5256.52ER/NR000ThermalReciprocating EngineBetween Substation 1209 and 1252; 161kV4/29/2020 DISIS STAGE   
GEN-2020-043DISIS-2020-00102 NEBRASKADouglas CountyNE4/30/20235/31/2023  56.5256.5256.52ER/NR000ThermalReciprocating EngineBetween Substation 1209 and 1252; 161kV4/29/2020 DISIS STAGE   
GEN-2020-042DISIS-2020-00102 NEBRASKAPlattsmouthNE4/30/20235/31/2023  56.5256.5256.52ER/NR000ThermalReciprocating EngineSubstation 3740; 345kV4/29/2020 DISIS STAGE   
GEN-2020-041DISIS-2020-00102 NEBRASKAPlattsmouthNE4/30/20235/31/2023  56.5256.5256.52ER/NR000ThermalReciprocating EngineSubstation 3740; 345kV4/29/2020 DISIS STAGE   
GEN-2020-040DISIS-2020-00102 NEBRASKAPlattsmouthNE4/30/20235/31/2023  303258303ER/NR000ThermalCTSubstation 3740; 345kV4/29/2020 DISIS STAGE   
GEN-2020-039DISIS-2020-00102 NEBRASKAPlattsmouthNE4/30/20235/31/2023  56.5256.5256.52ER/NR000ThermalReciprocating EngineSubstation 3740; 345kV4/29/2020 DISIS STAGE   
GEN-2020-038DISIS-2020-00102 NEBRASKAPlattsmouthNE4/30/20235/31/2023  303258303ER/NR000ThermalCTSubstation 3740; 345kV4/29/2020 DISIS STAGE   
GEN-2020-037DISIS-2020-00102 NEBRASKAPlattsmouthNE4/30/20235/31/2023  56.5256.5256.52ER/NR000ThermalReciprocating EngineSubstation 3740; 345kV4/29/2020 DISIS STAGE   
GEN-2020-036DISIS-2020-00102 NEBRASKAPlattsmouthNE4/30/20235/31/2023  303258303ER/NR000ThermalCTSubstation 3740; 345kV4/29/2020 DISIS STAGE   
GEN-2020-035DISIS-2020-00102 NEBRASKAPlattsmouthNE4/30/20235/31/2023  424.5418424.5ER/NR000ThermalCTSubstation 3740; 345kV4/29/2020 DISIS STAGE   
GEN-2020-034DISIS-2020-00102 NEBRASKASarpy CountyNE4/30/20235/31/2023  56.5256.5256.52ER/NR000ThermalReciprocating EngineSubstation 1363; 161kV Substation4/29/2020 DISIS STAGE   
GEN-2020-033DISIS-2020-00102 NEBRASKASarpy CountyNE4/30/20235/31/2023  505050ER/NR000SolarSubstation 1363; 161kV Substation4/29/2020 DISIS STAGE   
GEN-2020-032DISIS-2020-00102 NEBRASKASarpy CountyNE4/30/20235/31/2023  56.5256.5256.52ER/NR000ThermalReciprocating EngineSubstation 1363; 161kV Substation4/29/2020 DISIS STAGE   
GEN-2020-031DISIS-2020-00102 NEBRASKASarpy CountyNE4/30/20235/31/2023  303258303ER/NR000ThermalCTSubstation 1363; 161kV Substation4/29/2020 DISIS STAGE   
GEN-2020-030DISIS-2020-00102 NEBRASKASarpy CountyNE4/30/20235/31/2023  505050ER/NR000SolarSubstation 1363; 161kV Substation4/29/2020 DISIS STAGE   
GEN-2020-029DISIS-2020-00102 NEBRASKASarpy CountyNE4/30/20235/31/2023  56.5256.5256.52ER/NR000ThermalReciprocating EngineSubstation 1363; 161kV Substation4/29/2020 DISIS STAGE   
GEN-2020-028DISIS-2020-00102 NEBRASKASarpy CountyNE4/30/20235/31/2023  303258303ER/NR000ThermalCTSubstation 1363; 161kV Substation4/29/2020 DISIS STAGE   
GEN-2020-027DISIS-2020-00102 NEBRASKASarpy CountyNE4/30/20235/31/2023  505050ER/NR000SolarSubstation 1363; 161kV Substation4/29/2020 DISIS STAGE   
GEN-2020-026DISIS-2020-00102 NEBRASKASarpy CountyNE4/30/20235/31/2023  56.5256.5256.52ER/NR000ThermalReciprocating EngineSubstation 1363; 161kV Substation4/29/2020 DISIS STAGE   
GEN-2020-025DISIS-2020-00102 NEBRASKASarpy CountyNE4/30/20235/31/2023  303258303ER/NR000ThermalCTSubstation 1363; 161kV Substation4/29/2020 DISIS STAGE   
GEN-2020-024DISIS-2020-00102 NEBRASKASarpy CountyNE4/30/20235/31/2023  424.5418424.5ER/NR000ThermalCTSubstation 1363; 161kV Substation4/29/2020 DISIS STAGE   
GEN-2020-023DISIS-2020-00104 SOUTHEASTCarrierOK11/1/202112/1/2021  202202202ER/NR000Battery/StorageWoodring 345 KV Station4/7/2020 DISIS STAGE   
GEN-2020-022DISIS-2020-00103 CENTRALFinney CountyKS11/1/202312/1/2023  125125125ER/NR000WindHOLCOMB SUB 115KV BUS4/29/2020 DISIS STAGE   
GEN-2020-021DISIS-2020-00101 NORTHSioux CountyNDBEPC11/30/202312/31/2023  235235235ER/NR000WindLeLand Olds-Fort Thompson 345kV4/24/2020 DISIS STAGE   
GEN-2020-020DISIS-2020-00104 SOUTHEASTBramanOK9/30/202210/31/2022  201.6201.6201.6ER/NR000WindRanch Road 345 kV Substation4/28/2020 DISIS STAGE   
GEN-2020-019DISIS-2020-00101 NORTHTripp CountySDWAPA7/30/20268/30/2026  182.4182.4182.4ER/NR000WindWitten Substation 115 kV4/29/2020 DISIS STAGE   
GEN-2020-018DISIS-2020-00101 NORTHSully CountySDBEPC7/30/20268/30/2026  205.2205.2205.2ER/NR000WindLeland Olds-Ft. Thompson 345 kV4/28/2020 DISIS STAGE   
GEN-2020-017DISIS-2020-00105 SOUTHWESTLamb CountyTXSWPS10/1/202512/31/2025  74.8874.8874.88ER/NR000Solar69kV Lamb County Interchange4/24/2020 DISIS STAGE   
GEN-2020-016DISIS-2020-00104 SOUTHEASTGarvin CountyOK10/31/202212/1/2022  202202202ER/NR000Solar138kV Cromwell Substation4/20/2020 DISIS STAGE   
GEN-2020-015DISIS-2020-00103 CENTRALLawrence & Dade CountyMO11/1/202112/1/2021  104104104ER/NR000SolarDadeville 161 Station4/19/2020 DISIS STAGE   
GEN-2020-014DISIS-2020-00101 NORTHAlexanderNDBEPC6/17/202110/18/2021  60.54545ER/NR000ThermalGasLonesome Creek 115kV4/20/2020 DISIS STAGE   
GEN-2020-013DISIS-2020-00102 NEBRASKAOrleansNENPPD10/15/202612/31/2026  215215215ER/NR000HybridSolarHoldrege Substation 115kV4/10/2020 DISIS STAGE   
GEN-2020-012DISIS-2020-00104 SOUTHEASTWaltersOKWFEC10/15/202612/31/2026  113113113ER/NR000HybridSolarWalters 2 Substation 69kV4/10/2020 DISIS STAGE   
GEN-2020-011DISIS-2020-00102 NEBRASKAFunkNENPPD10/15/202612/31/2026  320320320ER/NR000HybridSolarSweetwater Substation 345kV4/8/2020 DISIS STAGE   
GEN-2020-010DISIS-2020-00104 SOUTHEASTMutualOKWFEC10/15/202612/31/2026  215215215ER/NR000HybridSolarMooreland-Taloga Substations 138kV4/8/2020 DISIS STAGE   
GEN-2020-009DISIS-2020-00104 SOUTHEASTFaxonOKAEP10/15/202612/31/2026  300300300ER/NR000HybridSolarLawton to Oklaunion 345kV4/8/2020 DISIS STAGE   
GEN-2020-008DISIS-2020-00103 CENTRALStevens CountyKS9/1/20239/24/2023  250250250ER/NR000SolarSunflower Electric Carpenter 345kV Substation4/22/2020 DISIS STAGE   
GEN-2020-007DISIS-2020-00103 CENTRALLinn CountyKS7/1/20238/1/2023  650650650ER/NR000SolarEvergy La Cygne 345kV Substation4/22/2020 DISIS STAGE   
GEN-2020-006DISIS-2020-00101 NORTHBowman CountyNDBEPC11/1/202311/30/2023  250250250ER/NR000SolarBowman 230kV substation4/23/2020 DISIS STAGE   
GEN-2020-005DISIS-2020-00105 SOUTHWESTCarson CountyTXSWPS1/15/20232/15/2023  150150150ER/NR000WindYarnall Tap - Conway 115 kV Line3/31/2020 DISIS STAGE   
GEN-2020-004DISIS-2020-00102 NEBRASKAOtoeNEOPPD10/1/202312/1/2023  250250250ER/NR000SolarCass County to Nebraska City #2 345kV4/3/2020 DISIS STAGE   
GEN-2020-003DISIS-2020-00103 CENTRALWinfieldKS3/1/20236/1/2023  585858ER/NR000ThermalDiesel/GasEast Substation 69 kV4/1/2020 DISIS STAGE   
GEN-2020-002DISIS-2020-00102 NEBRASKAYutanNEOPPD11/15/202212/1/2022  818181ER/NR000Solar6846 Substation 69 kV4/6/2020 DISIS STAGE   
GEN-2020-001DISIS-2020-00102 NEBRASKACheyenne CountyNE11/30/202212/31/2022  200200200ER/NR000SolarSidney Substation 345kV12/6/2019 DISIS STAGE   
GEN-2019-079DISIS-2019-00103 CENTRALGrayKS6/30/2019   131313ER000WindGray County 115kV5/21/2019 DISIS STAGE   
GEN-2019-077DISIS-2019-00102 NEBRASKALancasterNE12/31/2022   100100100ER/NR000Battery/Storage84th/Fletcher 115kV substation5/24/2019 DISIS STAGE   
GEN-2019-076DISIS-2019-00102 NEBRASKAJacksonMO12/31/2022   292929ER/NR000Battery/StorageDuncan 69kV substation5/24/2019 DISIS STAGE   
GEN-2019-075DISIS-2019-00102 NEBRASKAJohnsonNE12/31/2023   242424ER/NR000SolarSouth Sterling 69kV5/24/2019 DISIS STAGE   
GEN-2019-074DISIS-2019-00102 NEBRASKAWashingtonNE12/31/2023   100100100ER/NR000SolarS1226 161kV5/24/2019 DISIS STAGE   
GEN-2019-073DISIS-2019-00102 NEBRASKAWashingtonNE12/31/2023   100100100ER/NR000SolarS1226 161kV5/24/2019 DISIS STAGE   
GEN-2019-072DISIS-2019-00102 NEBRASKAWashingtonNE12/31/2023   505050ER/NR000Battery/StorageS1226 161 kV substation5/24/2019 DISIS STAGE   
GEN-2019-071DISIS-2019-00102 NEBRASKABurtNE12/31/2023   515151ER/NR000Battery/StorageRaun-Fort Calhoun 345kV line5/24/2019 DISIS STAGE   
GEN-2019-070DISIS-2019-00102 NEBRASKABurtNEOPPD12/31/2023   505050ER/NR000SolarRaun-Fort Calhoun 345kV line5/24/2019 DISIS STAGE   
GEN-2019-069DISIS-2019-00102 NEBRASKAWashingtonNE12/31/2023   100100100ER/NR000SolarRaun-Fort Calhoun 345kV line5/24/2019 DISIS STAGE   
GEN-2019-068DISIS-2019-00103 CENTRALBartonKS6/1/2023   505050ER/NR000Battery/StorageGreat Bend - Circle 230kV line5/24/2019 DISIS STAGE   
GEN-2019-067DISIS-2019-00104 SOUTHEASTCanadianOK6/1/2023   303030ER/NR000Battery/StorageCimarron - Minco 345kV line5/24/2019 DISIS STAGE   
GEN-2019-066DISIS-2019-00104 SOUTHEASTBeckhamOK6/1/2023   505050ER/NR000Battery/StorageSweetwater 230kV substation5/24/2019 DISIS STAGE   
GEN-2019-065DISIS-2019-00104 SOUTHEASTSmith, RuskTX6/1/2024   200200200ER000Battery/StorageOverton 138kV5/23/2019 DISIS STAGE   
GEN-2019-064DISIS-2019-00105 SOUTHWESTSwisherTX6/1/2024   400400400ER000Battery/StorageKress 115kV5/23/2019 DISIS STAGE   
GEN-2019-063DISIS-2019-00103 CENTRALFord, ClarkKS6/1/2023   505050ER/NR000Battery/StorageClark County 345kV substation5/24/2019 DISIS STAGE   
GEN-2019-062DISIS-2019-00103 CENTRALButlerKS12/31/2022   909090ER/NR000Battery/StoragePony Meadows 161kV substation5/24/2019 DISIS STAGE   
GEN-2019-060DISIS-2019-00103 CENTRALGrantKS12/31/2022   150150150ER/NR000SolarSpearville 115kV substation5/22/2019 DISIS STAGE   
GEN-2019-058DISIS-2019-00103 CENTRALFord, ClarkKS6/1/2023   150150150ER/NR000SolarClark County 345kV substation5/24/2019 DISIS STAGE   
GEN-2019-057DISIS-2019-00101 NORTHDay, ClarkSDWAPA12/1/2020   63.163.163.1ER/NR000SolarHuron 230kV4/30/2019 DISIS STAGE   
GEN-2019-056DISIS-2019-00105 SOUTHWESTRandallTX12/31/2022   100100100ER/NR000Battery/StorageRandall 115kV substation5/24/2019 DISIS STAGE   
GEN-2019-055DISIS-2019-00103 CENTRALEdwards, PawneeKS6/1/2023   150150150ER/NR000SolarGreat Bend-Spearville 230kV line5/24/2019 DISIS STAGE   
GEN-2019-054DISIS-2019-00103 CENTRALBartonKS6/1/2023   150150150ER/NR000SolarGreat Bend- Circle 230kV line5/24/2019 DISIS STAGE   
GEN-2019-053DISIS-2019-00103 CENTRALEdwards/PawneeKS6/1/2023   505050ER/NR000Battery/StorageGreat Bend-Spearville 230kV line5/24/2019 DISIS STAGE   
GEN-2019-052DISIS-2019-00104 SOUTHEASTCanadianOK6/1/2023   135135135ER/NR000SolarCimarron-Minco 345kV line5/24/2019 DISIS STAGE   
GEN-2019-051DISIS-2019-00103 CENTRALBartonKS6/1/2023   404040ER/NR000Battery/StorageFrey St 115kV bus5/24/2019 DISIS STAGE   
GEN-2019-050DISIS-2019-00103 CENTRALGoveKS6/1/2023   505050ER/NR000SolarGrinnell 115kV5/24/2019 DISIS STAGE   
GEN-2019-049DISIS-2019-00104 SOUTHEASTCaddo LA12/31/2022   606060ER/NR000Battery/StorageFournoy 69kV substation5/24/2019 DISIS STAGE   
GEN-2019-048DISIS-2019-00103 CENTRALJacksonMO12/31/2022   505050ER/NR000Battery/StorageDuncan 69kV substation5/24/2019 DISIS STAGE   
GEN-2019-047DISIS-2019-00103 CENTRALButlerKS12/31/2022   150150150ER/NR000Battery/StorageButler 138kV substation5/24/2019 DISIS STAGE   
GEN-2019-046DISIS-2019-00104 SOUTHEASTWoodsOK12/31/2022   909090ER/NR000Battery/StorageDeGrasse 138kV substation5/24/2019 DISIS STAGE   
GEN-2019-045DISIS-2019-00104 SOUTHEASTWoodsOK12/31/2022   175175175ER/NR000SolarDeGfrasse 138kV5/24/2019 DISIS STAGE   
GEN-2019-044DISIS-2019-00103 CENTRALEllsworthKS12/31/2023   100100100ER/NR000WindFort Dodge 115kV substation5/24/2019 DISIS STAGE   
GEN-2019-043DISIS-2019-00101 NORTHFallonMTWAPA12/1/2023   150150150ER/NR000SolarBaker-Mile City 230kV line5/23/2019 DISIS STAGE   
GEN-2019-042DISIS-2019-00102 NEBRASKACheyenneNE12/1/2020   104104104ER/NR000SolarSidney 345kV5/23/2019 DISIS STAGE   
GEN-2019-041DISIS-2019-00102 NEBRASKALancasterNE12/1/2020   787878ER/NR000Solar115kV Monolith Substation5/23/2019 DISIS STAGE   
GEN-2019-039DISIS-2019-00102 NEBRASKAButlerNE5/16/2022   174.5174.2174.5ER/NR000SolarColumbus Southeast-Rising City 115kV5/21/2019 DISIS STAGE   
GEN-2019-038DISIS-2019-00105 SOUTHWESTPotterTX6/30/2021   505050ER000Battery/StoragePotter County 230kV5/23/2019 DISIS STAGE   
GEN-2019-037DISIS-2019-00101 NORTHMercerNDBEPC12/1/2023   150150150ER/NR000SolarBEPC 230kV substation5/17/2019 DISIS STAGE   
GEN-2019-036DISIS-2019-00105 SOUTHWESTPotterTX6/30/2021   707070ER000SolarPotter County 230kV5/15/2019 DISIS STAGE   
GEN-2019-035DISIS-2019-00103 CENTRALBarryMO12/31/2022   808080ER/NR000SolarReeds Spring-Aurora 161kV5/2/2019 DISIS STAGE   
GEN-2019-034DISIS-2019-00104 SOUTHEASTBryanOK6/1/2023   120120120ER/NR000ThermalGasButter Field-Duran 138kV5/2/2019 DISIS STAGE   
GEN-2019-033DISIS-2019-00102 NEBRASKAKnoxNE12/1/2021   182182182ER/NR000SolarHuron 345kV station5/1/2019 DISIS STAGE   
GEN-2019-032DISIS-2019-00101 NORTHDaySDBEPC12/1/2020   63.163.163.1ER/NR000Battery/StorageHuron 345kV station4/30/2019 DISIS STAGE   
GEN-2019-030DISIS-2019-00103 CENTRALFordKS12/1/2021   252252252ER/NR000Wind345kV Ironwood Switching Station4/25/2019 DISIS STAGE   
GEN-2019-029DISIS-2019-00102 NEBRASKAKeith and PerkinsNENPPD12/1/2021   404404404ER/NR000Wind345kV Gerald Gentleman Station4/25/2019 DISIS STAGE   
GEN-2019-028DISIS-2019-00102 NEBRASKALincoln County, NENENPPD12/1/2022   400400400ER/NR000SolarGerald Gentlemen 345kV Substation4/23/2019 DISIS STAGE   
GEN-2019-027DISIS-2019-00104 SOUTHEASTComanche CountyOKAEPW10/1/2023   404040ER/NR000ThermalCombustionFt. Sill/Mow Way 138kV Station5/1/2019 DISIS STAGE   
GEN-2019-026DISIS-2019-00105 SOUTHWESTLeaNM12/31/2023   150150150ER/NR000Battery/StorageHobbs 230kV5/8/2019 DISIS STAGE   
GEN-2019-025DISIS-2019-00105 SOUTHWESTLeaNM12/23/2023   240240240ER/NR000SolarHobbs 230kV5/8/2019 DISIS STAGE   
GEN-2019-024DISIS-2019-00101 NORTHWibauxMTWAPA12/31/2023   505050ER/NR000Battery/StorageBeaver Hill Sub5/8/2019 DISIS STAGE   
GEN-2019-023DISIS-2019-00101 NORTHWibauxMTWAPA12/31/2023   110110110ER/NR000WindBeaver Hill sub5/8/2019 DISIS STAGE   
GEN-2019-022DISIS-2019-00105 SOUTHWESTLeaNM12/31/2021   414141ER000SolarBender West 115kV4/24/2019 DISIS STAGE   
GEN-2019-021DISIS-2019-00105 SOUTHWESTRooseveltNM12/1/2022   505050ER000Battery/StorageRoosevelt to Tolk West 230kV4/29/2019 DISIS STAGE   
GEN-2019-019DISIS-2019-00101 NORTHSiouxIANIPCO2/1/20207/22/2022  15.1515.1515.15ER/NR000ThermalGas TurbineSiouxland 69kV4/24/2019 DISIS STAGE    
GEN-2019-018DISIS-2019-00103 CENTRALRiceKSMIDW3/1/20206/1/2021  15.5611.9715.56ER/NR000ThermalGas TurbineSaxman 115kV substation4/24/2019 DISIS STAGE   
GEN-2019-017DISIS-2019-00101 NORTHButteSDWAPA12/31/2021   142.8142.8142.8ER/NR000WindTap 115kV Maurine to Newell transmission line4/24/2019 DISIS STAGE   
GEN-2019-016DISIS-2019-00103 CENTRALPolk and DadeMO11/30/2022   200200200ER/NR000SolarDadeville substation 161kV4/30/2019 DISIS STAGE   
GEN-2019-014DISIS-2019-00103 CENTRALFinneyKS12/1/2022   125125125ER/NR000SolarHolcomb 115kV substation4/24/2019 DISIS STAGE   
GEN-2019-013DISIS-2019-00104 SOUTHEASTRoger MillsOK12/31/2021   505050ER/NR000Battery/StorageDempsey 230kV4/24/2019 DISIS STAGE   
GEN-2019-012DISIS-2019-00104 SOUTHEASTWoodwardOK5/1/2023   200200200ER/NR000Battery/StorageWoodward 138kV substation5/22/2019 DISIS STAGE   
GEN-2019-011DISIS-2019-00105 SOUTHWESTYoakumTX5/1/2023   230230230ER/NR000Battery/StorageYoakum 345kV subtstation4/22/2019 DISIS STAGE   
GEN-2019-010DISIS-2019-00102 NEBRASKACassNE10/31/2022   505050ER/NR000SolarElmswood 69kV substation4/24/2019 DISIS STAGE   
GEN-2019-009DISIS-2019-00102 NEBRASKANemahaNE10/31/2022   100100100ER/NR000SolarBrock 161kV substation4/24/2019 DISIS STAGE   
GEN-2019-004DISIS-2019-00105 SOUTHWESTHobbsNM6/4/2019   565656ER000ThermalCTHobbs 230kV4/22/2019 DISIS STAGE   
GEN-2019-003DISIS-2019-00105 SOUTHWESTRooseveltNM12/1/2022   150150150ER000SolarRoosevelt to Tolk West 230kV4/19/2019 DISIS STAGE   
GEN-2019-002DISIS-2019-00104 SOUTHEASTMayesOK12/1/2020   100100100ER000Battery/StorageMaid 161kV substation11/26/2018 DISIS STAGE   
GEN-2019-001DISIS-2019-00103 CENTRALPrattKSWERE12/31/201812/31/2018  252525ER000WindThistle-Wichita Dbl Ckt (Buffalo Flats) 345kV11/27/2018 DISIS STAGE   
GEN-2018-132DISIS-2018-00202 NEBRASKAPierceNE12/31/2020   201.6201.6201.6ER/NR000SolarNeligh-Hoskins 345kV line11/21/2018 DISIS STAGE   
GEN-2018-131DISIS-2018-00202 NEBRASKAPierceNE12/31/2020   221.4221.4221.4ER/NR000SolarTap on Neligh-Hoskins 345kV11/21/2018 DISIS STAGE   
GEN-2018-130DISIS-2018-00202 NEBRASKAKnoxNE12/31/2020   122122122ER/NR000WindKelly to Fort Randall 230kV11/21/2018 DISIS STAGE   
GEN-2018-129DISIS-2018-00201 NORTHHyde/HughesSDWAPA9/1/2021   200.22200.22200.22ER/NR000WindFort Thompson-Oahe 230kV11/19/2018 DISIS STAGE   
GEN-2018-128DISIS-2018-00203 CENTRALSumnerKS9/1/2021   200.22200.22200.22ER/NR000WindRenfrow-Viola 345 kV11/19/2018 DISIS STAGE   
GEN-2018-126DISIS-2018-00203 CENTRALJohnsonKS12/1/2021   250250250ER000SolarWest Gardner - Cedar Creek 161kV transmission line11/21/2018 DISIS STAGE   
GEN-2018-125DISIS-2018-00202 NEBRASKALincolnNE12/15/2022   231231231ER/NR000WindNew switching station on Gentleman to Sweetwater 345kV line11/19/2018 DISIS STAGE   
GEN-2018-124DISIS-2018-00205 SOUTHWESTParmerTX12/31/2023   200200200ER/NR000SolarTolk 230kV substation11/21/2018 DISIS STAGE   
GEN-2018-123DISIS-2018-00203 CENTRALEllsworthKS12/31/2023   200200200ER/NR000WindSibley to Overton 345kV11/21/2018 DISIS STAGE   
GEN-2018-122DISIS-2018-00203 CENTRALRallsMO12/31/2023   200200200ER/NR000WindSalisbury 161kV substation11/21/2018 DISIS STAGE   
GEN-2018-121DISIS-2018-00203 CENTRALMiamiMO12/31/2020   505050ER/NR000Battery/StorageArchie 161kV substation11/21/2018 DISIS STAGE   
GEN-2018-120DISIS-2018-00203 CENTRALSumnerKS12/31/2023   400400400ER/NR000WindStranger Creek 345kV substation11/21/2018 DISIS STAGE   
GEN-2018-118DISIS-2018-00205 SOUTHWESTLeaNMSWPS6/1/2021   304.992304.992304.992ER/NR000SolarCrossroads to Eddy County 345kV11/21/2018 DISIS STAGE   
GEN-2018-117DISIS-2018-00204 SOUTHEASTRoger MillsOK12/31/2022   150150150ER/NR000SolarSweetwater 230kV11/20/2018 DISIS STAGE   
GEN-2018-116DISIS-2018-00203 CENTRALBartonKS12/31/2022   150150150ER/NR000SolarFrey Street 115kV bus11/20/2018 DISIS STAGE   
GEN-2018-115DISIS-2018-00204 SOUTHEASTLawtonOK12/1/2021   250250250ER000SolarLawton East Side 345kV substation11/21/2018 DISIS STAGE   
GEN-2018-114DISIS-2018-00203 CENTRALLinnKS12/31/2023   404040ER/NR000Battery/StorageArchie 161kV substation11/21/2018 DISIS STAGE   
GEN-2018-112DISIS-2018-00205 SOUTHWESTParmerTX12/31/2023   185185185ER/NR000SolarTolk 230kV substation11/21/2018 DISIS STAGE   
GEN-2018-111DISIS-2018-00205 SOUTHWESTParmerTX12/31/2023   757575ER/NR000Battery/StorageTolk 230kV substation11/21/2018 DISIS STAGE   
GEN-2018-109DISIS-2018-00203 CENTRALCaddoOK12/31/2020   505050ER/NR000Battery/StorageMinco-Gracemont 345kV line11/21/2018 DISIS STAGE   
GEN-2018-108DISIS-2018-00203 CENTRALBarberKS12/31/2020   959595ER/NR000Battery/StorageThistle 345kV substation11/21/2018 DISIS STAGE   
GEN-2018-106DISIS-2018-00204 SOUTHEASTCaddoLA12/31/2023   330330330ER/NR000SolarLongwood 345kV substation11/2/2018 DISIS STAGE   
GEN-2018-105DISIS-2018-00204 SOUTHEASTCaddoLA12/31/2023   505050ER/NR000Battery/StorageLongwood 345kV11/21/2018 DISIS STAGE   
GEN-2018-104DISIS-2018-00203 CENTRALJacksonMO12/31/2023   100100100ER/NR000Battery/StorageLongwood 345kV substation11/21/2018 DISIS STAGE   
GEN-2018-103DISIS-2018-00203 CENTRALJacksonMO12/31/2023   200200200ER/NR000SolarMissouri City 161kV substation11/21/2018 DISIS STAGE   
GEN-2018-102DISIS-2018-00203 CENTRALJacksonMO12/31/2023   200200200ER/NR000SolarMissouri City 161kV substation11/21/2018 DISIS STAGE   
GEN-2018-101DISIS-2018-00203 CENTRALCassMO12/31/2023   175175175ER/NR000SolarLydia 345kV substation11/21/2018 DISIS STAGE   
GEN-2018-100DISIS-2018-00204 SOUTHEASTPemiscotMO12/31/2023   200200200ER/NR000SolarKennet 161kV substation11/21/2018 DISIS STAGE   
GEN-2018-099DISIS-2018-00203 CENTRALRallsMO12/31/2023   300300300ER/NR000WindSalisbury 161kV substation11/21/2018 DISIS STAGE   
GEN-2018-098DISIS-2018-00204 SOUTHEASTCaddoOK12/31/2021   404040ER/NR000Battery/StorageOney 138kV substation11/21/2018 DISIS STAGE   
GEN-2018-097DISIS-2018-00204 SOUTHEASTCraig/NovataOK12/31/2023   100100100ER/NR000Battery/StorageNeosho-Delaware 345kV substation11/21/2018 DISIS STAGE   
GEN-2018-096DISIS-2018-00203 CENTRALJacksonMO12/31/2023   205205205ER/NR000SolarNashua 345kV substation11/21/2018 DISIS STAGE   
GEN-2018-095DISIS-2018-00203 CENTRALJacksonMO12/31/2023   100100100ER/NR000Battery/StorageNashua 345kV substation11/21/2018 DISIS STAGE   
GEN-2018-093DISIS-2018-00203 CENTRALSedgwickKS12/31/2021   606060ER/NR000Battery/StorageWichita 345kV substation11/21/2018 DISIS STAGE   
GEN-2018-092DISIS-2018-00205 SOUTHWESTFoard/WilbargerTX12/31/2023   400400400ER/NR000SolarOklaunion 345kV substation11/21/2018 DISIS STAGE   
GEN-2018-091DISIS-2018-00205 SOUTHWESTWilbargerOK12/31/2023   250250250ER/NR000Battery/StorageOklaunion 345kV substation11/21/2018 DISIS STAGE   
GEN-2018-090DISIS-2018-00202 NEBRASKAWashingtonNE12/31/2023   125125125ER/NR000Battery/StorageFort Calhoun 345kV substation11/21/2018 DISIS STAGE   
GEN-2018-089DISIS-2018-00202 NEBRASKAWashingtonNE12/31/2023   196196196ER/NR000SolarFort Calhoun 345kV substation11/21/2018 DISIS STAGE   
GEN-2018-088DISIS-2018-00204 SOUTHEASTBowieTX12/31/2023   130130130ER/NR000SolarLydia 345kV substation11/21/2018 DISIS STAGE   
GEN-2018-087DISIS-2018-00204 SOUTHEASTMorrisTX12/31/2023   757575ER/NR000Battery/StorageLydia-Welsh 345kV line11/21/2018 DISIS STAGE   
GEN-2018-086DISIS-2018-00205 SOUTHWESTTerryTX12/31/2020   505050ER/NR000Battery/StorageSulphur Springs 115kV substation11/21/2018 DISIS STAGE   
GEN-2018-085DISIS-2018-00205 SOUTHWESTBaileyTX12/31/2019   747474ER/NR000Battery/StorageRoosevelt-Tolk 230kV line11/21/2018 DISIS STAGE   
GEN-2018-084DISIS-2018-00203 CENTRALLinnMO12/31/2023   808080ER/NR000SolarArchie 161kV substation11/19/2018 DISIS STAGE   
GEN-2018-083DISIS-2018-00202 NEBRASKAMadisonNE12/31/2023   250250250ER/NR000WindNorfolk 115kV substation11/16/2018 DISIS STAGE   
GEN-2018-082DISIS-2018-00204 SOUTHEASTMorrisTX12/31/2023   270270270ER/NR000SolarLydia-Welsh 345kV line11/18/2018 DISIS STAGE   
GEN-2018-081DISIS-2018-00204 SOUTHEASTCraigOK12/31/2023   175175175ER/NR000SolarNeosho-Delaware 345kV line11/18/2018 DISIS STAGE   
GEN-2018-079DISIS-2018-00204 SOUTHEASTCraig/NovataOK12/31/2023   148148148ER/NR000SolarNeosho-Delaware 345kV line11/18/2018 DISIS STAGE   
GEN-2018-078DISIS-2019-00105 SOUTHWESTLea CountyNM12/31/2021   240240240ER/NR000WindEddy County-Crossroads11/19/2018 DISIS STAGE   
GEN-2018-074DISIS-2018-00201 NORTHCrawford and Carrol IAWAPA5/10/2022   120120120ER/NR000WindDenison 230kV10/31/2018 DISIS STAGE   
GEN-2018-073DISIS-2018-00205 SOUTHWESTFloydTX10/30/2020   250250250ER000SolarNew switching station on Border-Tuco 345kV tap10/24/2018 DISIS STAGE   
GEN-2018-072DISIS-2018-00204 SOUTHEASTOsageOKOKGE11/30/2021   151.2151.2151.2ER000WindRanch Road 345 kV10/26/2018 DISIS STAGE   
GEN-2018-071DISIS-2018-00204 SOUTHEASTKayOK11/30/2021   151.2151.2151.2ER000WindRanch Road 345 kV10/25/2018 DISIS STAGE   
GEN-2018-070DISIS-2018-00201 NORTHBon HommeSDWAPA12/31/20194/22/2020  18.3118.3118.31ER/NR000WindUtica Junction 230 kV substation10/29/2018 DISIS STAGE   
GEN-2018-069DISIS-2018-00201 NORTHWibauxMTWAPA12/31/2020   125125125ER/NR000WindMingusville 230kV switchyard10/26/2018 DISIS STAGE   
GEN-2018-068DISIS-2018-00202 NEBRASKAMadisonNE9/1/2022   302.4302.4302.4ER/NR000WindTap on 348kV Antelope to Hopkins transmission line10/26/2018 DISIS STAGE   
GEN-2018-067DISIS-2018-00201 NORTHWilliamsNDBEPC10/30/2020   255255255ER000WindNew switching station on Judson-Tande 345kV line10/25/2018 DISIS STAGE   
GEN-2018-065DISIS-2018-00203 CENTRALMarionKS7/1/2020   19.819.819.8ER/NR000WindEmporia Energy Center-Wichita 345kV10/24/2018 DISIS STAGE   
GEN-2018-064DISIS-2018-00204 SOUTHEASTBentonAR6/30/2021   808080ER/NR000SolarTonnece Substation 69kV10/24/2018 DISIS STAGE   
GEN-2018-063DISIS-2018-00203 CENTRALGreeneMO6/30/2021   575757ER/NR000Solar69kV ring bus interconnetion to Sedalia and Nicols Street 69kV line10/23/2018 DISIS STAGE   
GEN-2018-062DISIS-2018-00103 CENTRALWyandotteKS12/31/2020   75.675.675.6ER/NR000SolarNearman 161kV substation5/29/2018 DISIS STAGE   
GEN-2018-061DISIS-2018-00103 CENTRALJasperMO12/31/2021   505050ER/NR000Battery/StorageBlackberry - Neosho 345kV Line5/29/2018 DISIS STAGE   
GEN-2018-060DISIS-2018-00102 NEBRASKAWebsterNE12/1/2020   505050ER/NR000WindAxtell-Post Rock 345 kV5/29/2018 DISIS STAGE   
GEN-2018-059DISIS-2018-00103 CENTRALLeavenworthKS12/31/2020   252252252ER/NR000SolarStranger Creek 345kV5/29/2018 DISIS STAGE   
GEN-2018-058DISIS-2018-00103 CENTRALLeavenworthKS12/31/2020   252252252ER/NR000SolarStranger Creek 345kV5/29/2018 DISIS STAGE   
GEN-2018-057DISIS-2018-00103 CENTRALSedgwickKS12/31/2020   203.4203.4203.4ER/NR000SolarGordon Evans 138kV5/29/2018 DISIS STAGE   
GEN-2018-056DISIS-2018-00102 NEBRASKAKnox/HoltNE12/31/2020   102.6102.6102.6ER/NR000SolarFort Thompson-Grand Island (Grand Prairie) 345kV5/29/2018 DISIS STAGE   
GEN-2018-055DISIS-2018-00104 SOUTHEASTGradyOK12/31/2020   252252252ER/NR000SolarLawton East Side-Sunnyside (Terry Road) 345kV5/29/2018 DISIS STAGE   
GEN-2018-054DISIS-2018-00103 CENTRALLinnKS12/31/2021   120120120ER/NR000SolarArchie 161kV Substation5/29/2018 DISIS STAGE   
GEN-2018-053DISIS-2018-00103 CENTRALJasperMO12/31/2021   100100100ER/NR000SolarBlackberry - Neosho 345kV Line5/29/2018 DISIS STAGE   
GEN-2018-052DISIS-2018-00105 SOUTHWESTLeaNM12/31/2021   707070ER/NR000Battery/StorageRoadrunner 115kV Substation5/29/2018 DISIS STAGE   
GEN-2018-051DISIS-2018-00105 SOUTHWESTSwisherTX12/31/2021   353535ER/NR000Battery/StorageSwisher 115kV Substation5/29/2018 DISIS STAGE   
GEN-2018-050DISIS-2018-00104 SOUTHEASTCaddoOK12/31/2021   200200200ER/NR000SolarGracemont-Minco 345kV Line5/29/2018 DISIS STAGE   
GEN-2018-049DISIS-2018-00103 CENTRALSumnerKS12/31/2021   120120120ER/NR000SolarWichita 345kV Substation5/29/2018 DISIS STAGE   
GEN-2018-048DISIS-2018-00104 SOUTHEASTCaddoOK12/31/2021   300300300ER/NR000SolarPecan Creek 345kV Substation5/29/2018 DISIS STAGE   
GEN-2018-046DISIS-2018-00102 NEBRASKABannerNENPPD12/31/2021   398.2398.2398.2ER/NR000WindGerald Gentleman 345kV Substation5/29/2018 DISIS STAGE   
GEN-2018-045DISIS-2018-00102 NEBRASKABannerNENPPD12/31/2021   599.8599.8599.8ER/NR000WindGerald Gentleman 345kV Substation5/29/2018 DISIS STAGE   
GEN-2018-044DISIS-2018-00102 NEBRASKAAntelopeNE12/31/2021   500500500ER/NR000WindFort Calhoun 345kV Substation5/29/2018 DISIS STAGE   
GEN-2018-043DISIS-2018-00102 NEBRASKAAntelopeNE12/31/2021   500500500ER/NR000SolarFt. Calhoun - Raun 345 kV Line5/29/2018 DISIS STAGE   
GEN-2018-042DISIS-2018-00103 CENTRALJohnsonNE12/31/2021   300300300ER/NR000WindSibley - Overton 345kV Line5/29/2018 DISIS STAGE   
GEN-2018-041DISIS-2018-00103 CENTRALRallsMO12/31/2021   400400400ER/NR000WindSibley - Overton 345kV Line5/29/2018 DISIS STAGE   
GEN-2018-040DISIS-2018-00103 CENTRALRallsMO12/31/2021   100100100ER/NR000WindSibley - Overton 345kV Line5/29/2018 DISIS STAGE   
GEN-2018-039DISIS-2018-00101 NORTHLaMoureNDBEPC12/31/2020   727272ER/NR000SolarEdgeley 115kV substation5/29/2018 DISIS STAGE   
GEN-2018-038DISIS-2018-00103 CENTRALRayMO12/31/2020   203.4203.4203.4ER/NR000SolarSibley 345kV substation5/29/2018 DISIS STAGE   
GEN-2018-037DISIS-2018-00102 NEBRASKADouglasNE12/1/2020   100100100ER000Battery/StorageNorth Omaha (S1211) 161kV5/29/2018 DISIS STAGE   
GEN-2018-036DISIS-2018-00102 NEBRASKAScotts BluffNE12/1/2020   200200200ER000Battery/StorageStegall 230kV Substation5/29/2018 DISIS STAGE   
GEN-2018-035DISIS-2018-00101 NORTHClarkSDBEPC8/1/2021   200200200ER/NR000WindGroton-Watertown 345kV Line5/14/2018 DISIS STAGE   
GEN-2018-033DISIS-2018-00102 NEBRASKACassNEOPPD12/1/2020   200200200ER000Battery/StorageCass County 345kV Substation5/29/2018 DISIS STAGE   
GEN-2018-032DISIS-2018-00103 CENTRALMcPhearsonKS12/1/2021   310310310ER000WindNeosho 345kV Substation5/29/2018 DISIS STAGE   
GEN-2018-031DISIS-2018-00103 CENTRALJacksonMO12/1/2020   505050ER000Battery/StorageBlue Valley 161kV Substation5/29/2018 DISIS STAGE   
GEN-2018-030DISIS-2018-00103 CENTRALProwersCOSWPS12/1/2020   200200200ER000Battery/StorageLamar 345kV Substation5/29/2018 DISIS STAGE   
GEN-2018-029DISIS-2018-00104 SOUTHEASTOklahomaOKOKGE12/1/2020   100100100ER000Battery/StorageHorseshoe Lake 138kV Substation5/29/2018 DISIS STAGE   
GEN-2018-028DISIS-2018-00104 SOUTHEASTTulsaOK12/1/2020   200200200ER000Battery/StorageTulsa North 138kV Substation5/29/2018 DISIS STAGE   
GEN-2018-027DISIS-2018-00104 SOUTHEASTTulsaOK12/1/2020   100100100ER000Battery/StorageTulsa 138kV Substation5/29/2018 DISIS STAGE   
GEN-2018-026DISIS-2018-00104 SOUTHEASTCanadianOKOKGE12/1/2020   100100100ER000Battery/StorageMustang 138kV Substation5/29/2018 DISIS STAGE   
GEN-2018-025DISIS-2018-00102 NEBRASKAWashington NEOPPD12/1/2020   200200200ER000Battery/StorageFort Calhoun 345kV Substation5/29/2018 DISIS STAGE   
GEN-2018-024DISIS-2018-00104 SOUTHEASTMuskogeeOK12/1/2020   100100100ER000Battery/StorageCanadian River-Muskogee and Muskogee-Seminole 345kV5/28/2018 DISIS STAGE   
GEN-2018-022DISIS-2018-00103 CENTRALNodawayMO12/31/2020   300300300ER/NR000SolarMullen Creek 345kV Substation5/25/2018 DISIS STAGE   
GEN-2018-021DISIS-2018-00104 SOUTHEASTWashitaOK12/1/2020   74.174.174.1ER/NR000SolarChisholm-Gracemont 345kV Line5/24/2018 DISIS STAGE   
GEN-2018-017DISIS-2018-00102 NEBRASKABruleNENPPD12/31/2020   302.4302.4302.4ER000WindOgallala-Sydney 230kV4/27/2018 DISIS STAGE   
GEN-2018-016DISIS-2018-00102 NEBRASKABruleNENPPD12/31/2020   100.8100.8100.8ER000WindBrule 115kV Substation4/27/2018 DISIS STAGE   
GEN-2018-015DISIS-2018-00105 SOUTHWESTVernon/WilbargerTX10/31/2021   252252252ER/NR000WindTuco-Oklaunion 345kV Line4/27/2018 DISIS STAGE   
GEN-2018-014DISIS-2018-00103 CENTRALHoltMO11/30/2020   74.174.174.1ER/NR000Battery/StorageHolt County 345kV Switching Station4/27/2018 DISIS STAGE   
GEN-2018-013DISIS-2018-00103 CENTRALDickinsonKS12/1/2021   74.174.174.1ER/NR000Battery/StorageAbilene Energy Center-Northview 115kV Line4/27/2018 DISIS STAGE   
GEN-2018-012DISIS-2018-00102 NEBRASKAWayneNE12/1/2021   74.174.174.1ER/NR000Battery/StorageHoskins 345kV Substation4/27/2018 DISIS STAGE   
GEN-2018-011DISIS-2018-00104 SOUTHEASTKingfisherOK12/1/2020   74.174.174.1ER/NR000Battery/StorageDover 138 kV Switching Station4/27/2018 DISIS STAGE   
GEN-2018-010DISIS-2018-00101 NORTHMontrailNDBEPC12/1/2021   74.174.174.1ER/NR000Battery/StorageTande 345kV Substation4/27/2018 DISIS STAGE   
GEN-2018-009DISIS-2018-00103 CENTRALSeward/MeadeKSSUNC12/1/2020   250250250ER/NR000WindCimarron 115kV Substation4/27/2018 DISIS STAGE   
GEN-2018-008DISIS-2018-00101 NORTHMcIntoshNDBEPC9/30/2021   252252252ER/NR000WindGroton-Leland Olds 345kV Line4/27/2018 DISIS STAGE   
GEN-2018-007DISIS-2018-00101 NORTHGrant/RobertsSDWAPA12/31/2021   150150150ER/NR000WindSummit 115kV Substation4/27/2018 DISIS STAGE   
GEN-2018-004DISIS-2018-00105 SOUTHWESTLeaNM12/31/2019   74.9974.9974.99ER000SolarMaddox 115kV Substation4/26/2018 DISIS STAGE   
GEN-2018-003DISIS-2018-00104 SOUTHEASTBowieTXAEPW12/31/2021   150150150ER/NR000SolarNorth Boston-Bann 138kV Line4/25/2018 DISIS STAGE   
GEN-2017-240DISIS-2017-00204 SOUTHEASTOkmulgeeOKOKGE12/1/2020   202202202ER/NR000SolarBristow 138kV Substation11/30/2017 DISIS STAGE   
GEN-2017-239DISIS-2017-00205 SOUTHWESTYoakumTXSWPS6/1/2023   300300300ER000SolarMahoney 230kV Substation11/30/2017 DISIS STAGE   
GEN-2017-237DISIS-2017-00201 NORTHRooseveltMTBEPC9/1/2023   150150150ER/NR000WindSnake Butte 115kV Substation11/30/2017 DISIS STAGE   
GEN-2017-236DISIS-2017-00201 NORTHWardNDBEPC12/1/2020   505050ER/NR000WindLogan 230kV Substation11/30/2017 DISIS STAGE   
GEN-2017-235DISIS-2017-00201 NORTHWardNDBEPC12/1/2020   505050ER/NR000WindLogan 230kV Substation11/30/2017 DISIS STAGE   
GEN-2017-234DISIS-2017-00202 NEBRASKAGreeleyNENPPD12/31/2019   115115115ER000WindSpalding to North Loup 115kV11/6/2017 DISIS STAGE   
GEN-2017-233DISIS-2017-00204 SOUTHEASTGradyOKOKGE12/1/2020   215215215ER/NR000WindMinco 345kV11/28/2017 DISIS STAGE   
GEN-2017-232DISIS-2017-00204 SOUTHEASTBryan CountyOKOKGE6/1/2020   52.252.252.2ER/NR000SolarBrown 138kV Substation11/28/2017 DISIS STAGE   
GEN-2017-231DISIS-2017-00204 SOUTHEASTFranklin CountyAROKGE6/1/2020   72.572.572.5ER/NR000SolarBranch 161kV Substation11/28/2017 DISIS STAGE   
GEN-2017-230DISIS-2017-00204 SOUTHEASTLincoln CountyOKOKGE6/1/2020   72.572.572.5ER/NR000SolarTryon 138kV Substation11/28/2017 DISIS STAGE   
GEN-2017-229DISIS-2017-00203 CENTRALJohnson CountyKSKCPL12/31/2020   767676ER/NR000Battery/StorageStilwell 345kV Substation11/30/2017 DISIS STAGE   
GEN-2017-228DISIS-2017-00203 CENTRALJohnson CountyKSKCPL12/1/2020   302.4302.4302.4ER/NR000SolarStilwell 345kV Substation11/30/2017 DISIS STAGE   
GEN-2017-227DISIS-2017-00203 CENTRALSedwick CountyKSWERE12/31/2020   201.6201.6201.6ER/NR000Battery/StorageGordon Evans 138kV Substation11/30/2017 DISIS STAGE   
GEN-2017-226DISIS-2017-00203 CENTRALSedgwick CountyKSWERE12/1/2020   201.6201.6201.6ER/NR000SolarGordon Evans 138kV Substation11/30/2017 DISIS STAGE   
GEN-2017-225DISIS-2017-00203 CENTRALJohnson CountyKSKCPL12/31/2020   767676ER/NR000Battery/StorageCraig 345kV Substation11/30/2017 DISIS STAGE   
GEN-2017-224DISIS-2017-00203 CENTRALJohnson CountyKSKCPL12/1/2020   302.4302.4302.4ER/NR000SolarCraig 345kV Substation11/30/2017 DISIS STAGE   
GEN-2017-222DISIS-2017-00201 NORTHDenisonIAWAPA10/6/2020   180180180ER/NR000WindDenison 230kV Substation11/30/2017 DISIS STAGE   
GEN-2017-221DISIS-2017-00203 CENTRALSedgwickKSWERE12/31/2020   152152152ER/NR000Battery/StorageBuffalo Flats 345kV Substation11/30/2017 DISIS STAGE   
GEN-2017-220DISIS-2017-00203 CENTRALSedgwickKSWERE12/1/2020   201.6201.6201.6ER/NR000SolarBuffalo Flats 345kV Substation11/30/2017 DISIS STAGE   
GEN-2017-219DISIS-2017-00205 SOUTHWESTLambTXSWPS12/1/2020   600600600ER/NR000SolarTolk East 230kV Substation11/30/2017 DISIS STAGE   
GEN-2017-218DISIS-2017-00205 SOUTHWESTLambTXSWPS12/1/2020   600600600ER/NR000SolarTolk-Plant X 230kV Line11/30/2017 DISIS STAGE   
GEN-2017-217DISIS-2017-00205 SOUTHWESTLambTXSWPS12/1/2020   600600600ER/NR000SolarPlant X 230kV Substation11/30/2017 DISIS STAGE   
GEN-2017-216DISIS-2017-00201 NORTHWardNDBEPC12/1/2020   100100100ER/NR000WindLogan 230kV Substation11/30/2017 DISIS STAGE   
GEN-2017-215DISIS-2017-00201 NORTHWardNDBEPC12/1/2020   100100100ER/NR000WindLogan 230kV Substation11/30/2017 DISIS STAGE   
GEN-2017-214DISIS-2017-00201 NORTHWardNDBEPC12/1/2020   100100100ER/NR000WindLogan 230kV Substation11/30/2017 DISIS STAGE   
GEN-2017-213DISIS-2017-00204 SOUTHEASTGrant/KayOKAEPW12/1/2021   300300300ER000HybridSolarClarksville 345kV Substation11/30/2017 DISIS STAGE   
GEN-2017-210DISIS-2017-00202 NEBRASKACedarNENPPD12/1/2021   310310310ER000HybridSolarMcCool 345kV Substation11/30/2017 DISIS STAGE   
GEN-2017-209DISIS-2017-00203 CENTRALMcPhersonKSKCPL12/1/2021   300300300ER000HybridSolarLaCygne - Neosho 345kV11/30/2017 DISIS STAGE   
GEN-2017-208DISIS-2017-00203 CENTRALMcPhersonKSWERE12/1/2021   150150150ER000HybridSolarBenton 138kV Substation11/30/2017 DISIS STAGE   
GEN-2017-205DISIS-2017-00203 CENTRALMcPhearsonKSWERE12/1/2020   310310310ER000HybridSolarEast McPherson 230kV11/30/2017 DISIS STAGE   
GEN-2017-204DISIS-2017-00203 CENTRALMcPhersonKSWERE12/1/2020   210210210ER000HybridSolarReno-Summit 345kV Line11/30/2017 DISIS STAGE   
GEN-2017-203DISIS-2017-00204 SOUTHEASTGrant/KayOKOKGE7/1/20238/1/2023  210210210ER000HybridSolarRenfrow 345kV Substation11/30/2017 DISIS STAGE   
GEN-2017-202DISIS-2017-00203 CENTRALNew MadridMOSWPA12/1/2020   200200200ER/NR000SolarNew Madrid - Sikeston 161kV11/30/2017 DISIS STAGE   
GEN-2017-201DISIS-2017-00202 NEBRASKAWayne CountyNENPPD12/1/2022   250250250ER/NR000WindHoskins 345kV Substation11/30/2017 DISIS STAGE   
GEN-2017-200DISIS-2017-00201 NORTHBeadleSDBEPC12/1/2020   302302302ER/NR000WindGroton 345kV Substation11/30/2017 DISIS STAGE   
GEN-2017-199DISIS-2017-00201 NORTHBeadleSDBEPC12/1/2020   202202202ER/NR000Battery/StorageGroton 345kV Substation11/30/2017 DISIS STAGE   
GEN-2017-198DISIS-2017-00202 NEBRASKAOmahaNEOPPD12/1/202212/31/2022  202020ER/NR000Battery/StorageJones St. No 901 69kV substation11/30/2017 DISIS STAGE   
GEN-2017-197DISIS-2017-00204 SOUTHEASTWoodwardOKWFEC12/1/202212/31/2022  808080ER000Battery/StorageFort Supply SW 138kV Substation11/30/2017 DISIS STAGE   
GEN-2017-196DISIS-2017-00203 CENTRALJohnsonKSKCPL12/1/2020   128128128ER/NR000Battery/StorageWest Gardner 345kV11/30/2017 DISIS STAGE   
GEN-2017-195DISIS-2017-00203 CENTRALJohnsonKSKCPL12/1/2020   500.4500.4500.4ER/NR000SolarWest Gardner 345kV11/30/2017 DISIS STAGE   
GEN-2017-194DISIS-2017-00203 CENTRALShawneeKSWERE12/31/2020   525252ER/NR000Battery/StorageTecumseh 230kV Substation11/30/2017 DISIS STAGE   
GEN-2017-193DISIS-2017-00203 CENTRALShawneeKSWERE12/1/2020   201.6201.6201.6ER/NR000SolarTecumseh 230kV Substation11/30/2017 DISIS STAGE   
GEN-2017-192DISIS-2017-00203 CENTRALOsageKSWERE12/31/2020   525252ER/NR000Battery/StorageWERESwissvale 345kV11/30/2017 DISIS STAGE   
GEN-2017-191DISIS-2017-00203 CENTRALOsageKSWERE12/1/2020   201.6201.6201.6ER/NR000SolarSwissvale 345kV11/30/2017 DISIS STAGE   
GEN-2017-190DISIS-2017-00205 SOUTHWESTBaileyTXSWPS12/31/2020   300.3300.3300.3ER/NR000SolarRoosevelt-Tolk 230kV11/30/2017 DISIS STAGE   
GEN-2017-189DISIS-2017-00203 CENTRALJasperMOWERE12/31/2020   201.6201.6201.6ER/NR000SolarBlackberry - Neosho 345kV line11/30/2017 DISIS STAGE   
GEN-2017-188DISIS-2017-00203 CENTRALBarryMOEMDE12/31/2020   170170170ER/NR000SolarAsbury 161 kV11/30/2017 DISIS STAGE   
GEN-2017-187DISIS-2017-00205 SOUTHWESTTerryTXSWPS12/31/2020   199.5199.5199.5ER/NR000SolarSulphur Springs 115kV Substation11/30/2017 DISIS STAGE   
GEN-2017-186DISIS-2017-00203 CENTRALCass/BatesMOKCPL12/31/2020   100100100ER/NR000SolarKC South-N. Raymore 161 kV11/30/2017 DISIS STAGE   
GEN-2017-185DISIS-2017-00203 CENTRALSumnerKSOKGE12/1/2020   200200200ER/NR000WindViola - Hunters 345kV11/29/2017 DISIS STAGE   
GEN-2017-184DISIS-2017-00203 CENTRALHodgeman/FordKSKCPL12/1/2021   400400400ER/NR000SolarNashua-St. Joe 345kV11/29/2017 DISIS STAGE   
GEN-2017-183DISIS-2017-00203 CENTRALHodgeman/FordKSKCPL12/1/2021   400400400ER/NR000WindNashua-St. Joe 345kV11/29/2017 DISIS STAGE   
GEN-2017-182DISIS-2017-00202 NEBRASKALancasterNENPPD12/1/2020   128128128ER/NR000WindTobias 345kV Substation11/29/2017 DISIS STAGE   
GEN-2017-181DISIS-2017-00202 NEBRASKALancasterNENPPD12/1/2020   300300300ER/NR000WindTobias 345kV Substation11/29/2017 DISIS STAGE   
GEN-2017-179DISIS-2017-00203 CENTRALSedgwickKSWERE12/1/2020   222222222ER/NR000WindGordon Evans 138kV Substation11/29/2017 DISIS STAGE   
GEN-2017-178DISIS-2017-00204 SOUTHEASTGarfieldOKOKGE12/31/2020   525252ER/NR000Battery/StorageWoodring 345kV Substation11/29/2017 DISIS STAGE   
GEN-2017-176DISIS-2017-00205 SOUTHWESTHartTXSWPS9/1/2023   300300300ER/NR000WindNewhart 230kV Substation11/29/2017 DISIS STAGE   
GEN-2017-175DISIS-2017-00201 NORTHTurnerSDWAPA9/30/2023   300300300ER/NR000WindVfodnes-Utica Jct. 230kV11/29/2017 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2017-173DISIS-2017-00204 SOUTHEASTStephenOKAEPW12/1/2020   505050ER/NR000SolarLawton Eastside - Terry Road 345kV11/29/2017 DISIS STAGE   
GEN-2017-172DISIS-2017-00204 SOUTHEASTStephenOKAEPW12/1/2020   505050ER/NR000SolarLawton Eastside - Terry Road 345kV11/29/2017 DISIS STAGE   
GEN-2017-171DISIS-2017-00204 SOUTHEASTStephenOKAEPW12/1/2020   150150150ER/NR000SolarLawton Eastside - Terry Road 345kV11/29/2017 DISIS STAGE   
GEN-2017-169DISIS-2017-00204 SOUTHEASTMcClainOKOKGE12/31/2020   525252ER/NR000Battery/StorageMcClain 138kV11/29/2017 DISIS STAGE   
GEN-2017-168DISIS-2017-00204 SOUTHEASTMcClainOKOKGE12/1/2020   250250250ER/NR000SolarMcClain 138kV11/29/2017 DISIS STAGE   
GEN-2017-167DISIS-2017-00204 SOUTHEASTCarterOKOKGE12/31/2020   525252ER/NR000Battery/StorageSunnyside 345kV11/29/2017 DISIS STAGE   
GEN-2017-166DISIS-2017-00204 SOUTHEASTCarterOKOKGE12/1/2020   250250250ER/NR000SolarSunnyside 345kV11/29/2017 DISIS STAGE   
GEN-2017-164DISIS-2017-00204 SOUTHEASTGarfieldOKOKGE12/1/2020   250250250ER/NR000SolarWoodring 345kV Substation11/29/2017 DISIS STAGE   
GEN-2017-162DISIS-2017-00205 SOUTHWESTTexasOKSWPS7/1/2019   505050ER/NR000WindTexas County 115kV11/29/2017 DISIS STAGE   
GEN-2017-161DISIS-2017-00205 SOUTHWESTCimarron and TexasOKSWPS7/1/2019   505050ER/NR000WindSherman 115kV substation11/29/2017 DISIS STAGE   
GEN-2017-158DISIS-2017-00205 SOUTHWESTParmer/CastroTXSWPS12/31/2020   265265265ER/NR000WindTolk 230kV Substation11/29/2017 DISIS STAGE   
GEN-2017-157DISIS-2017-00204 SOUTHEASTPittsburgOKAEPW12/1/2020   202202202ER/NR000WindPittsburg 345kV Substation11/28/2017 DISIS STAGE   
GEN-2017-156DISIS-2017-00204 SOUTHEASTPittsburgOKAEPW12/1/2020   234234234ER/NR000WindPittsburg 345kV Substation11/28/2017 DISIS STAGE   
GEN-2017-155DISIS-2017-00204 SOUTHEASTMuskogeeOKOKGE12/1/2020   300300300ER/NR000WindMuskogee 345kV Substation11/28/2017 DISIS STAGE   
GEN-2017-154DISIS-2017-00204 SOUTHEASTJohnstonOKOKGE12/1/2020   255255255ER/NR000WindJohnson County 345kV Substation11/28/2017 DISIS STAGE   
GEN-2017-153DISIS-2017-00204 SOUTHEASTMcClainOKOKGE12/1/2020   253253253ER/NR000WindMcClain 138kV11/28/2017 DISIS STAGE   
GEN-2017-152DISIS-2017-00204 SOUTHEASTMcClainOKOKGE12/1/2020   252252252ER/NR000WindMcClain 138kV11/28/2017 DISIS STAGE   
GEN-2017-151DISIS-2017-00205 SOUTHWESTCrosbyTXSWPS10/31/2020   300300300ER000WindTUCO-Oklaunion 345kV11/28/2017 DISIS STAGE   
GEN-2017-150DISIS-2017-00204 SOUTHEASTGradyOKOKGE12/1/2020   250250250ER/NR000SolarMinco 345kV11/28/2017 DISIS STAGE   
GEN-2017-149DISIS-2017-00204 SOUTHEASTJohnstonOKOKGE12/1/2020   258258258ER/NR000WindJohnson County 345kV Substation11/27/2017 DISIS STAGE   
GEN-2017-148DISIS-2017-00203 CENTRALNewtonMOEMDE12/1/2020   202202202ER/NR000WindJoplin 161kV sub11/27/2017 DISIS STAGE   
GEN-2017-147DISIS-2017-00203 CENTRALJohnsonKSKCPL12/1/2020   252252252ER/NR000WindStilwell 345kV11/27/2017 DISIS STAGE   
GEN-2017-146DISIS-2017-00205 SOUTHWESTCastroTXSWPS10/31/2020   151.8151.8151.8ER000WindDeaf Smith-Plant X 230kV11/27/2017 DISIS STAGE   
GEN-2017-145DISIS-2017-00205 SOUTHWESTLeaNMSWPS12/31/2020   110.3110.3110.3ER/NR000SolarRoadrunner 115kV11/27/2017 DISIS STAGE   
GEN-2017-144DISIS-2017-00202 NEBRASKAHolt, Antelope, WheelerNEWAPA12/31/2021   200200200ER/NR000WindHolt County 345kV11/27/2017 DISIS STAGE   
GEN-2017-142DISIS-2017-00203 CENTRALJacksonKSWERE12/1/2020   170170170ER/NR000WindSwissvale 345kV Station11/22/2017 DISIS STAGE   
GEN-2017-141DISIS-2017-00204 SOUTHEASTWagonerOKAEPW12/1/2020   241.7241.7241.7ER/NR000SolarClarksville 345kV Switching Station11/22/2017 DISIS STAGE   
GEN-2017-140DISIS-2017-00204 SOUTHEASTWagonerOKAEPW12/1/2020   160160160ER/NR000SolarClarksville 345kV Switching Station11/22/2017 DISIS STAGE   
GEN-2017-137DISIS-2017-00204 SOUTHEASTOklahomaOKOKGE12/1/2020   295295295ER/NR000WindArcadia 345kV11/22/2017 DISIS STAGE   
GEN-2017-134DISIS-2017-00204 SOUTHEASTOklahomaOKOKGE12/1/2020   250250250ER/NR000WindArcadia 345kV11/22/2017 DISIS STAGE   
GEN-2017-133DISIS-2017-00204 SOUTHEASTOklahomaOKOKGE12/1/2020   200200200ER/NR000WindArcadia 345kV11/22/2017 DISIS STAGE   
GEN-2017-132DISIS-2017-00204 SOUTHEASTOklahomaOKOKGE12/1/2020   400400400ER/NR000WindArcadia 345kV11/22/2017 DISIS STAGE   
GEN-2017-131DISIS-2017-00203 CENTRALWilsonKSWERE12/1/2020   29.629.629.6ER/NR000Battery/StorageAltoona- NE Parson 138kV11/22/2017 DISIS STAGE   
GEN-2017-128DISIS-2017-00203 CENTRALJacksonKSWERE12/1/2020   202202202ER/NR000WindSwissvale 345kV11/20/2017 DISIS STAGE   
GEN-2017-125DISIS-2017-00203 CENTRALOsageKSWERE12/1/2020   252252252ER/NR000WindSwissvale 345kV11/20/2017 DISIS STAGE   
GEN-2017-123DISIS-2017-00203 CENTRALLeavenworthKSWERE12/1/2020   180180180ER/NR000WindStranger Creek 345kV11/20/2017 DISIS STAGE   
GEN-2017-121DISIS-2017-00203 CENTRALSumnerKSWERE12/1/2021   200200200ER/NR000WindSumner 138kV11/17/2017 DISIS STAGE   
GEN-2017-120DISIS-2017-00203 CENTRALDickinson/MarionKSWERE5/1/2027   260260260ER/NR000WindAbilene Energy Center-Northview 115kV11/17/2017 DISIS STAGE   
GEN-2017-119DISIS-2017-00203 CENTRALCloud/MitchellKSSUNC5/1/2024   260260260ER/NR000WindElm Creek 345kV substation11/17/2017 DISIS STAGE   
GEN-2017-118DISIS-2017-00203 CENTRALCloud/MitchellKSSUNC5/1/2024   130130130ER/NR000WindElm Creek 345kV substation11/17/2017 DISIS STAGE   
GEN-2017-117DISIS-2017-00204 SOUTHEASTCanadianOKWFEC12/1/2020   19.819.819.8ER/NR000Battery/StorageEl Reno SW 138kV11/17/2017 DISIS STAGE   
GEN-2017-116DISIS-2017-00205 SOUTHWESTCurry/RooseveltNMSWPS12/1/2021   192.5192.5192.5ER/NR000SolarOasis - Pleasant Hill 230kV11/17/2017 DISIS STAGE   
GEN-2017-115DISIS-2017-00203 CENTRALAtchinson/NodawayMOKCPL5/1/2027   244244244ER/NR000WindHolt County 345 kV11/10/2017 DISIS STAGE   
GEN-2017-114DISIS-2017-00201 NORTHDeweySDBEPC12/31/2021   450450450ER000WindChappelle Creek - Leland Olds 345kV10/23/2017 DISIS STAGE   
GEN-2017-113DISIS-2017-00201 NORTHBennettSDWAPA12/31/2021   119119119ER000WindMartin 115kV10/23/2017 DISIS STAGE   
GEN-2017-112DISIS-2017-00203 CENTRALBatesMOKCPL5/1/2027   200200200ER/NR000WindTap Clinton - Stilwell 161kV11/27/2017 DISIS STAGE   
GEN-2017-111DISIS-2017-00203 CENTRALBatesMOKCPL9/1/2023   152152152ER/NR000SolarTap Clinton - Stilwell 161kV11/27/2017 DISIS STAGE   
GEN-2017-109DISIS-2017-00201 NORTHDawson CountyMTWAPA12/31/2020   320.9320.9320.9ER/NR000WindDawson Co - Ft Peck 230 kV8/30/2017 DISIS STAGE   
GEN-2017-108DISIS-2017-00203 CENTRALHenry CountyMOKCPL12/1/2022   400400400ER/NR000SolarStillwell - Clinton 161kV Line8/26/2017 DISIS STAGE   
GEN-2017-107DISIS-2017-00205 SOUTHWESTPotter CountyTXSWPS4/30/20204/30/2020  404040ER000SolarHighland Park - Asarco 115 kV Line8/7/2017 DISIS STAGE   
GEN-2017-106DISIS-2017-00205 SOUTHWESTRandall CountyTXSWPS4/30/20204/30/2020  404040ER000SolarCanyon West - Dawn 115 kV8/7/2017 DISIS STAGE   
GEN-2017-105DISIS-2017-00202 NEBRASKABurt CountyNEOPPD12/15/2018   757575ER/NR000WindTekamah - Raun 161 kV Line7/12/2017 DISIS STAGE   
GEN-2017-102DISIS-2017-00205 SOUTHWESTRoosevelt CountyNMSWPS4/30/20204/30/2020  67.567.567.5ER000SolarCrossroads 345kV4/30/2020 DISIS STAGE   
GEN-2017-101DISIS-2017-00204 SOUTHEASTHardeman CountyTXAEPW4/30/20204/30/2020  67.567.567.5ER000SolarRussell - Lake Pauline 138 kV Line7/10/2017 DISIS STAGE   
GEN-2017-100IFS-2017-001-20DISIS-2017-00105 SOUTHWESTTexas CountyOKSWPS12/31/201912/31/2021  102.6102.6102.6ER/NR000SolarTexas County 115kV5/31/2017 FACILITY STUDY STAGE   
GEN-2017-099IFS-2017-001-09DISIS-2017-00103 CENTRALEdwards CountyKSSUNC11/1/202111/1/2023  150150150ER/NR000WindPost Rock - Spearville 345 kV5/31/2017 FACILITY STUDY STAGE   
GEN-2017-097IFS-2017-001-24DISIS-2017-00101 NORTHPennington CountySDWAPA1/9/202212/1/2022  128128128ER000SolarUnderwood 115 kV Sub5/31/2017 FACILITY STUDY STAGE   
GEN-2017-094IFS-2017-001-31DISIS-2017-00101 NORTHWessington/Hand CountiesSDWAPA10/6/202010/1/2022  200200200ER/NR000WindFort Thompson-Huron 230 kV5/24/2017 FACILITY STUDY STAGE   
GEN-2017-092IFS-2017-001-04DISIS-2017-00104 SOUTHEASTMuskogee CountyOKOKGE6/1/2023   200200200ER000SolarCanadian River-Muskogee and Muskogee-Seminole 345kV5/30/2017 FACILITY STUDY STAGE   
GEN-2017-090IFS-2017-001-35DISIS-2017-00103 CENTRALBates CountyMOKCPL12/1/2019   150150150ER000SolarAdrian 161 kV sub5/31/2017 FACILITY STUDY STAGE   
GEN-2017-086IFS-2017-001-10DISIS-2017-00103 CENTRALHarper CountyKSWERE12/1/202111/1/2023  150150150ER000WindViola 345kV5/25/2017 FACILITY STUDY STAGE   
GEN-2017-085IFS-2017-001-30DISIS-2017-00102 NEBRASKASaline CountyNENPPD12/31/20196/30/2023  0.60.60.6ER/NR000WindFriend 115kV5/10/2017 FACILITY STUDY STAGE   
GEN-2017-082IFS-2017-001-02DISIS-2017-00103 CENTRALBarton/Jasper CountiesMOEDE7/1/202012/31/2020  149.4149.4149.4ER000WindAsbury Plant 161 kV5/31/2017 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2017-077IFS-2017-001-18DISIS-2017-00104 SOUTHEASTMayes CountyOKAEPW12/1/20216/1/2023  124.7124.7124.7ER000SolarExplorer Claremore Tap EXCLART45/28/2017 FACILITY STUDY STAGE   
GEN-2017-076IFS-2017-001-17DISIS-2017-00104 SOUTHEASTBenton CountyARAEPW12/1/202112/1/2024  52.252.252.2ER000SolarChamber Springs 161kV sub5/28/2017 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2017-075IFS-2017-001-16DISIS-2017-00104 SOUTHEASTJohnston CountyOKOKGE12/1/202112/1/2022  200200200ER000SolarHugo-Sunnyside 345 kV5/28/2017 IA PENDING   
GEN-2017-074IFS-2017-001-15DISIS-2017-00104 SOUTHEASTMayes CountyOKAEPW12/1/20216/1/2023  72.572.572.5ER000SolarPryor Junction 138kV sub5/28/2017 FACILITY STUDY STAGE   
GEN-2017-073IFS-2017-001-14DISIS-2017-00104 SOUTHEASTMayes CountyOKGRDA12/1/202112/1/2022  72.572.572.5ER000SolarDry Gulch 161kV sub5/28/2017 FACILITY STUDY STAGE   
GEN-2017-072IFS-2017-001-37DISIS-2017-00104 SOUTHEASTPayne CountyOKOKGE12/1/202112/1/2022  52.252.252.2ER000SolarGreenwood 138kV sub5/28/2017 IA PENDING   
GEN-2017-071IFS-2017-001-36DISIS-2017-00104 SOUTHEASTPayne CountyOKOKGE12/1/202112/1/2022  124.7124.7124.7ER000SolarGreenwood 138kV sub5/28/2017 IA PENDING   
GEN-2017-068IFS-2017-001-26DISIS-2017-00103 CENTRALSumner CountyKSWERE12/31/202012/31/2023  103.5103.5103.5ER/NR000SolarGordon Evans 138kV Substation5/30/2017 FACILITY STUDY STAGE   
GEN-2017-061IFS-2017-001-25DISIS-2017-00104 SOUTHEASTMayes CountyOKGRDA12/1/20216/1/2023  101.5101.5101.5ER/NR000SolarGRDA1 to CLARMR 5 161kV line5/28/2017 FACILITY STUDY STAGE   
GEN-2017-060IFS-2017-001-01DISIS-2017-00103 CENTRALBarton CountyMOEDE9/1/20204/21/2021  149.4149.4149.4ER000WindLaRussell Energy Center 161kV5/30/2017 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2017-057IFS-2017-001-13DISIS-2017-00104 SOUTHEASTCaddo ParishLAAEPW12/1/202112/1/2024  72.572.572.5ER000SolarHosston 69kV5/30/2017 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2017-048IFS-2017-001-34DISIS-2017-00101 NORTHWilliams CountyNDBEPC8/30/20249/30/2024  300300300ER000WindNeset 230 kV Substation5/31/2017 IA PENDING   
GEN-2017-047IFS-2017-001-19DISIS-2017-00105 SOUTHWESTBeaver CountyOKSWPS12/31/201912/31/2023  102102102ER/NR000WindCole 115kV5/18/2017 FACILITY STUDY STAGE   
GEN-2017-040IFS-2017-001-03DISIS-2017-00104 SOUTHEASTOchiltree CountyTXOKGE6/1/20206/1/2023  200.1200.1200.1ER000SolarCanadian River-Muskogee and Muskogee-Seminole 345kV5/31/2017 IA PENDING   
GEN-2017-036IFS-2017-001-23DISIS-2017-00104 SOUTHEASTKiowa CountyOKAEPW12/1/2022   100100100ER000SolarSnyder - Cache 138 kV5/31/2017 IA PENDING   
GEN-2017-033IFS-2017-001-28DISIS-2017-00105 SOUTHWESTWilbarger CountyTXAEPW12/31/202012/31/2023  200200200ER/NR000WindOklaunion 345 kV sub5/31/2017 IA PENDING   
GEN-2017-032IFS-2017-001-38DISIS-2017-00103 CENTRALKiowa CountyCOSWPS12/1/201911/1/2023  200200200ER000WindFinney - Lamar 345 kV5/31/2017 FACILITY STUDY STAGE   
GEN-2017-027IFS-2017-001-33DISIS-2017-00104 SOUTHEASTCarter CountyOKOKGE11/1/202112/21/2021  140140140ER000WindPooleville-Ratliff (Carter County) 138kV5/31/2017 IA PENDING   
GEN-2017-023IFS-2017-001-22DISIS-2017-00104 SOUTHEASTChoctaw CountyOKWFEC12/1/2019   858585ER/NR000SolarHugo Power Plant 138 kV Sub5/31/2017 FACILITY STUDY STAGE   
GEN-2017-022IFS-2017-001-21DISIS-2017-00103 CENTRALWilson CountyKSWERE12/1/2019   656565ER/NR000SolarAltoona- NE Parson 138kV5/31/2017 FACILITY STUDY STAGE   
GEN-2017-021IFS-2017-001-08DISIS-2017-00103 CENTRALEdwards CountyKSSUNC11/1/202211/1/2023  200200200ER/NR000WindPost Rock - Spearville 345 kV5/30/2017 FACILITY STUDY STAGE   
GEN-2017-018IFS-2017-001-27DISIS-2017-00103 CENTRALBarber CountyKSSUNC12/31/202012/31/2023  189189189ER/NR000SolarThistle 345 kV sub5/30/2017 FACILITY STUDY STAGE   
GEN-2017-014IFS-2017-001-29DISIS-2017-00101 NORTHHaakon CountySDWAPA12/1/202012/31/2024  300300300ER/NR000WindPhilip Tap 230 kV5/22/2017 FACILITY STUDY STAGE   
GEN-2017-011IFS-2017-001-06DISIS-2017-00104 SOUTHEASTEllis CountyOKOKGE12/31/201912/31/2022  151.8151.8151.8ER000SolarBadger-Woodward EHV Dbl Ckt 345kV5/17/2017 IA PENDING   
GEN-2017-010IFS-2017-001-12DISIS-2017-00101 NORTHBowman CountyNDBEPC10/31/2022   200.1200.1200.1ER000WindRhame 230 kV Sub4/14/2017 IA PENDING   
GEN-2017-009IFS-2017-001-39DISIS-2017-00103 CENTRALNeoshoe CountyKSWERE10/31/202010/31/2020  302302302ER000WindNeosho - Caney River 345 kV4/14/2017 IA PENDING   
GEN-2017-005IFS-2017-001-11DISIS-2017-00103 CENTRALBourbon and Crawford CountiesOKWERE12/31/202012/13/2021  190190190ER000WindMarmaton - Litchfield 161 kV4/14/2017 IA PENDINGInterim IGIA effective 3/3/2021 - AB   
GEN-2017-004IFS-2017-001-05DISIS-2017-00103 CENTRALCloud CountyKSITCGP12/31/202112/31/2023  201.6201.6201.6ER000WindElm Creek - Summit 345 kV4/14/2017 FACILITY STUDY STAGE   
GEN-2016-177IFS-2016-002-60DISIS-2016-002-105 SOUTHWESTGainesTXSWPS 7/28/2021  1714.417ER000ThermalGas TurbineXTO-Cornell 115 kV station1/23/2017 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-176IFS-2016-002-67DISIS-2016-002-103 CENTRALNemaha CountyKSWERE12/31/201912/6/2021  302302302ER000WindStranger Creek 345kV12/15/2016 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-174IFS-2016-002-19DISIS-2016-002-103 CENTRALNemahaKSWERE9/15/201911/18/2020  302302302ER000WindStranger Creek 345kV11/30/2016 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-167IFS-2016-002-02DISIS-2016-002-104 SOUTHEASTCaddo ParishLAAEPW9/1/202312/1/2023  73.573.573.5ER/NR000SolarLieberman - North Benton 138 kV Line11/29/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-163IFS-2016-002-34DISIS-2016-002-103 CENTRALHarveyKSWERE9/15/20197/1/2024  252252252ER000WindBenton 345kV11/30/2016 IA FULLY EXECUTED/ON SUSPENSION   
GEN-2016-162IFS-2016-002-38DISIS-2016-002-103 CENTRALMarionKSWERE9/15/20197/1/2024  252252252ER000WindBenton 345kV11/30/2016 IA FULLY EXECUTED/ON SUSPENSION   
GEN-2016-160IFS-2016-002-04DISIS-2016-002-103 CENTRALEllisKSMIDW10/2/202312/31/2023  202020ER/NR000Battery/StoragePost Rock 230kV11/21/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-158IFS-2016-002-17DISIS-2016-002-103 CENTRALAllen CountyKSKCPL9/15/201912/31/2025  252252252ER000WindWest Gardner 345kV11/30/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-157IFS-2016-002-20DISIS-2016-002-103 CENTRALAllen CountyKSKCPL9/15/201912/31/2025  252252252ER000WindWest Gardner 345kV11/30/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-153IFS-2016-002-11DISIS-2016-002-103 CENTRALHarper CountyKSWERE10/30/201911/1/2023  134134134ER000WindViola 345kV11/30/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-151IFS-2016-002-62DISIS-2016-002-101 NORTHBurkeNDBEPC9/15/201912/22/2020  202202202ER000WindTande 345kV11/30/2016 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-150IFS-2016-002-15DISIS-2016-002-103 CENTRALNemahaKSWERE9/22/202212/30/2022  302302302ER000WindStranger Creek 345kV11/30/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-149IFS-2016-002-14DISIS-2016-002-103 CENTRALWashingtonKSWERE9/15/201912/31/2022  302302302ER000WindStranger Creek 345kV11/30/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-147IFS-2016-002-33DISIS-2016-002-102 NEBRASKACheyenneNETriState9/15/201912/31/2023  404040ER000SolarSidney 115 kV Sub11/30/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-146IFS-2016-002-56DISIS-2016-002-104 SOUTHEASTTexasOKAEP9/1/202012/31/2025  175175175ER000WindRiverside 345kV Substation11/29/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-145IFS-2016-002-55DISIS-2016-002-104 SOUTHEASTTexasOKAEP9/1/202012/31/2025  175175175ER000WindRiverside 345kV Substation11/29/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-142IFS-2016-002-52DISIS-2016-002-104 SOUTHEASTTexasOKAEP9/1/202012/31/2025  350350350ER000WindRiverside 345kV Substation11/29/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-141IFS-2016-002-51DISIS-2016-002-104 SOUTHEASTTexasOKAEP9/1/202012/31/2025  350350350ER000WindRiverside 345kV Substation11/29/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-139IFS-2016-002-49DISIS-2016-002-104 SOUTHEASTTexasOKAEP9/1/202012/31/2025  100100100ER000WindRiverside 345kV Substation11/29/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-138IFS-2016-002-48DISIS-2016-002-104 SOUTHEASTTexasOKAEP9/1/202012/31/2025  187.5187.5187.5ER000WindRiverside 345kV Substation11/29/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-137IFS-2016-002-47DISIS-2016-002-104 SOUTHEASTTexasOKAEP9/1/202012/31/2025  187.5187.5187.5ER000WindRiverside 345kV Substation11/29/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-134IFS-2016-002-44DISIS-2016-002-104 SOUTHEAST TexasOKAEP9/1/202012/31/2025  187.5187.5187.5ER000WindRiverside 345kV Substation11/29/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-133IFS-2016-002-43DISIS-2016-002-104 SOUTHEASTTexasOKAEP9/1/202012/31/2025  187.5187.1187.5ER000WindRiverside 345kV Substation11/29/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-132IFS-2016-002-61DISIS-2016-002-104 SOUTHEASTRoger MillsOKAEPW12/31/20176/5/2020  6.16.16.1ER000WindSweetwater 230kV11/30/2016 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-131IFS-2016-002-37DISIS-2016-002-104 SOUTHEASTGradyOKOKGE12/31/201710/25/2021  2.52.52.5ER000WindMinco 345kV11/30/2016 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-130IFS-2016-002-21DISIS-2016-002-101 NORTHMercerNDBEPC9/15/201912/31/2022  202202202ER000WindLeland Olds 345 kV11/30/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-128IFS-2016-002-36DISIS-2016-002-104 SOUTHEASTAlfalfaOKOKGE9/15/201912/31/2023  176176176ER000WindWoodring 345kV11/30/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-126IFS-2016-002-06DISIS-2016-002-104 SOUTHEASTMurrayOKOKGE12/31/201911/24/2021  172.5172.5172.5ER/NR000WindArbuckle 138kV substation11/30/2016 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-125IFS-2016-002-29DISIS-2016-002-105 SOUTHWESTRooseveltNMSWPS12/31/201912/31/2020  747474ER000WindEddy County-Tolk (Crossroads) 345kV11/30/2016 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-124IFS-2016-002-28DISIS-2016-002-105 SOUTHWESTRooseveltNMSWPS12/31/201912/31/2020  150150150ER000WindEddy County-Tolk (Crossroads) 345kV11/30/2016 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-123IFS-2016-002-27DISIS-2016-002-105 SOUTHWESTRooseveltNMSWPS12/31/201912/31/2020  298298298ER000WindEddy County-Tolk (Crossroads) 345kV11/30/20162/19/2021IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-121IFS-2016-002-26DISIS-2016-002-105 SOUTHWESTLeaNMSWPS10/1/202212/1/2022  110110110ER000SolarRoadrunner 115kV11/22/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-119IFS-2016-002-10DISIS-2016-002-104 SOUTHEASTKingfisherOKOKGE5/15/202012/31/2025  600600600ER000WindSpring Creek-Sooner 345kV11/30/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-118IFS-2016-002-05DISIS-2016-002-104 SOUTHEASTKingfisherOKWFEC5/15/20219/10/2021  288288288ER000WindDover Switchyard 138 kV Line11/30/2016 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-115IFS-2016-002-24DISIS-2016-002-103 CENTRALAtchisonMOKCPL GMO)11/16/20203/2/2021  300300300ER000WindNebraska City-Mullen Creek (Holt County MO) 345kV11/30/2016 IA FULLY EXECUTED/COMMERCIAL OPERATIONAs of the COD notice 120 MW have been placed in commercial operation.3/2/2021   
GEN-2016-111IFS-2016-002-18DISIS-2016-002-103 CENTRALMcPhersonKSWERE9/15/20191/15/2024  302302302ER000WindReno - Summit 345kV11/30/2016 IA FULLY EXECUTED/ON SUSPENSIONSuspension Start Date of 3/24/2021   
GEN-2016-102IFS-2016-002-01DISIS-2016-002-104 SOUTHEASTPontotocOKOKGE11/1/202312/1/2023  150.9150.9150.9ER/NR000WindBlue River 138kV11/7/2016 IA FULLY EXECUTED/ON SUSPENSION   
GEN-2016-097IFS-2016-002-31DISIS-2016-002-104 SOUTHEASTCaddoOKAEP9/1/202012/31/2023  100100100ER/NR000WindTap Southwestern-Fletcher Tap 138kV10/19/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-095IFS-2016-002-32DISIS-2016-002-104 SOUTHEASTCaddoOKAEPW9/1/202012/31/2023  200200200ER/NR000WindGracemont-Lawton East Side 345kV12/1/2020 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-094IFS-2016-002-25DISIS-2016-002-101 NORTHHydeSDWAPA10/1/202012/1/2022  200200200ER000WindTap Ft Thompson - Oahe 230kV Line (Single Circuit)10/31/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-091IFS-2016-002-22DISIS-2016-002-104 SOUTHEASTCaddoOKAEP5/6/20201/8/2022  303.6303.6303.6ER000WindGracemont-Lawton East Side 345kV10/3/2016 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-087IFS-2016-002-59DISIS-2016-002-101 NORTHCampbellSDWAPA11/15/201912/31/2023  98.998.998.9ER000WindBismark-Glenham 230 kV line7/25/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-075IFS-2016-001-21DISIS-2016-001-302 NEBRASKAHoltNEWAPA12/31/201712/31/2024  505050ER000WindFort Thompson-Grand Island (Grand Prairie) 345kV3/31/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-074IFS-2016-002-57DISIS-2016-002-102 NEBRASKACusterNENPPD10/30/20207/1/2024  200200200ER000WindSweetwater 345kV4/14/2016 IA FULLY EXECUTED/ON SUSPENSION   
GEN-2016-073IFS-2016-001-48DISIS-2016-001-303 CENTRALKingman CountyKSWERE12/31/201710/30/2022  220220220ER000WINDThistle-Wichita Dbl Ckt (Buffalo Flats) 345kV3/30/2016 IA FULLY EXECUTED/ON SUSPENSION   
GEN-2016-071IFS-2016-001-19DISIS-2016-001-304 SOUTHEASTKayOKOKGE9/30/201811/30/2021  200.1200.1200.1ER000WindMiddleton Tap 138kV Substation3/30/2016 IA FULLY EXECUTED/ON SUSPENSION   
GEN-2016-070IFS-2016-001-18DISIS-2016-001-305 SOUTHWESTCarsonTXSWPS11/1/20165/31/2020  5.35.35.3ER000WindMartin 115 kV Substation3/30/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-068IFS-2016-001-40DISIS-2016-001-304 SOUTHEASTGarfieldOKOKGE9/18/202012/15/2020  250250250ER000WindWoodring 345kV3/30/2016 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-067IFS-2016-001-33DISIS-2016-001-303 CENTRALThomasKSSUNC11/1/20177/24/2019  73.673.673.6ER000WindMingo 345kV3/31/2016 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-063IFS-2016-001-17DISIS-2016-001-304 SOUTHEASTJohnstonOKOKGE12/31/20186/1/2023  200200200ER/NR000WindHugo-Sunnyside 345 kV3/30/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-061IFS-2016-001-15DISIS-2016-001-304 SOUTHEASTGarfield/NobleOKOKGE12/1/201711/21/2020  250.7250.7250.7ER000WindSooner-Woodring 345 kV line3/29/2016 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-057IFS-2016-001-35DISIS-2016-001-304 SOUTHEASTCimarron, Texas CountyOKOKGE8/31/20181/31/2022  499.1499.1499.1ER000WindMathewson 345kV3/31/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-051IFS-2016-001-13DISIS-2016-001-304 SOUTHEASTCusterOKAEPW 12/31/2020  9.89.89.8ER000WindClinton Junction-Weatherford Southeast 138kV3/30/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-050IFS-2016-001-42DISIS-2016-001-302 NEBRASKAWebster CoNENPPD12/1/201712/9/2021  250.7250.7250.7ER000WindAxtell – Post Rock 345 kV3/30/2016 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-047IFS-2016-001-22DISIS-2016-001-304 SOUTHEASTCanadianOKOKGE12/31/20173/24/2018  24824ER000ThermalCTMustang 69kV3/31/2016 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-046IFS-2016-001-12DISIS-2016-001-303 CENTRALFord CountyKSSUNC12/1/201812/23/2021  299299299ER000WindClark County-Ironwood 345kV3/31/2016 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-045IFS-2016-001-34DISIS-2016-001-304 SOUTHEASTCimarron, Texas CountyOKOKGE8/31/201812/31/2021  499.1499.1499.1ER000WindMathewson 345kV3/31/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-043IFS-2016-001-36DISIS-2016-001-302 NEBRASKAWayne CountyNENPPD9/1/20186/27/2020  230230230ER000WindHoskins 345kV3/31/2016 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-037IFS-2017-001-32DISIS-2017-00104 SOUTHEASTWashita CountyOKAEPW6/1/202112/31/2022  300300300ER000WindChisholm-Gracemont 345kV3/31/2016 FACILITY STUDY STAGE   
GEN-2016-036IFS-2016-002-42DISIS-2016-002-101 NORTHChippewa CountyMNWAPA11/17/201811/19/2018  44.644.644.6ER000WindGranite Falls 115kV substation3/28/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-032IFS-2016-001-11DISIS-2016-001-304 SOUTHEASTKingfisher CoOKOKGE2/1/202312/31/2023  200200200ER/NR000WindCrescent Substation 138 kV3/30/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-031IFS-2016-001-10DISIS-2016-001-304 SOUTHEASTKay CountyOKOKGE11/30/20165/29/2018  1.51.51.5ER000WindRose Hill (Open Sky)-Sooner (Ranch Road) 345kV3/25/2016 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-030IFS-2016-001-26DISIS-2016-001-304 SOUTHEASTJohnston CoOKOKGE8/28/20216/1/2023  100100100ER/NR000SolarBrown 138kV3/30/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-028IFS-2016-001-38DISIS-2016-001-304 SOUTHEASTLe Flore CoOKAEPW12/31/201812/27/2019  100100100ER000WindClayton 138 kV Sub3/29/2016 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-022IFS-2016-001-29DISIS-2016-001-304 SOUTHEASTNewkirk, Kay CountyOKOKGE12/31/201712/10/2020  151.8151.8151.8ER000WindRose Hill (Open Sky)-Sooner (Ranch Road) 345kV3/31/2016 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-021IFS-2016-001-31DISIS-2016-001-302 NEBRASKADixon CountyNENPPD12/1/201810/1/2021  298.47298.47298.47ER000WINDHoskins 345kV3/31/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-020IFS-2016-001-27DISIS-2016-001-304 SOUTHEASTWoodward CountyOKWFEC12/31/201812/18/2020  148.4148.4148.4ER000WINDMoreland 138kV Substation4/1/2016 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-017IFS-2016-001-08DISIS-2016-001-301 NORTHHyde CountySDBEPC12/1/201711/23/2020  250.24250.24250.24ER000WindChappelle Creek 345kV3/29/2016 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-016IFS-2016-001-07DISIS-2016-001-303 CENTRALEdwardsKSMIDW12/1/201712/1/2023  78.278.278.2ER000WindNorth Kinsley 115 kV3/29/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-014IFS-2016-001-04DISIS-2016-001-303 CENTRALJoplinMOEDE4/25/20034/30/2020  101010ER000ThermalCTLaRussell Energy Center 161kV3/29/2016 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-013IFS-2016-001-03DISIS-2016-001-303 CENTRALJoplinMOEDE4/25/20034/30/2020  101010ER000ThermalCTLaRussell Energy Center 161kV3/29/2016 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2016-009IFS-2016-001-02DISIS-2016-001-303 CENTRALPonca CityOKOKGE9/30/20186/15/2019  292929ER000ThermalSteam TurbineOsage 69 kV Sub3/24/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-007IFS-2016-001-37DISIS-2016-001-301 NORTHBarnesNDWAPA12/31/201812/31/2024  100.05100.05100.05ER000WindValley City 115 kV3/28/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-004IFS-2016-001-25DISIS-2016-001-301 NORTHOliverNDBEPC10/5/202212/31/2025  202202202ER/NR000WindBasin Electric 230 kV3/10/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2016-003IFS-2016-001-45DISIS-2016-001-304 SOUTHEASTEllisOKOKGE12/31/20178/31/2021  248.4248.4248.4ER000WindBadger-Woodward EHV Dbl Ckt 345kV3/15/2016 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2015-096IFS-2015-002-43DISIS-2015-002-701 NORTHHettinger CountyNDBEPC12/31/201712/29/2016  150150150ER000WindBrady 230kV substation10/19/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-095IFS-2016-001-20DISIS-2016-001-304 SOUTHEASTWoods CountyOKOKGE12/1/20176/1/2020  176176176ER000WindTap Mooreland - Knob Hill 138kV9/21/2015 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2015-093IFS-2015-002-37DISIS-2015-002-704 SOUTHEASTCaddoOKOKGE12/1/201712/31/2022  250250250ER000WindGracemont 345kV9/29/2015 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2015-092IFS-2015-002-36DISIS-2015-002-704 SOUTHEASTGradyOKAEPW12/1/201712/31/2020  250250250ER000WindLawton East Side-Sunnyside (Terry Road) 345kV9/30/2015 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2015-090IFS-2015-002-21DISIS-2015-002-703 CENTRALPrattKSWERE12/1/201712/14/2018  220220220ER000WindThistle-Wichita Dbl Ckt (Buffalo Flats) 345kV9/29/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-089IFS-2016-001-05DISIS-2016-001-301 NORTHBon HommeSDWAPA6/30/20174/22/2020  200200200ER000WindUtica 230 kV Substation10/13/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-088IFS-2015-002-32DISIS-2015-002-702 NEBRASKASalineNENPPD1/1/201912/29/2020  300300300ER/NR000WindTobias 345kV Substation9/30/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-082IFS-2016-001-28DISIS-2016-001-305 SOUTHWESTBeaverOKOKGE12/1/201711/25/2020  200200200ER000WindBeaver County - Woodward EHV Dbl Ckt (Badger) 345kV9/28/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-073IFS-2015-002-20DISIS-2015-002-703 CENTRALLyon CountyKSWERE12/31/201812/19/2019  200.1200.1200.1ER/NR000WindEmporia 345kV9/28/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-069IFS-2015-002-06DISIS-2015-002-703 CENTRALDickenson / Marion CountiesKSWERE12/1/201712/17/2018  300300300ER000WindUnion Ridge 230kV9/21/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-066IFS-2015-002-38DISIS-2015-002-704 SOUTHEASTRoosevelt CountyOKOKGE12/1/201712/31/2022  248.4248.4248.4ER000WindSooner - Cleveland 345kV10/7/2015 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2015-065IFS-2015-002-19DISIS-2015-002-703 CENTRALThomas CountyKSSUNC11/1/20177/1/2019  202.4202.4202.4ER000WindMingo 345kV10/7/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-064IFS-2015-002-18DISIS-2015-002-703 CENTRALThomas CountyKSSUNC11/1/20173/26/2020  197.8197.8197.8ER000WindMingo 115kV10/7/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-063IFS-2015-002-16DISIS-2015-002-704 SOUTHEASTKingfisher CountyOKOKGE12/1/20171/1/2018  300300300ER000WindWoodring-Matthewson 345kV10/6/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-062IFS-2015-002-15DISIS-2015-002-704 SOUTHEASTGarfield CountyOKOKGE3/1/201612/31/2021  4.54.54.5ER000WindBreckinridge 138kV10/6/2015 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2015-057IFS-2015-002-33DISIS-2015-002-704 SOUTHEASTGrady CountyOKOKGE12/1/201612/22/2018  100100100ER000WindMinco 345kV10/6/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-055IFS-2015-002-25DISIS-2015-002-704 SOUTHEASTBeckham CountyOKWFEC10/30/201612/1/2023  404040ER000SolarErick 138kV Substation10/6/2015 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2015-052IFS-2015-002-03DISIS-2015-002-703 CENTRALSumnerKSWERE12/1/201712/31/2022  300300300ER000WindOpen Sky-Rose Hill 345kV10/5/2015 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2015-048IFS-2015-002-11DISIS-2015-002-704 SOUTHEASTMajor County, OKOKOKGE12/1/20174/14/2021  200200200ER000WindCleo Corner 138kV10/5/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-047IFS-2015-002-02DISIS-2015-002-704 SOUTHEASTNoble CountyOKOKGE 12/1/20171/1/2018  300300300ER000WindSooner 345kV10/5/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-046IFS-2015-002-46DISIS-2015-002-701 NORTHWilliams CountyNDBEPC12/1/20175/27/2021  300300300ER000WindTande 345kV10/5/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-045IFS-2015-002-10DISIS-2015-002-704 SOUTHEASTGrady CountyOKAEPW 12/1/201712/12/2019  202020ER000Battery/StorageLawton East Side-Sunnyside (Terry Road) 345kV10/5/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-041IFS-2015-002-41DISIS-2016-00105 SOUTHWESTHale CountyTXSWPS7/1/201510/19/2019  550ER000ThermalCTTUCO 345kV9/30/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-036IFS-2016-001-44DISIS-2016-001-304 SOUTHEASTJohnston CountyOKOKGE12/31/201712/13/2020  303.6303.6303.6ER000WindJohnston County 345kV9/10/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-034IFS-2015-002-08DISIS-2015-002-704 SOUTHEASTKay CountyOKOKGE10/31/201712/10/2020  200200200ER000WindRose Hill (Open Sky)-Sooner (Ranch Road) 345kV8/28/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-025IFS-2015-001-03DISIS-2015-001-403 CENTRALPrattKSWERE12/31/201612/19/2016  220220220ER000WindTap Thistle – Wichita 345kV Dbl CKT3/26/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-024IFS-2015-001-02DISIS-2015-001-403 CENTRALPratt CountyKSWERE12/31/201612/9/2016  220220220ER000WindThistle-Wichita Dbl Ckt (Buffalo Flats) 345kV3/26/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-023IFS-2015-001-08DISIS-2015-001-402 NEBRASKAAntelope & Wheeler CountyNENPPD12/31/20194/1/2024  300.7300.7300.7ER/NR000WindGrand Prairie-Grand Island (Holt County NE) 345kV3/31/2015 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2015-021IFS-2015-001-16DISIS-2015-001-403 CENTRALStantonKSSUNC12/31/20164/7/2020  202020ER/NR000SolarJohnson Corner 115kV4/1/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-016IFS-2015-001-05DISIS-2015-001-403 CENTRALAllen CountyKSKCPL12/31/20179/11/2019  200200200ER/NR000WindTap Marmaton - Centerville 161kV3/20/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-015IFS-2015-001-14DISIS-2015-001-404 SOUTHEASTGrant CountyOKOKGE7/31/201612/8/2017  154.56154.56154.56ER/NR000WindTap Medford Tap – Coyote 138kV3/27/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-014IFS-2015-001-20DISIS-2015-001-405 SOUTHWESTCochran CountyTXSWPS12/1/201612/15/2018  150150150ER000WindTap Cochran - Lehman 115kV substation3/31/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-013IFS-2015-001-18DISIS-2015-001-404 SOUTHEASTKiowa CountyOKWFEC12/1/201612/1/2022  120120120ER/NR000SolarSnyder 138kV3/31/2015 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2015-007IFS-2015-001-01DISIS-2015-001-402 NEBRASKAWayne CountyNENPPD11/8/201912/31/2019  160160160ER000WindHoskins 345kV3/25/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-005IFS-2015-001-04DISIS-2015-001-403 CENTRALDeKalb CountyMOGMO12/31/201712/16/2016  200.1200.1200.1ER000WindMullen Creek-Sibley (Ketchum) 345kV3/25/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2015-001IFS-2015-001-15DISIS-2015-001-404 SOUTHEASTKayOKOKGE12/31/201612/19/2016  200200200ER000WindRose Hill (Open Sky)-Sooner (Ranch Road) 345kV3/4/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2014-064IFS-2014-002-24 DISIS-2014-002-604 SOUTHEASTGarfieldOKOKGE12/1/201612/21/2018  248.4248.4248.4ER000WindOtter 138kV9/30/2014 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2014-057IFS-2014-002-22DISIS-2014-002-604 SOUTHEASTGradyOKAEPW12/31/201612/1/2016  249.9249.9249.9ER000WindLawton East Side-Sunnyside (Terry Road) 345kV9/29/2014 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2014-056IFS-2014-002-21DISIS-2014-002-604 SOUTHEASTCanadianOKOKGE12/31/201612/22/2018  250250250ER000WindMinco 345kV9/29/2014 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2014-040IFS-2014-002-14DISIS-2014-002-605 SOUTHWESTCastroTXSWPS9/1/201612/30/2016  320320320ER000WindCastro 115kV9/26/2014 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2014-039IFS-2014-002-13 DISIS-2014-002-602 NEBRASKASalineNENPPD12/1/20167/1/2021  73.473.473.4ER/NR000WindFriend 115kV9/29/2014 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2014-035IFS-2014-002-12 DISIS-2014-002-605 SOUTHWESTChavesNMSWPS12/31/20166/1/2018  303030ER000SolarChaves County 115kV9/29/2014 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2014-034IFS-2014-002-11DISIS-2014-002-605 SOUTHWESTChavesNMSWPS12/31/201610/21/2016  707070ER000SolarChaves County 115kV9/29/2014 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2014-033IFS-2014-002-10DISIS-2014-002-605 SOUTHWESTChavesNMSWPS12/31/20168/25/2016  707070ER000SolarChaves County 115kV9/29/2014 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2014-032IFS-2014-002-09DISIS-2014-002-602 NEBRASKAAntelope NENPPD10/1/20155/1/2014  10.210.210.2ER/NR000WindMeadow Grove 230kV9/29/2014 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2014-031IFS-2014-002-08 DISIS-2014-002-602 NEBRASKAAntelope CountyNENPPD10/1/20153/30/2016  35.835.835.8ER/NR000WindMeadow Grove 230kV9/26/2014 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2014-028IFS-2014-002-07 DISIS-2014-002-603 CENTRALCherokee CountyKSEDE1/1/20164/1/2016  50050ER000ThermalCCRiverton 161kV9/25/2014 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2014-025IFS-2014-002-05 DISIS-2014-002-603 CENTRALRush KSMIDW10/15/201512/1/2015  2.422.422.42ER000WindTap Nekoma - Bazine (Walnut Creek) 69kV9/25/2014 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2014-021IFS-2014-002-04DISIS-2014-002-603 CENTRALAtchison MOGMO12/1/201611/7/2017  300300300ER/NR000WindNebraska City-Mullen Creek (Holt County MO) 345kV9/2/2014 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2014-020IFS-2014-002-03 DISIS-2014-002-604 SOUTHEASTGrady OKAEPW12/31/201410/10/2017  100100100ER/NR000WindTuttle 138kV7/14/2014 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2014-013IFS-2014-001-07 DISIS-2014-001-102 NEBRASKAAntelope / BooneNENPPD12/31/201412/18/2015  73.573.573.5ER/NR000WindMeadow Grove 230kV3/31/2014 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2014-005IFS-2014-001-05 DISIS-2014-001-104 SOUTHEASTCaddoOKOKGE 6/1/2015  5.75.75.7ER000WindMinco 345kV2/19/2014 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2014-004IFS-2014-001-04 DISIS-2014-001-102 NEBRASKAJeffersonNENPPD 10/29/2013  444ER000WindSteele City 115kV2/19/2014 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2014-002IFS-2014-001-02DISIS-2014-001-104 SOUTHEASTDeweyOKOKGE12/31/20144/8/2015  10.510.510.5ER000WindTatonga 345kV2/18/2014 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2014-001ISIFS-2015-001-21DISIS-2015-002 Prior Queued01 NORTHButteSDWAPA12/15/20159/24/2020  103.24103.24103.24ER000WindSulphur 115kV11/24/2015 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2014-001IFS-2014-001-08DISIS-2014-001-103 CENTRALMarionKSWERE7/15/201410/1/2021  200.6200.6200.6ER000WindTap Wichita - Emporia Energy Center 345kV1/15/2014 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2013-033IFS-2013-002-07DISIS-2013-002-203 CENTRALEllisKSMIDW12/31/20152/27/2016  282828ER/NR000ThermalGasGoodman Energy Center 115kV9/30/2013 IA FULLY EXECUTED/COMMERCIAL OPERATION View 
GEN-2013-032IFS-2013-002-06DISIS-2013-002-202 NEBRASKAAntelopeNENPPD12/31/201612/20/2018  202.5202.5202.5ER000WindAntelope 115kV9/30/2013 IA FULLY EXECUTED/COMMERCIAL OPERATION View 
GEN-2013-029IFS-2013-002-04 DISIS-2013-002-204 SOUTHEASTGrantOKOKGE12/15/20154/8/2016  299299299ER000WindRenfrow 345kV9/30/2013 IA FULLY EXECUTED/COMMERCIAL OPERATION View 
GEN-2013-028IFS-2013-002-03DISIS-2013-002-204 SOUTHEASTMayesOKGRDA4/16/201612/23/2017  538495538ER000ThermalGasTap N Tulsa - GRDA 1 345kV9/30/2013 IA FULLY EXECUTED/COMMERCIAL OPERATION View 
GEN-2013-027IFS-2014-002-02DISIS-2014-002-605 SOUTHWESTBaileyTXSWPS3/31/201612/10/2018  148.4148.4148.4ER/NR000WindTolk - Yoakum 230kV9/30/2013 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2013-022IFS-2013-002-02DISIS-2013-002-205 SOUTHWESTQuayNMSWPS5/1/201512/7/2016  252525ER/NR000SolarNorton 115kV Switching Station9/5/2013 IA FULLY EXECUTED/COMMERCIAL OPERATION View 
GEN-2013-019IFS-2013-002-01DISIS-2013-002-202 NEBRASKALancasterNENPPD6/30/201411/15/2022  73.673.673.6ER/NR000WindMonolith 115kV4/17/2013 IA FULLY EXECUTED/ON SCHEDULE View 
GEN-2013-016IFS-2013-001-03DISIS-2013-001-405 SOUTHWESTHaleTXSWPS12/1/201610/19/2019  203191203ER000ThermalCTTUCO 345kV3/29/2013 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2013-012DISIS-2013-001-404 SOUTHEASTLogan CountyOKOKGE11/30/20148/11/2014  14768147ER000ThermalGasRedbud 345kV3/28/2013 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2013-011IFS-2013-001-02DISIS-2013-001-404 SOUTHEASTHempsteadARAEPW 12/18/2012  304030ER000ThermalCoalTurk 138kV3/28/2013 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2013-008DISIS-2013-001-402 NEBRASKAJeffersonNENPPD12/31/201312/31/2013  1.21.21.2ER000WindSteele City 115kV3/27/2013 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2013-007DISIS-2013-001-404 SOUTHEASTMurrayOKOKGE12/31/201411/23/2015  100100100ER/NR000WindTap Prices Falls - Carter 138kV3/25/2013 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2013-002IFS-2013-001-01DISIS-2013-001-402 NEBRASKALancasterNENPPD12/31/201311/15/2022  50.650.650.6ER/NR000WindMonolith 115kV3/1/2013 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2012-044CrawfordKSWERE11/30/201311/1/2013  222ER000ThermalGasSheffield 69kV12/5/2012 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2012-041DISIS-2012-002-604 SOUTHEASTKayOKOKGE4/15/20154/15/2015  121.585.3121.5ER000ThermalCTRose Hill (Open Sky)-Sooner (Ranch Road) 345kV9/30/2012 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2012-037DISIS-2012-002-605 SOUTHWESTHaleTXSWPS3/1/20153/1/2015  203196203ER000ThermalCTTUCO 345kV9/30/2012 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2012-036DISIS-2012-002-605 SOUTHWESTYoakumTXSWPS6/1/20133/1/2013  777ER000ThermalCTMustang 230kV9/30/2012 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2012-035DISIS-2012-002-605 SOUTHWESTYoakumTXSWPS6/1/20134/1/2015  777ER000ThermalCTMustang 230kV9/30/2012 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2012-034DISIS-2012-002-605 SOUTHWESTYoakumTXSWPS6/1/20134/1/2015  777ER000ThermalCTMustang 230kV9/30/2012 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2012-033DISIS-2012-002-604 SOUTHEASTGarfieldOKOKGE12/1/20149/1/2015  98.8298.8298.82ER000WindBreckinridge 138kV9/28/2012 IA FULLY EXECUTED/COMMERCIAL OPERATION ViewView
GEN-2012-032DISIS-2012-002-604 SOUTHEASTKayOKOKGE11/30/20146/30/2015  299299299ER000WindRose Hill-(Ranch Road) Sooner (Open Sky) 345kV9/28/2012 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2012-028DISIS-2012-002-604 SOUTHEASTWashitaOKWFEC12/1/201412/22/2015  747474ER000WindGotebo 69kV9/28/2012 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2012-024IFS-2012-002-01DISIS-2012-002-603 CENTRALFordKSSUNC12/31/20156/1/2017  180180180ER000WindClark County 345kV9/28/2012 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2012-021DISIS-2012-002-602 NEBRASKALincolnNELES8/1/201312/1/2013  4.84.84.8ER000ThermalGasTerry Bundy Generating Station 115kV9/26/2012 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2012-020DISIS-2012-002-605 SOUTHWESTAbernathy CountyTXSWPS9/30/20156/28/2019  478478478ER000WindTUCO 230kV9/26/2012 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2012-007DISIS-2012-001-403 CENTRALGrant CountyKSSUNC4/1/20144/15/2014  120120120ER/NR000ThermalGasRubart 115kV3/29/2012 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2012-004DISIS-2012-001-404 SOUTHEASTCarter CountyOKOKGE12/31/201311/21/2014  40.840.840.8ER/NR000WindPooleville-Ratliff (Carter County) 138kV3/27/2012 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2012-001DISIS-2012-001-405 SOUTHWESTLynn County TexasTXSWPS11/30/201212/21/2012  61.261.261.2ER000WindTap Grassland - Borden County 230 kv3/8/2012 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2011-057DISIS-2011-002-603 CENTRALSumner CountyKSWERE12/31/201312/30/2015  150150150ER000WindCreswell 138kV9/30/2011 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2011-056BDISIS-2011-002-602 NEBRASKANorth Platte - LexingtonNENPPD6/30/201210/31/2012  4.54.54.5ER000HydroJohn 2 115kV3/8/2012 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2011-056ADISIS-2011-002-602 NEBRASKANorth Platte - LexingtonNENPPD6/30/201210/31/2012  3.63.63.6ER000HydroJohn 1 115kV3/8/2012 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2011-056DISIS-2011-002-602 NEBRASKANorth Platte - LexingtonNENPPD6/30/201210/31/2012  3.63.63.6ER000HydroJeffrey 115kV9/30/2011 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2011-054DISIS-2011-002-604 SOUTHEASTCanadian CountyOKOKGE11/30/201312/31/2014  300300300ER000WindCimarron 345kV9/30/2011 IA FULLY EXECUTED/COMMERCIAL OPERATION ViewView
GEN-2011-050DISIS-2011-002-604 SOUTHEASTGrady CountyOKAEPW12/31/201312/13/2016  108108108ER000WindTap Rush Springs - Marlow 138kV9/30/2011 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2011-048DISIS-2011-002-605 SOUTHWESTDenver CityTXSWPS3/1/20133/1/2013  175165175ER/NR000ThermalCTMustang 230kV9/30/2011 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2011-046DISIS-2011-002-605 SOUTHWESTQuay CountyNMSWPS6/1/20139/5/2013  232323ER000ThermalCTTucumcari 115kV9/29/2011 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2011-045DISIS-2011-002-605 SOUTHWESTLubbockTXSWPS6/1/20135/1/2013  205180205ER000ThermalNG/CTJones 230kV9/29/2011 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2011-040DISIS-2011-002-604 SOUTHEASTMurray CountyOKOKGE12/31/201211/21/2014  111111111ER/NR000WindPooleville-Ratliff (Carter County) 138kV9/16/2011 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2011-037DISIS-2011-002-604 SOUTHEASTApacheOKWFEC1/1/20122/5/2013  6.66.66.6ER000WindBlue Canyon 5 138kV7/1/2011 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2011-027DISIS-2011-001-802 NEBRASKAWinsideNENPPD12/31/201212/17/2018  120120120ER/NR000WindWakefield 230kV3/31/2011 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2011-025DISIS-2011-001-805 SOUTHWESTLorenzoTXSWPS6/30/201212/15/2018  79.9679.9679.96ER000WindTap Floyd County - Crosby County 115kV3/31/2011 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2011-022DISIS-2011-001-805 SOUTHWESTHansfordTXSWPS12/31/201212/31/2022  299299299ER000WindHitchland 345kV3/31/2011 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2011-020DISIS-2011-001-804 SOUTHEASTEllisOKOKGE12/31/201212/31/2020  165.6165.6165.6ER/NR000WindWoodward EHV 345kV3/31/2011 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2011-019DISIS-2011-001-804 SOUTHEASTWoodward CountyOKOKGE12/31/201212/31/2020  175175175ER/NR000WindWoodward EHV 345kV3/31/2011 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2011-018DISIS-2011-001-802 NEBRASKAJefferson CountyNENPPD12/1/201312/31/2013  73.673.673.6ER/NR000WindSteele City 115kV3/31/2011 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2011-014DISIS-2011-001-805 SOUTHWESTBeaver CountyOKOKGE12/31/201312/20/2016  198198198ER000WindBeaver County-Woodward EHV Dbl Ckt (Badger) 345kV3/31/2011 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2011-011DISIS-2011-001-803 CENTRALWestonMOKCPL12/31/20106/5/2012  505050ER000ThermalCoalIatan 345kV3/31/2011 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2011-010DISIS-2011-001-804 SOUTHEASTCaddo CountyOKOKGE12/1/201210/1/2012  100.8100.8100.8ER000WindMinco 345kV3/30/2011 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2011-008DISIS-2011-001-803 CENTRALClark CountyKSSUNC12/1/201512/21/2016  600600600ER000WindClark County 345kV3/29/2011 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2010-057DISIS-2011-001-803 CENTRALLincoln CountyKSMIDW8/1/20129/28/2012  201201201ER/NR000WindRice County 230kV10/27/2010 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2010-055DISIS-2011-001-804 SOUTHEASTSand SpringsOKAEPW12/31/20112/27/2013  4.54.54.5ER000ThermalGasWekiwa 138kV9/30/2010 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2010-051DISIS-2010-002-602 NEBRASKADixon CountyNENPPD12/15/201212/17/2018  200200200ER000WindWakefield 230kV9/30/2010 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2010-040DISIS-2010-002-604 SOUTHEASTCanadian CountyOKOKGE11/30/201111/23/2012  300300300ER000WindCimarron 345kV8/19/2010 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2010-036DISIS-2010-002-603 CENTRALDouglas CountyKSWERE8/1/20128/1/2012  4.64.64.6ER000Hydro6th Street 115kV6/30/2010 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2010-014DISIS-2010-001-805 SOUTHWESTHansford CountyTXSWPS12/31/201312/31/2022  358.8358.8358.8ER000WindHitchland 345kV3/31/2010 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2010-011DISIS-2010-001-804 SOUTHEASTDewey CountyOKOKGE12/31/20112/28/2012  29.729.729.7ER000WindTatonga 345kV3/31/2010 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2010-009DISIS-2010-001-803 CENTRALGray CountyKSSUNC12/1/201112/31/2012  165.6165.6165.6ER000WindBuckner 345kV3/29/2010 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2010-006DISIS-2010-001-805 SOUTHWESTLubbockTXSWPS6/1/20126/30/2011  205180205ER000ThermalGasJones 230kV3/24/2010 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2010-005DISIS-2010-001-803 CENTRALHarper CountyKSWERE12/1/20126/30/2021  299.2299.2299.2ER000WindViola 345kV3/15/2010 IA FULLY EXECUTED/ON SCHEDULE   
GEN-2010-003DISIS-2010-001-803 CENTRALCoffey CountyKSWERE12/31/20117/31/2014  99.599.599.5ER000WindWaverly 345kV3/8/2010 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2010-001DISIS-2010-002-605 SOUTHWESTBeaver CountyOKOKGE1/1/20125/15/2015  300300300ER000WindHitchland-Woodward EHV Dbl Ckt (Beaver County) 345kV3/3/2010 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2009-040DISIS-2010-001-803 CENTRALMarshall CountyKSWERE12/31/20129/3/2016  727272ER000WindTap Smittyville - Knob Hill 115KV8/31/2009 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2009-025DISIS-2009-001-604 SOUTHEASTKay CountyOKOKGE12/31/201111/1/2012  59.859.859.8ER000WindTAP Deer Creek – Sinclair 69kV6/19/2009 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2009-020DISIS-2010-001-803 CENTRALRush CountyKSMIDW12/31/201110/15/2015  48.348.348.3ER000WindTap Nekoma - Bazine (Walnut Creek) 69kV4/15/2009 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2009-008DISIS-2010-001-803 CENTRALNess CountyKSMIDW9/1/201112/1/2015  198.69198.69198.69ER000WindSouth Hays 230kV3/10/2009 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2008-129DISIS-2009-001-603 CENTRALCass CountyMOMIPU5/1/20092/15/2002  72643675ER000ThermalCTPleasant Hill 161kV12/12/2008 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2008-124DISIS-2009-001-603 CENTRALFord CountyKSSUNC1/1/20162/28/2017  200.1200.1200.1ER000WindClark County-Spearville Ckt 1 (Ironwood) 345kV11/14/2008 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2008-123NDISIS-2010-001-802 NEBRASKAWebster CountyNENPPD12/31/201611/16/2017  89.6689.6689.66ER000WindTap Pauline - Hildreth (Rosemont) 115kV11/12/2008 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2008-119OICS-2008-001 Prior Queued02 NEBRASKARichardson CountyNEOPPD12/31/2009   606060ER000WindS1399 161kV10/8/2008 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2008-098DISIS-2010-001-803 CENTRALCoffey CountyKSWERE12/31/201111/30/2015  99.599.599.5ER000WindWaverly 345kV8/22/2008 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2008-092DISIS-2009-001-603 CENTRALEllis CountyKSMIDW12/1/201111/30/2015  200.5200.5200.5ER000WindPost Rock 230kV8/18/2008 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2008-086N02DISIS-2009-001-602 NEBRASKAAntelope CountyNENPPD 12/31/2014  201201201ER000WindMeadow Grove 230kV8/8/2008 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2008-079DISIS-2009-001-603 CENTRALGray CountyKSMKEC12/1/201011/2/2011  98.998.998.9ER000WindCrooked Creek 115kV7/29/2008 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2008-051DISIS-2009-001-605 SOUTHWESTOldham CountyTXSWPS12/31/201012/31/2014  161161161ER000WindPotter County 345kV5/30/2008 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2008-047DISIS-2010-001-805 SOUTHWESTBeaver CountyOKOKGE12/31/201212/31/2014  263.13263.13263.13ER000WindHitchland-Woodward EHV Dbl Ckt (Beaver County) 345kV5/16/2008 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2008-044DISIS-2010-001-804 SOUTHEASTDewey CountyOKOKGE12/1/20112/28/2012  197.8197.8197.8ER000WindTatonga 345kV5/15/2008 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2008-037DISIS-2010-001-804 SOUTHEASTCommanche CountyOKWFEC11/30/201112/17/2011  999999ER000WindTap Washita - Blue Canyon Wind 138kV5/12/2008 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2008-023DISIS-2009-001-604 SOUTHEASTWashita CountyOKAEPW12/1/201011/30/2012  150150150ER000WindHobart Junction 138kV3/28/2008 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2008-022DISIS-2010-001-805 SOUTHWESTChaves CountyNMSWPS9/1/201111/15/2015  299.65299.65299.65ER000WindEddy County-Tolk (Crossroads) 345kV3/28/2008 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2008-021Coffey CountyKSWERE5/16/20115/16/2011  424242ER000NuclearWolf Creek 345kV3/24/2008 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2008-018ICS-2008-001-603 CENTRALFinney CountyKSSWPS12/31/201212/13/2013  250250250ER000WindFinney 345kV3/17/2008 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2008-013ICS-2008-001-604 SOUTHEASTGarfield CountyOKOKGE10/1/201012/7/2012  300300300ER000WindHunter 345kV2/19/2008 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2008-006Caddo ParishLAAEPW6/1/20106/16/2010  303030ER000ThermalGasArsenal Hill 138kV1/31/2008 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2008-005Mayes CountyOKGRDA1/9/20099/2/2009  161616ER000Hydro1/28/2008 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2008-003ICS-2008-001-604 SOUTHEASTWoodwardOKOKGE8/31/200912/14/2009  101.2101.2101.2ER000WindWoodward EHV 138kV1/25/2008 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2008-002Platte CountyMOKACP1/1/20094/12/2009  656565ER000ThermalCoal1/22/2008 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2007-062ICS-2008-001-604 SOUTHEASTHarper CountyOKOKGE12/31/201112/21/2016  424424424ER000WindWoodward EHV 345kV12/27/2007 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2007-052ICS-2008-001-604 SOUTHEASTCaddo CountyOKWFEC5/1/20097/1/2009  150150150ER000ThermalGasAnadarko 138kV11/9/2007 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2007-050ICS-2008-001-604 SOUTHEASTWoodward CountyOKOKGE10/1/200912/23/2010  151.8151.8151.8ER000WindWoodward EHV 138kV10/22/2007 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2007-046ICS-2008-001-605 SOUTHWESTTexas CountyOKSWPS12/31/201112/15/2015  200200200ER000WindHitchland 115kV10/15/2007 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2007-044ICS-2008-001-604 SOUTHEASTBlaine CountyOKOKGE12/1/200912/31/2014  299.2299.2299.2ER000WindTatonga 345kV10/2/2007 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2007-043ICS-2008-001-604 SOUTHEASTGrady CountyOKOKGE12/1/200911/1/2010  200200200ER000WindMinco 345kV10/2/2007 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2007-040DISIS-2009-001-603 CENTRALGray CountyKSSUNC12/15/20106/9/2012  131.1131.1131.1ER000WindBuckner 345kV9/25/2007 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2007-025ICS-2008-001-603 CENTRALBarber CountyKSWERE12/31/200910/1/2012  299.2299.2299.2ER000WindViola 345kV5/24/2007 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2007-021ICS-2008-001-604 SOUTHEASTDewey CountyOKOKGE8/1/200912/31/2014  198.9198.9198.9ER000WindTatonga 345kV5/9/2007 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2007-011N08ICS-2008-001 Prior Queued02 NEBRASKAKnox CountyNENPPD1/1/2009   818181ER000WindBloomfield 115kV3/19/2007 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2006-046ICS-2008-001 Prior Queued04 SOUTHEASTDeweyOKOKGE12/31/20096/6/2011  129.6129.6129.6ER000WindDewey 138kV12/5/2006 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2006-044NDISIS-2009-001-602 NEBRASKAPetersburgNENPPD1/1/201012/31/2011  40.540.540.5ER000WindNorth Petersburg 115kV12/4/2006 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2006-044ICS-2008-001 Prior Queued05 SOUTHWESTHansfordTXSWPS10/1/201012/31/2022  370370370ER000WindHitchland 345kV12/4/2006 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2006-043ICS-2008-001 Prior Queued04 SOUTHEASTBeckham CountyOKAEPW8/1/200812/15/2009  999999ER000WindSweetwater 230kV11/17/2006 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2006-038N019ICS-2008-001 Prior Queued02 NEBRASKABoone CountyNENPPD5/1/201110/31/2011  808080ER000WindPetersburg North 115kV10/26/2006 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2006-038N005ICS-2008-001 Prior Queued02 NEBRASKACuster CountyNENPPD12/1/201012/31/2012  808080ER000WindBroken Bow 115kV10/17/2006 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2006-037N1DISIS-2009-001-602 NEBRASKACuster CountyNENPPD1/1/201012/31/2014  757575ER000WindBroken Bow 115kV10/3/2006 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2006-035ICS-2008-001 Prior Queued04 SOUTHEASTBeckham CountyOKAEPW12/1/20084/27/2012  132132132ER000WindSweetwater 230kV8/29/2006 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2006-03103 CENTRALEllis CountyKSMIDW6/1/20086/1/2008  75.675.675.6ER000ThermalGasKnoll 115kV8/16/2006 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2006-028LyonKSWERE5/1/20096/1/2009  360300360ER000ThermalGasEmporia 345kV8/11/2006 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2006-027LyonKSWERE5/1/20086/1/2008  380310380ER000ThermalGasEmporia 345kV8/11/2006 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2006-026ICS-2008-001 Prior Queued05 SOUTHWESTLeaNMSWPS6/1/20086/1/2008  604604604ER000ThermalGasHobbs 230kV & Hobbs 115kV7/26/2006 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2006-024SICS-2008-001 Prior Queued04 SOUTHEASTHarperOKWFEC12/31/200712/31/2008  18.918.918.9ER000WindBuffalo Bear Tap 69kV7/7/2006 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2006-021ICS-2008-001 Prior Queued03 CENTRALBarber CountyKSITPGP5/31/200812/1/2008  949494ER000WindFlat Ridge Tap 138kV6/21/2006 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2006-020SICS-2008-001 Prior Queued05 SOUTHWESTHansfordTXSWPS9/1/20073/1/2012  202020ER000WindDWS Frisco 115kV12/31/2010 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2006-020NICS-2008-001 Prior Queued02 NEBRASKABloomfieldNENPPD1/1/2009   424242ER000WindBloomfield 115kV6/20/2006 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2006-019GreeneMOSPRM6/1/20101/1/2011  275275275ER000ThermalCoal6/19/2006 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2006-018ICS-2008-001 Prior Queued05 SOUTHWESTHaleTXSWPS6/1/20073/22/2011  168.1168.1168.1ER000ThermalCTTUCO 230kV6/1/2010 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2006-01505 SOUTHWESTDenver CityTXSWPS4/1/20076/1/2007  150150150ER000ThermalGasMustang 230kV4/24/2006 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2006-01004 SOUTHEASTHempstead Co.ARAEPW6/1/201112/20/2012  620610620ER000ThermalCoalTurk 138kV2/27/2006 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2006-008Caddo Prsh.LAAEPW6/1/20086/26/2010  550490550ER000ThermalGasArsenal Hill 138kV2/27/2006 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2006-002ICS-2008-001 Prior Queued04 SOUTHEASTBeckham OKAEPW12/31/200612/28/2010  100.8100.8100.8ER000WindSweetwater 230kV1/9/2006 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2005-024Tulsa CountyOKAEPW6/1/200711/30/2007  181172181ER000ThermalGas12/13/2005 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2005-022Caddo CountyOKAEPW6/1/200712/27/2007  177168177ER000ThermalGas12/13/2005 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2005-013ICS-2008-001 Prior Queued03 CENTRALElk CountyKSWERE11/1/20077/5/2011  199.8199.8199.8ER000WindCaney River 345kV8/22/2005 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2005-012ICS-2008-001 Prior Queued03 CENTRALFord CountyKSSUNC12/31/20159/1/2012  248.4248.4248.4ER000WindClark County-Spearville Ckt 1 (Ironwood) 345kV8/8/2005 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2005-008ICS-2008-001 Prior Queued04 SOUTHEASTHarper CountyOKOKGE7/31/20076/30/2007  120120120ER000WindWoodward 138kV4/1/2005 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2005-003ICS-2008-001 Prior Queued04 SOUTHEASTCaddo & Kiowa CountiesOKWFEC12/1/200512/15/2005  30.630.630.6ER000WindWashita 138kV1/21/2005 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2004-023NICS-2008-001 Prior Queued02 NEBRASKAColumbusNENPPD1/1/2009   757575ER000ThermalCoalColumbus Co 115kV11/29/2004 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2004-023ICS-2008-001 Prior Queued04 SOUTHEASTApacheOKWFEC12/1/200512/15/2005  20.620.620.6ER000WindWashita 138kV10/26/2004 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2004-022NHastingsNENPPD1/1/2005   111111ER000Thermal10/20/2004 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2004-020ICS-2008-001 Prior Queued04 SOUTHEASTCuster CountyOKAEPW12/31/20051/1/2006  272727ER000WindClinton Junction-Weatherford Southeast 138kV10/8/2004 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2004-019NColfax CountyNENPPD1/1/2005   0.10.10.1ER000ThermalGas10/4/2004 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2004-018N1BrownsvilleNENPPD1/1/2005   222222ER000Nuclear9/20/2004 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2004-017NColumbusNENPPD1/1/2007   555ER000Hydro9/13/2004 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2004-01703 CENTRALRiverton SE Cherokee CntyKSEDE1/1/2007   250250250ER/NR000ThermalCT/STRiverton 161kV8/23/2004 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2004-01505 SOUTHWESTDenver City/YoakumTXSWPS4/1/20064/1/2006  150150150ER000ThermalCT7/12/2004 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2004-014ICS-2008-001 Prior Queued03 CENTRALEdwardsKSMKEC11/15/200512/31/2012  152152152ER000WindSpearville 230kV4/22/2004 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2004-00803 CENTRALPlatte CountyMOKCPL6/1/20096/5/2012  850850850ER000ThermalCoal3/26/2004 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2004-002OWashington CountyNEOPPD1/1/2007   484848ER000Nuclear1/21/2004 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2003-022ICS-2008-001 Prior Queued04 SOUTHEASTCuster/WasitaOKAEPW12/31/20041/1/2006  120120120ER000WindClinton Junction-Weatherford Southeast 138kV12/31/2003 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2003-021NICS-2008-001 Prior Queued02 NEBRASKAAinsworthNENPPD10/1/2005   757575ER000WindAinsworth Wind Tap 115kV12/29/2003 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2003-020ICS-2008-001 Prior Queued05 SOUTHWESTCarson CountyTXSWPS6/1/20078/1/2012  159.1159.1159.1ER000WindMartin 115kV12/29/2003 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2003-019ICS-2008-001 Prior Queued03 CENTRALSalina NC Ellsworth CntyKSMIDW11/1/200611/1/2006  249.3249.3249.3ER000WindSmoky Hills Tap 230kV11/24/2003 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2003-017NBrownsvilleNENPPD1/1/2007   505050ER000Nuclear10/15/2003 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2003-008OOtoe CountyNEOPPD5/1/2009   700700700ER000ThermalCoal7/15/2003 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2003-006AICS-2008-001 Prior Queued03 CENTRALCloud CountyKSMKEC    201201201ER000WindElm Creek 230kV7/9/2003 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2003-005ICS-2008-001 Prior Queued04 SOUTHEASTApacheOKWFEC12/1/2006   999999ER000WindAnadarko - Paradise (Blue Canyon) 138kV6/5/2003 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2003-004ICS-2008-001 Prior Queued04 SOUTHEASTApacheOKWFEC12/1/200512/15/2005  100100100ER000WindWashita 138kV6/5/2003 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2002-025AICS-2008-001 Prior Queued03 CENTRALSpearvilleKSMKEC6/1/2006   100.5100.5100.5ER000WindSpearville 230kV10/31/2002 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2002-023NHarmonyNENPPD    0.80.80.8ER000WindHarmony 115kV9/28/2002 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2002-022ICS-2008-001 Prior Queued05 SOUTHWESTOldham County (Wildorado)TXSWPS12/15/2006   239.2239.2239.2ER000WindBushland 230kV9/12/2002 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2002-009ICS-2008-001 Prior Queued05 SOUTHWESTHansford CountyTXSWPS9/30/2006   79.879.879.8ER000WindHansford 115kV7/19/2002 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2002-008ICS-2008-001 Prior Queued05 SOUTHWESTHansford CountyTXSWPS11/1/200712/30/2008  240240240ER000WindHitchland 345kV7/19/2002 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2002-005ICS-2008-001 Prior Queued04 SOUTHEASTHammonOKWFEC12/31/200612/31/2008  123123123ER000WindRed Hills Tap 138kV4/28/2002 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2002-004NGrand IslandNENPPD12/1/2003   808080ER000ThermalGas4/16/2002 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2002-004ICS-2008-001 Prior Queued03 CENTRALBeaumont SE Butler CntyKSWERE9/30/200312/15/2005  153153153ER000WindLatham 345kV4/12/2002 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2001-04003 CENTRALLaRussell Energy Ctr.MOEDE6/1/20034/24/2003  505050ER000ThermalCTLaRussell Energy Center 161kV11/27/2001 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2001-039MICS-2008-001 Prior Queued03 CENTRALWichita CountyKSSUNC12/1/2008   100100100ER000WindCentral Plains Tap 115kV11/1/2001 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2001-039AICS-2008-001 Prior Queued03 CENTRALKiowa CountyKSMKEC    104104104ER000WindShooting Star Tap 115kV10/30/2001 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2001-037ICS-2008-001 Prior Queued04 SOUTHEASTWoodwardOKOKGE10/1/200211/12/2003  102102102ER000WindFPL Moreland Tap 138kV10/18/2001 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2001-036ICS-2008-001 Prior Queued05 SOUTHWESTTucumcariNMSWPS10/1/200212/31/2004  808080ER000WindNorton 115kV Switching Station10/15/2001 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2001-033ICS-2008-001 Prior Queued05 SOUTHWESTChaves County (Melrose)NMSWPS10/1/200212/22/2005  180180180ER000WindSan Juan Tap 230kV9/17/2001 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2001-03003 CENTRALLaRussell Energy CenterMOEDE6/1/20034/25/2003  505050ER000ThermalCTLaRussell Energy Center 161kV9/4/2001 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2001-029NBeatriceNENPPD1/1/20051/1/2005  250250250ER000ThermalGas8/15/2001 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2001-026ICS-2008-001 Prior Queued04 SOUTHEASTMeersOKWFEC10/1/200310/1/2003  74.2574.2574.25ER000WindWashita 138kV7/24/2001 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2001-024Washington CountyARAEPW5/1/20077/1/2007  630580630ER000ThermalCTSWEPCO Tontitown 161kV Substation7/9/2001 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2001-018Neosho CountyKSWERE1/1/20021/1/2002  474747ER000ThermalGasChanute NW Neosho Cnty By Tioga Sub5/15/2001 IA FULLY EXECUTED/COMMERCIAL OPERATION   
GEN-2001-014ICS-2008-001 Prior Queued04 SOUTHEASTSleeping BearOKWFEC6/30/20074/15/2007  94.594.594.5ER000WindFt Supply 138kV4/24/2001 IA FULLY EXECUTED/COMMERCIAL OPERATION   
2022-4444test 444401 NORTH    022000  FEASIBILITY STUDY STAGE   

Download data as CSV